Loading...
HomeMy WebLinkAbout19886 HARVEST DRIVE SurveyZoning = RS-3ENGINEERING REVIEWEDDate:__________________12/12/2019lritchieThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easements