Loading...
HomeMy WebLinkAbout8080 201st St W SurveyThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONENGINEERING REVIEWEDDATE: 01/28/2020 smurphy* Drain tile connection required* Structures may not be placed within easements