HomeMy WebLinkAbout20168 Harvest Dr SurveyZoning = RS-4
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
ENGINEERING REVIEWED
DATE: 01/24/2020 smurphy
Structures may not be placed within
easements.