HomeMy WebLinkAboutLA177032 17398 Ely Ave Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Concept Approval
ONLY
Subject to Field Inspection
Inspector Date
2015
MN Bldg
Code
01/28/2020dmathews
8' LIB
4' WSP 4' WSP8' LIB
4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
4' WSP4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
4' WSP
UFER Ground
-Provide 20' Rebar in footing and stub
up near electrical service panel.
3' WSP 5.17' LIB
5.17' LIB
4' WSP
5.17' LIB 5.17' LIB
5.17' LIB
5.17' LIB
5.17' LIB
5.17' LIB
5.17' LIB5.17' LIB
5.17' LIB
5.17' LIB
4' WSP 4' WSP
5.17' LIB
5.17' LIB
5.17' LIB
4' WSP
-Min. 15" clearance to anyobstruction from center of
W.C., 24" in front(typ).
02: Main Level
Member Name Results Current Solution Comments
Master Bedroom Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Foyer Garage Service Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Front Stoop Dropped Beam (V)Passed 2 Piece(s) 2 x 8 Spruce-Pine-Fir No. 1 / No. 2
Garage 8' OHD Passed 2 Piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Garage 16' OHD Passed 2 Piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL
Kitchen Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Dinnete Patio Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
03: Lower Level
Member Name Results Current Solution Comments
Bedroom # 5 Window Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bedroom # 4 Window Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Family Room Patio Door Passed 3 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Flex Room Window Passed 3 Piece(s) 2 x 8 Spruce-Pine-Fir No. 1 / No. 2
Bedroom 4 & 5 Door Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Stairs Flush Beam Passed 2 Piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
17398 Ely Ave, Lakeville, MN.4te
JOB SUMMARY REPORT
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 1 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"710 446 1156 None
2 - Trimmer - SPF 3.00"3.00"1.50"710 446 1156 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1156 @ 1 1/2"3825 (3.00")Passed (30%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)878 @ 1' 1/4"2872 Passed (31%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)2314 @ 4' 3"3946 Passed (59%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.040 @ 4' 3"0.275 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.102 @ 4' 3"0.412 Passed (L/967)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 8' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Master Bedroom WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 8' 6"N/A 7.0
1 - Uniform (PSF)0 to 8' 6"3'20.0 35.0 Snow - Main
2 - Uniform (PLF)0 to 8' 6"N/A 100.0 -Wall - Gable
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 2 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 1.50"1.50"1.50"419 715 1134 None
2 - Trimmer - SPF 1.50"1.50"1.50"419 715 1134 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1134 @ 0 1913 (1.50")Passed (59%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)475 @ 10 3/4"2872 Passed (17%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)874 @ 1' 6 1/2"3946 Passed (22%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.003 @ 1' 6 1/2"0.103 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.005 @ 1' 6 1/2"0.154 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 3' 1" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 1" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Foyer Garage Service DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 3' 1"N/A 7.0
1 - Uniform (PSF)0 to 3' 1"12' 3"20.0 35.0 Snow - Garage
2 - Uniform (PSF)0 to 3' 1"1'20.0 35.0 Snow - Garage
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 3 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 8 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Stud wall - SPF 5.50"5.50"1.50"508 855 1363 None
2 - Trimmer - SPF 3.00"3.00"1.50"402 683 1085 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1084 @ 6' 1 1/2"3825 (3.00")Passed (28%)--1.0 D + 1.0 S (Alt Spans)
Shear (lbs)751 @ 5' 4 3/4"2251 Passed (33%)1.15 1.0 D + 1.0 S (Alt Spans)
Moment (Ft-lbs)1373 @ 3' 5 11/16"2645 Passed (52%)1.15 1.0 D + 1.0 S (Alt Spans)
Live Load Defl. (in)0.034 @ 3' 5 3/8"0.179 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans)
Total Load Defl. (in)0.053 @ 3' 5 7/16"0.269 Passed (L/999+)--1.0 D + 1.0 S (Alt Spans)
System : Roof
Member Type : Drop Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
Member Pitch: 0/12
•Deflection criteria: LL (L/360) and TL (L/240).
•Overhang deflection criteria: LL (2L/360) and TL (2L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 3" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Front Stoop Dropped Beam (V)MEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 3"N/A 5.5
1 - Uniform (PSF)0 to 6' 3" (Front)7'20.0 35.0 Snow - Main
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 4 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 1 3/4" x 9 1/2" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"1139 1914 3053 None
2 - Trimmer - SPF 3.00"3.00"1.50"1139 1914 3053 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3053 @ 1 1/2"7613 (3.00")Passed (40%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2326 @ 1' 1/2"7902 Passed (29%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)6303 @ 4' 4 1/2"11985 Passed (53%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.150 @ 4' 4 1/2"0.283 Passed (L/679)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.240 @ 4' 4 1/2"0.425 Passed (L/426)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 8' 9" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 9" o/c unless detailed otherwise.
Main Level, Garage 8' OHDMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 8' 9"N/A 10.4
1 - Uniform (PSF)0 to 8' 9"12' 6"20.0 35.0 Snow - Garage
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 5 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 1 3/4" x 11 7/8" 1.55E TimberStrand® LSL
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"1449 879 2328 None
2 - Trimmer - SPF 3.00"3.00"1.50"1449 879 2328 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2328 @ 1 1/2"7613 (3.00")Passed (31%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)1984 @ 1' 2 7/8"9878 Passed (20%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)9460 @ 8' 4 1/2"18346 Passed (52%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.244 @ 8' 4 1/2"0.550 Passed (L/811)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.646 @ 8' 4 1/2"0.825 Passed (L/306)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 11' 10" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 16' 9" o/c unless detailed otherwise.
Main Level, Garage 16' OHDMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 16' 9"N/A 13.0
1 - Uniform (PSF)0 to 16' 9"3'20.0 35.0 Snow - Garage
2 - Uniform (PSF)0 to 16' 9"1'100.0 -Wall - Gable
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 6 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 1.50"1.50"1.50"141 227 368 None
2 - Trimmer - SPF 1.50"1.50"1.50"141 227 368 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)369 @ 0 1913 (1.50")Passed (19%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)166 @ 10 3/4"2872 Passed (6%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)300 @ 1' 7 1/2"3946 Passed (8%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.001 @ 1' 7 1/2"0.108 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.002 @ 1' 7 1/2"0.162 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 3' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 3' 3" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Kitchen WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 3' 3"N/A 7.0
1 - Uniform (PSF)0 to 3' 3"4'20.0 35.0 Snow - Main
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 7 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"283 455 738 None
2 - Trimmer - SPF 3.00"3.00"1.50"283 455 738 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)738 @ 1 1/2"3825 (3.00")Passed (19%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)506 @ 1' 1/4"2872 Passed (18%)1.15 1.0 D + 1.0 S (All Spans)
Moment (Ft-lbs)1109 @ 3' 3"3946 Passed (28%)1.15 1.0 D + 1.0 S (All Spans)
Live Load Defl. (in)0.017 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
Total Load Defl. (in)0.028 @ 3' 3"0.313 Passed (L/999+)--1.0 D + 1.0 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Main Level, Dinnete Patio DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Snow
Loads Location (Side)Width (0.90)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 7.0
1 - Uniform (PSF)0 to 6' 6"4'20.0 35.0 Snow - Main
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 8 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.84"1733 798 1593 4124 None
2 - Trimmer - SPF 3.00"3.00"2.73"2586 798 2636 6020 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)5223 @ 5' 4 1/2"5738 (3.00")Passed (91%)--1.0 D + 1.0 S (All Spans)
Shear (lbs)2322 @ 4' 5 3/4"4308 Passed (54%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans)
Moment (Ft-lbs)4330 @ 2' 8 3/8"5919 Passed (73%)1.15 1.0 D + 0.75 L + 0.75 S (All Spans)
Live Load Defl. (in)0.026 @ 2' 8 5/8"0.175 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans)
Total Load Defl. (in)0.051 @ 2' 8 5/8"0.262 Passed (L/999+)--1.0 D + 0.75 L + 0.75 S (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom # 5 WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 10.6
1 - Uniform (PSF)0 to 5' 6"7' 3"15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'80.0 --Wall - Upper Level
3 - Uniform (PLF)0 to 4' 6"N/A 442.6 -595.0 Generated from
Loading Assistant
4 - Point (lb)5' 6"N/A 1231 -1552 Generated from
Loading Assistant
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 9 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"638 990 1628 None
2 - Trimmer - SPF 3.00"3.00"1.50"638 990 1628 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1628 @ 1 1/2"3825 (3.00")Passed (43%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)1024 @ 1' 1/4"2498 Passed (41%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)2040 @ 2' 9"3431 Passed (59%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.022 @ 2' 9"0.175 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.037 @ 2' 9"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom # 4 WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 5' 6"N/A 7.0
1 - Uniform (PSF)0 to 5' 6"9'15.0 40.0 Floor - Main Level
2 - Uniform (PSF)0 to 5' 6"1'90.0 -Wall - Main Level
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 10 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
3 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.74"1253 2080 455 3788 None
2 - Trimmer - SPF 3.00"3.00"1.98"1536 2080 910 4526 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)3779 @ 6' 4 1/2"5738 (3.00")Passed (66%)--1.0 D + 0.75 L + 0.75 S (All Spans)
Shear (lbs)2286 @ 1' 1/4"3746 Passed (61%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)5008 @ 3' 3"5147 Passed (97%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.053 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.085 @ 3' 3"0.313 Passed (L/885)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 3" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Family Room Patio DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 10.6
1 - Uniform (PSF)0 to 6' 6"9'15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 6' 6"1'90.0 --Wall - Main Level
3 - Uniform (PSF)0 to 6' 6"4'20.0 -35.0 Snow - Main
4 - Uniform (PSF)0 to 6' 6"7'10.0 40.0 -Floor - Deck
5 - Point (lb)6' 6"N/A 283 -455
Linked from: Dinnete
Patio Door, Support
1
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 11 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
3 piece(s) 2 x 8 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Snow Total Accessories
1 - Trimmer - SPF 3.00"3.00"1.50"1216 943 341 2500 None
2 - Trimmer - SPF 3.00"3.00"1.50"1216 943 341 2500 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)2178 @ 1 1/2"5738 (3.00")Passed (38%)--1.0 D + 0.75 L + 0.75 S (All Spans)
Shear (lbs)1191 @ 10 1/4"2936 Passed (41%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)2427 @ 3' 3"3449 Passed (70%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.050 @ 3' 3"0.208 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.085 @ 3' 3"0.313 Passed (L/879)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 6' 6" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Flex Room WindowMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Floor Live Snow
Loads Location (Side)Width (0.90)(1.00)(1.15)Comments
0 - Self Weight (PLF)0 to 6' 6"N/A 8.3
1 - Uniform (PSF)0 to 6' 6"7' 3"15.0 40.0 -Floor - Main Level
2 - Uniform (PSF)0 to 6' 6"1'90.0 --Wall - Main Level
3 - Point (lb)0 N/A 543 -341
4 - Point (lb)6' 6"N/A 543 -341
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 12 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Trimmer - SPF 1.50"1.50"1.50"420 1094 1514 None
2 - Trimmer - SPF 1.50"1.50"1.50"420 1094 1514 None
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1514 @ 0 1913 (1.50")Passed (79%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)584 @ 10 3/4"2498 Passed (23%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1104 @ 1' 5 1/2"3431 Passed (32%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.004 @ 1' 5 1/2"0.097 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.006 @ 1' 5 1/2"0.146 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Wall
Member Type : Header
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/360) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 2' 11" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 2' 11" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Bedroom 4 & 5 DoorMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 2' 11"N/A 7.0
1 - Uniform (PSF)0 to 2' 11"18' 9"15.0 40.0 Floor - Main Level
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 13 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
2 piece(s) 2 x 10 Spruce-Pine-Fir No. 1 / No. 2
•Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed.
Bearing Loads to Supports (lbs)
Supports Total Available Required Dead Floor
Live Total Accessories
1 - Stud wall - SPF 3.50"3.50"1.50"407 1033 1440 Blocking
2 - Stud wall - SPF 3.50"3.50"1.50"407 1033 1440 Blocking
All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal.;Drawing is Conceptual
Design Results Actual @ Location Allowed Result LDF Load: Combination (Pattern)
Member Reaction (lbs)1440 @ 2"4463 (3.50")Passed (32%)--1.0 D + 1.0 L (All Spans)
Shear (lbs)892 @ 1' 3/4"2498 Passed (36%)1.00 1.0 D + 1.0 L (All Spans)
Moment (Ft-lbs)1777 @ 2' 9 1/2"3431 Passed (52%)1.00 1.0 D + 1.0 L (All Spans)
Live Load Defl. (in)0.023 @ 2' 9 1/2"0.131 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
Total Load Defl. (in)0.032 @ 2' 9 1/2"0.262 Passed (L/999+)--1.0 D + 1.0 L (All Spans)
System : Floor
Member Type : Flush Beam
Building Use : Residential
Building Code : IBC 2012
Design Methodology : ASD
•Deflection criteria: LL (L/480) and TL (L/240).
•Top Edge Bracing (Lu): Top compression edge must be braced at 5' 7" o/c unless detailed otherwise.
•Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 7" o/c unless detailed otherwise.
•Applicable calculations are based on NDS.
Lower Level, Stairs Flush BeamMEMBER REPORT PASSED
Weyerhaeuser warrants that the sizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values.
Weyerhaeuser expressly disclaims any other warranties related to the software. Use of this software is not intended to circumvent the need for a design
professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation is
compatible with the overall project. Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Products manufactured at
Weyerhaeuser facilities are third-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES
under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports, Weyerhaeuser
product literature and installation details refer to www.weyerhaeuser.com/woodproducts/document-library.
The product application, input design loads, dimensions and support information have been provided by BA; plan dated 12/16/2019.
Weyerhaeuser Notes
Tributary Dead Floor Live
Loads Location (Side)Width (0.90)(1.00)Comments
0 - Self Weight (PLF)0 to 5' 7"N/A 7.0
1 - Uniform (PSF)0 to 5' 7" (Front)9' 3"15.0 40.0 Floor - Main Level
Forte v5.5, Design Engine: V7.3.2.4
1/6/2020 9:26:59 AM
Page 14 of 14
17398 Ely Ave, Lakeville, MN.4te
Forte Software Operator
Alex Schoenbauer, EWP Specialist
Lyman Lumber Company
(952) 470-4803
alex_schoenbauer@lymanlumber.com
Job Notes
Brandl Anderson Homes
17398 Ely Ave, Lakeville, MN
Amber
1/6/2020; #23932
Date Certificate Post
x Passive (No Fan )
Active (With fan and monometer
or other system monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
x
R-15 x
x
R-20 x x
R-20 x x
19+5 x x
R-49 x
R-49 x
R-38 x
R-38+5 x x
X Not applicable, all ducts located in conditioned space
x Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
44,000 Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
93%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
X Passive
x Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
6 " Flex
" metal duct
Balanced Ventilation capacity in cfms:
Capacity continuous ventilation rate in cfms:
Total ventilation (intermittent + continuous) rate in cfms:
82 High:
Energy Recover Ventilator (ERV) Capacity in cfms: High:
Location of duct or system:
Below Entire Slab
Foundation Wall
Perimeter of Slab on Grade
Rim Joist (1st Floor)
Rim Joist (2nd Floor+)
Wall
Ceiling, flat
R-5 where required
R10 Rigid Exterior, R10 Int closed cell
R10 Rigid Exterior, R10 Int closed cell
R5 Exterior, R19 Batts
New Construction Energy Code Compliance Certificate
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel.
Mailing Address of the Dwelling or Dwelling Unit City
Lakeville17398 Ely Ave.
Name of Residential Contractor
MECHANICAL VENTILATION SYSTEM
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
Combustion Air Select a Type
Select Type
Heat Recover Ventilator (HRV) Capacity in cfms: 192
MN License Number
Brandl Anderson Homes BC604388
THERMAL ENVELOPE RADON CONTROL SYSTEM
Type: Check All That Apply
Insulation Location
Total R-Value of all Types of InsulationNon or Not ApplicableFiberglass, BlownFiberglass, BattsFoam, Closed CellFoam Open CellMineral FiberboardRigid, Extruded PolystyreneRigid, IsocynurateAttic
Residential Load Calculation
Heating Loss Heating Gain Cooling Load
35248 13666 17,590
13 Location of duct or system:
Rating or Size
50 Output
in Tons:2
Efficiency
SEER
/EER
Natural Gas Natural Gas Electric
13ACXN024
Fuel Type
Manufacturer Lennox Lennox
Model ML193UH045
Average U-Factor (excludes skylights and one door ) U: 0.30
Solar Heat Gain Coefficient (SHGC): 0.30 R-value R-8
MECHANICAL SYSTEMS Make-up Air Select a Type
Appliances Heating System
Domestic Water
Heater Cooling System
Duct system air tightness:
Heating or Cooling Ducts Outside Conditioned Spaces
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
Describe other insulated areas
Building envelope air tightness:
Windows & Doors
000000Builders Associaton of Minnesota version 101014
40,000
X
X
40,000
40,000
3000
3000
3000
40,000
40,000 13.33
13.33
2640
2640 .88
.88 .12
.12 1.6
1.4
NR
3352
503
503
260
375
375
175
88
01/21/2020 X
KP