Loading...
HomeMy WebLinkAbout20169 Harvest Dr SurveyZoning = RS-4 The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements *Draintile connection required. ENGINEERING REVIEWED Date: 12/06/2019 rmcdonald