Loading...
HomeMy WebLinkAbout20168 Harvest Dr SurveyZoning = RS-4 EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. ENGINEERING REVIEWED DATE: 01/24/2020 smurphy Structures may not be placed within easements.