HomeMy WebLinkAboutLA177045 20168 Harvest Dr Permit PackRESIDENTIAL BUILDING
PERMIT APPLICATION
CITY OF LAKEVILLE
BUILDING INSPECTIONS DEPARTMENT
20195 HOLYOKE AVENUE
LAKEVILLE, MN 55044
952-985-4440
Office Use Only
__________________
Permit Number
___________________
Received By
___________________
Date Received
___________________
Fee Total
SITE ADDRESS:
MAILING ADDRESS: CITY: STATE: ZIP:
JOB DESCRIPTION:__________________________________ MASTER PLAN: (Number or Address)____________________
LIST OTHER STRUCTURES ON PROPERTY:_______________________________________________________________
ESTIMATED VALUATION: PROPOSED START DATE: END DATE:
(New Residential Only): LEGAL DESCRIPTION: LOT: _____ BLOCK: _____ SUBDIVISION:
APPLICANT IS: RESIDENT OWNER CONTRACTOR EMAIL
NEW MODEL HOME: YES NO (IF YES – ADMINISTRATIVE PERMIT REQUIRED)
PLEASE FILL OUT THE FOLLOWING COMPLETELY (All Contractor information must be as listed on State License)
RESIDENT OWNER
NAME:_______________________________________________________________________________
HOME PHONE #:_____________________________ CELL PHONE:___________________________
GENERAL CONTRACTOR
Homeowner
Contractor
CONTRACTOR:_______________________________________________________________________
LICENSE #:BC______________ LEAD CERTIFICATE#_______________ (PRE 1978 STRUCTURE)
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
PLUMBING WORK
Homeowner
Contractor
CONTRACTOR:__________________________________________LICENSE #: PM______________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
MECHANICAL WORK
Homeowner
Contractor
CONTRACTOR:________________________________________ _______________________________
OFFICE PHONE #:_____________________________ CELL PHONE:___________________________
ADDRESS:____________________________ CITY:________________ ST:______ ZIP:____________
BOND #:_______________________________________ EXPIRATION DATE____________________
SEWER/WATER CONTRACTOR
New Construction Only
NAME:________________________________________________ ______________________________
HOME PHONE _____________________________ CELL PHONE:______________________________
BOND #:_______________________________________ EXPIRATION DATE____________________
INTEREST EARNINGS ON THE ESCROW ACCOUNTS, IF ANY, ARE RETAINED BY THE CITY TO OFFSET THE
ADMINISTRATIVE COSTS ASSOCIATED WITH PROCESSING THE ESCROW APPLICATION AND REFUND. I HEREBY
APPLY FOR A BUILDING PERMIT AND I ACKNOWLEDGE THAT THE INFORMATION ABOVE IS COMPLETE AND
ACCURATE; THAT THE WORK WILL BE IN CONFORMANCE WITH THE ORDINANCES AND CODES OF THE CITY AND
WITH THE STATE BUILDING CODE, THAT I UNDERSTAND THIS IS NOT A PERMIT AND WORK IS NOT TO START
WITHOUT A PERMIT AND THAT THE WORK WILL BE IN ACCORDANCE WITH THE APPROVED PLAN.
NAME OF APPLICANT (Please Print)DATE
APPLICANT’S SIGNATURE:
www.lakevillemn.gov
RESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode01/29/2020dmathews
Secure door closed until deck isconstructed with a separate permit.
UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.
CS-PFCS-PFCS-PFBWP above oncantilever, block trussspace per detail.
-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
Stone Cottage
HVAC Load Calculations
for
Stone Cottage
20168 Harvest Dr
Lakeville,mn
Prepared By:
Randy Andrews
Lofgren Heating
5708 Upper 147th Street West
Apple Vallley, MN 55124
Wednesday, January 08, 2020
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 2
Project Report
General Project Information
Project Title:Stone Cottage
Project Date:Wednesday, January 08, 2020
Client Name:Stone Cottage
Client Address:20168 Harvest Dr
Client City:Lakeville,mn
Company Name:Lofgren Heating
Company Representative:Randy Andrews
Company Address:5708 Upper 147th Street West
Company City:Apple Vallley, MN 55124
Company E-Mail Address:rrandrews@lofgrenheating-ac.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces South
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Elevation Sensible Adj. Factor:1.000
Elevation Total Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Elevation Heating Adj. Factor:1.000
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 80%n/a 72 n/a
Summer:88 72 47%50%75 29
Check Figures
Total Building Supply CFM:1,233 CFM Per Square ft.:0.353
Square ft. of Room Area:3,492 Square ft. Per Ton:1,179
Volume (ft³) of Cond. Space:31,428
Building Loads
Total Heating Required Including Ventilation Air:52,047 Btuh 52.047 MBH
Total Sensible Gain:26,666 Btuh 80 %
Total Latent Gain:6,632 Btuh 20 %
Total Cooling Required Including Ventilation Air:33,298 Btuh 2.77 Tons (Based On Sensible + Latent)
2.96 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.77 1,258 3,492 26,666 6,632 33,298 52,047 989 1,233 1,233
System 1 Yes 2.77 1,258 3,492 26,666 6,632 33,298 52,047 989 1,233 1,233 21x10
Ventilation 340 1,352 1,692 4,550
Zone 1 3,492 26,326 5,280 31,606 47,497 989 1,233 1,233 21x10
1-Main Level 1,134 11,504 1,837 13,341 18,802 391 539 539 6--6
2-Upper Level 1,224 12,680 2,449 15,129 19,380 404 594 594 7--6
3-Lower Level 1,134 2,142 994 3,136 9,315 194 100 100 1--6
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 4
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
574 15,980 0 12,955 12,955
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2189 12,378 0 1,893 1,893
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
990 4,221 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1224 2,130 0 1,175 1,175
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
834 1,814 0 0 0
Subtotals for structure:38,441 0 16,552 16,552
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 98, Summer CFM: 51 9,056 980 704 1,684
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
Total Building Load Totals:52,047 6,632 26,666 33,298
Check Figures
Total Building Supply CFM:1,233 CFM Per Square ft.:0.353
Square ft. of Room Area:3,492 Square ft. Per Ton:1,179
Volume (ft³) of Cond. Space:31,428
Building Loads
Total Heating Required Including Ventilation Air:52,047 Btuh 52.047 MBH
Total Sensible Gain:26,666 Btuh 80 %
Total Latent Gain:6,632 Btuh 20 %
Total Cooling Required Including Ventilation Air:33,298 Btuh 2.77 Tons (Based On Sensible + Latent)
2.96 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 5
Building Pie Chart
Building
Loss
52,047
Btuh
Floor 3%Roof 4%
Wall 32%
Glass 31%
Door 4%
Infiltration 17%
Ventilation 9%
Building
Gain
33,298
Btuh
Roof 4%Wall 6%
Glass 39%
Door 2%People 12%
Equipment 29%
Infiltration 5%
Ventilation 5%
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 6
System 1 Whole House Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
4A-1a-o: Glazing-Double pane low-e (e = 0.20 or less),
operable window, e=0.20 on surface 2, wood with
metal clad frame, u-value 0.32, SHGC 0.33
574 15,980 0 12,955 12,955
11N: Door-Metal - Polystyrene Core 63 1,918 0 529 529
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs
2189 12,378 0 1,893 1,893
15B0-10sf-10: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 10' floor depth
990 4,221 0 0 0
16B-50: Roof/Ceiling-Under Attic with Insulation on Attic
Floor (also use for Knee Walls and Partition
Ceilings), Vented Attic, No Radiant Barrier, Dark
Asphalt Shingles or Dark Metal, Tar and Gravel or
Membrane, R-50 insulation
1224 2,130 0 1,175 1,175
21A-24: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 24' wide
834 1,814 0 0 0
Subtotals for structure:38,441 0 16,552 16,552
People:9 1,800 2,070 3,870
Equipment:2,500 7,000 9,500
Lighting:0 0 0
Ductwork:0 0 0 0
Infiltration: Winter CFM: 98, Summer CFM: 51 9,056 980 704 1,684
Ventilation: Winter CFM: 140, Summer CFM: 70 4,550 1,352 340 1,692
System 1 Whole House Load Totals:52,047 6,632 26,666 33,298
Check Figures
Supply CFM:1,233 CFM Per Square ft.:0.353
Square ft. of Room Area:3,492 Square ft. Per Ton:1,179
Volume (ft³) of Cond. Space:31,428
System Loads
Total Heating Required Including Ventilation Air:52,047 Btuh 52.047 MBH
Total Sensible Gain:26,666 Btuh 80 %
Total Latent Gain:6,632 Btuh 20 %
Total Cooling Required Including Ventilation Air:33,298 Btuh 2.77 Tons (Based On Sensible + Latent)
2.96 Tons (Based On 75% Sensible
Capacity)
Notes
Calculations are based on 8th edition of ACCA Manual J.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads.
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 7
Detailed Room Loads - Room 1 - Main Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,134.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,134.0 sq.ft.Supply Air:539 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr
Volume:10,206.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:6 Actual Winter Vent.:55 CFM
Runout Air:90 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:31 CFM
Runout Air Velocity:457 ft./min.Percent of Supply:6 %
Runout Air Velocity:457 ft./min.Actual Winter Infil.:43 CFM
Actual Loss:0.131 in.wg./100 ft.Actual Summer Infil.:23 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 30 X 9 170 0.065 5.7 961 0.9 0 147
S -Wall-12F-0sw 30 X 9 161 0.065 5.7 910 0.9 0 139
E -Wall-12F-0sw 40 X 9 306 0.065 5.7 1,730 0.9 0 265
W -Wall-12F-0sw 40 X 9 286 0.065 5.7 1,617 0.9 0 247
S -Door-11N 6 X 7 42 0.350 30.5 1,279 8.4 0 353
S -Door-11N 3 X 7 21 0.350 30.5 639 8.4 0 176
N -Gls-4A-1a-o shgc-0.33 100%S 100 0.320 27.8 2,784 10.4 0 1,041
S -Gls-4A-1a-o shgc-0.33 0%S 46 0.320 27.8 1,281 19.2 0 882
E -Gls-4A-1a-o shgc-0.33 0%S 54 0.320 27.8 1,503 35.0 0 1,890
W -Gls-4A-1a-o shgc-0.33 0%S 74 0.320 27.8 2,060 35.0 0 2,590
Subtotals for Structure:14,764 0 7,730
Infil.: Win.: 43.5, Sum.: 22.6 1,260 3.205 4,038 0.249 437 314
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:1,000 3,000
Room Totals:18,802 1,837 11,504
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 8
Detailed Room Loads - Room 2 - Upper Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,224.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,224.0 sq.ft.Supply Air:594 CFM
Ceiling Height:9.0 ft.Supply Air Changes:3.2 AC/hr
Volume:11,016.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:7 Actual Winter Vent.:57 CFM
Runout Air:85 CFM Percent of Supply.:10 %
Runout Duct Size:6 in.Actual Summer Vent.:34 CFM
Runout Air Velocity:432 ft./min.Percent of Supply:6 %
Runout Air Velocity:432 ft./min.Actual Winter Infil.:45 CFM
Actual Loss:0.117 in.wg./100 ft.Actual Summer Infil.:23 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 30 X 9 190 0.065 5.7 1,074 0.9 0 164
S -Wall-12F-0sw 30 X 9 207 0.065 5.7 1,171 0.9 0 179
E -Wall-12F-0sw 42 X 9 334 0.065 5.7 1,889 0.9 0 289
W -Wall-12F-0sw 42 X 9 305 0.065 5.7 1,725 0.9 0 264
N -Gls-4A-1a-o shgc-0.33 100%S 80 0.320 27.8 2,227 10.4 0 833
S -Gls-4A-1a-o shgc-0.33 0%S 63 0.320 27.8 1,754 19.2 0 1,208
E -Gls-4A-1a-o shgc-0.33 0%S 44 0.320 27.8 1,225 35.0 0 1,540
W -Gls-4A-1a-o shgc-0.33 0%S 73 0.320 27.8 2,032 35.0 0 2,555
UP-Ceil-16B-50 1224 X 1 1224 0.020 1.7 2,130 1.0 0 1,175
Subtotals for Structure:15,227 0 8,207
Infil.: Win.: 44.7, Sum.: 23.3 1,296 3.204 4,153 0.249 449 323
People: 200 lat/per, 230 sen/per:5 1,000 1,150
Equipment:1,000 3,000
Room Totals:19,380 2,449 12,680
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 9
Detailed Room Loads - Room 3 - Lower Level (Average Load Procedure)
General
Calculation Mode:Htg. & clg.Occurrences:1
Room Length:1,134.0 ft.System Number:1
Room Width:1.0 ft.Zone Number:1
Area:1,134.0 sq.ft.Supply Air:100 CFM
Ceiling Height:9.0 ft.Supply Air Changes:0.6 AC/hr
Volume:10,206.0 cu.ft.Req. Vent. Clg:0 CFM
Number of Registers:1 Actual Winter Vent.:27 CFM
Runout Air:100 CFM Percent of Supply.:27 %
Runout Duct Size:6 in.Actual Summer Vent.:6 CFM
Runout Air Velocity:511 ft./min.Percent of Supply:6 %
Runout Air Velocity:511 ft./min.Actual Winter Infil.:9 CFM
Actual Loss:0.163 in.wg./100 ft.Actual Summer Infil.:5 CFM
Item
Description
Area
Quantity
-U-
Value
Htg
HTM
Sen
Loss
Clg
HTM
Lat
Gain
Sen
Gain
N -Wall-12F-0sw 30 X 9 230 0.065 5.7 1,301 0.9 0 199
S -Wall-15B0-10sf-10 30 X 9 270 0.049 4.3 1,151 0.0 0 0
E -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
W -Wall-15B0-10sf-10 40 X 9 360 0.049 4.3 1,535 0.0 0 0
N -Gls-4A-1a-o shgc-0.33 100%S 40 0.320 27.8 1,114 10.4 0 416
Floor-21A-24 1 X 834 834 0.025 2.2 1,814 0.0 0 0
Subtotals for Structure:8,450 0 615
Infil.: Win.: 9.3, Sum.: 4.8 270 3.204 865 0.248 94 67
People: 200 lat/per, 230 sen/per:2 400 460
Equipment:500 1,000
Room Totals:9,315 994 2,142
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Lofgren Htg. & A/C Stone Cottage
Farmington, MN 55024 Page 10
System 1 Room Load Summary
No
Room
Name
Area
SF
Htg
Sens
Btuh
Min
Htg
CFM
Run
Duct
Size
Run
Duct
Vel
Clg
Sens
Btuh
Clg
Lat
Btuh
Min
Clg
CFM
Act
Sys
CFM
---Zone 1---
1 Main Level 1,134 18,802 391 6-6 457 11,504 1,837 539 539
2 Upper Level 1,224 19,380 404 7-6 432 12,680 2,449 594 594
3 Lower Level 1,134 9,315 194 1-6 511 2,142 994 100 100
Ventilation 4,550 340 1,352
System 1 total 3,492 52,047 989 26,666 6,632 1,233 1,233
System 1 Main Trunk Size:21x10 in.
Velocity:846 ft./min
Loss per 100 ft.:0.105 in.wg
Cooling System Summary
Cooling
Tons
Sensible/Latent
Split
Sensible
Btuh
Latent
Btuh
Total
Btuh
Net Required:2.77 80% / 20%26,666 6,632 33,298
Recommended:2.96 75% / 25%26,666 8,889 35,555
Actual:1.00 77% / 23%9,240 2,760 12,000
Equipment Data
Heating System Cooling System
Type:Natural Gas Furnace Standard Air Conditioner
Model:QC-F38-E78-G QC-C12
Indoor Model:S12
Brand:Quikcool FE Series Quikcool AS Series
Description:Hi Efficiency Furnace Standard Efficiency Air Condit
Efficiency:78.3 AFUE 12.4 SEER
Sound:8.1 bels
Capacity:38,000 Btuh 12,000 Btuh
Sensible Capacity:n/a 9,240 Btuh
Latent Capacity:n/a 2,760 Btuh
C:\ ...\20168 HARVEST LAKEVILLE 01082020.rhv Wednesday, January 08, 2020, 12:15 PM
Builders Associaton of Minnesota version 101014
Date Certificate Posted
x Passive (No Fan)
Active (With fan and monometer or
other system monitoring device)
Location (or future location) of Fan:
Other Please Describe Here
x
10/15 x x
x
20 x
20 x
21 x
49 x
x
x
x
x Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
70,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
x Passive
Low: Other, describe:
x Low:
Location of fan(s), describe: Cfm's
4" " round duct OR Flex
" metal duct
ML193UH070
Heating Loss
Manufacturer Lennox
Natural Gas
Output in
Tons:
3 Ton50
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Capacity continuous ventilation rate in cfms:
200CFM
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
26,666Residential Load Calculation
SEER
/EER
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Electric
Make-up Air Select a Type
AO Smith
Domestic Water
Heater
MECHANICAL SYSTEMS
Rating or Size
Efficiency 13 Seer
Building envelope air tightness:
Rim Joist (1st Floor)
GPVL-50 13ACXN042-230 Model
Heating System
Natrual Gas
Lennox Fiberglass, Batts Foundation Wall
R-value
Average U-Factor (excludes skylights and one door) U:
Duct system air tightness:
Cooling SystemTotal R-Value of all Types of InsulationType: Check All That Apply
Mineral Fiberboard Insulation Location
Foam, Closed Cell0.22
Describe other insulated areas Fiberglass, BlownTHERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Non or Not ApplicableAttic
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Rim Joist (2nd Floor+)
0.30
Appliances
Mech Room
Heat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
52,047
Heating Gain Cooling Load
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Place your
logo here
New Construction Energy Code Compliance Certificate
Name of Residential Contractor
Stone Cottage Construction Inc.
MN License Number
Lakeville20168 Harvest Dr
BC636874
City Mailing Address of the Dwelling or Dwelling Unit
Combustion Air Select a Type
Location of duct or system:
33,298
Below Entire Slab Rigid, Extruded Polystyrene Ceiling, flat
NEW RESIDENTIAL CONSTRUCTION SWPPP VERIFICATION
This form must be completed and submitted with all new residential permit applications.
New residential building permits WILL NOT be issued without this completed form.
Project Site Address: _____________________________________________________________________
Company Name: _________________________________________________________________________
Primary Contact: _________________________________________________________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Description of Land Disturbing Activity: _____________________________________________________
NPDES Construction Stormwater Permit # C000 ___ ___ ___ ___ ___ or # SUB00 ___ ___ ___ ___ ___
If you are not covered under a NPDES Construction Stormwater Permit administered by the MPCA, an
erosion and sediment control plan MUST be submitted with the residential building permit application.
“The permittee(s) shall ensure that the individuals are trained by local, state, federal agencies, professional organizations or other entities
in erosion prevention, sediment control, permanent Stormwater management and the Minnesota NPDES/SDS Construction Stormwater
Permit.” (NPDES Construction Stormwater Permit, MPCA)
“The permittee(s) must ensure that a trained person (as identified in Part III.A.3.a) will routinely inspect the entire construction site at least
once every seven (7) days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours.”
(NPDES Construction Stormwater Permit, MPCA)
Contact information of person CERTIFIED to provide weekly onsite erosion and sediment control
inspections and corrective actions:
Name of Person: ________________________________Company: _______________________________
Phone # (24 hr Contact): ______________________ Email: ______________________________________
Entity that Provided Training: ________________________ Certification Expiration Date: ____________
NOTE: Prior to any land-disturbing activity, all erosion and sediment controls must be installed on the project site and on individual lots.
No land disturbing activity may begin until a residential building permit has been issued.
I understand, the above information to be true and I will have read, understood, and accepted all terms and conditions of the National
Pollutant Discharge Elimination System (NPDES) Permit (MN R 100001). The City of Lakeville may issue a STOP WORK ORDER;
withhold building inspections; or, draw on securities/escrows to bring the site into compliance with the NPDES Construction Stormwater
Permit (MN R 100001) or erosion and sediment control plan.
Signature: ________________________________________________ Date:_________________________
Contact the City of Lakeville with questions at erosion@lakevillemn.gov or 952-985-4500
01/21/2020 X
KP