Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA176870 19981 Henley Lane Permit Pack
RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: FUCHS Residence SAN FRAN PLAN FRONT ELEVATION 'ST' 01 Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 01/08/2020dmathews FUCHS Residence SAN FRAN PLAN ELEVATIONS 02 Secure door closed until deck is constructed with a separate permit. FUCHS Residence SAN FRAN PLAN FOUNDATION 03 8 UFER Ground -Provide 20' Rebar in footing and stub up near electrical service panel. 5,000 PSI MIX REQUIRED FUCHS Residence SAN FRAN PLAN FIRST FLOOR 04 12 8 CS-PF CS-PF CS-PF FUCHS Residence SAN FRAN PLAN SECOND FLOOR 05 Temper -Min. 15" clearance to anyobstruction from center of W.C., 24" in front(typ). FUCHS Residence SAN FRAN PLAN CROSS SECTION 'A' 06 FUCHS Residence SAN FRAN PLAN CROSS SECTION 'B' 07 FUCHS Residence SAN FRAN PLAN DETAILS 08 FUCHS Residence SAN FRAN PLAN PORTAL FRAME 09 54' 0"50' 0"2' 0"20' 0"20' 0"12' 0" 2' 0"40' 0"6' 0"6' 0"2' 0"22' 8"17' 4"8' 0"24' 0"18' 0"8' 0"18' 10"5' 2"26' 0"16' 0"2' 0"4' 0"4' 0"2' 0"14' 4"6' 2"25' 6"1' 0"1' 0"24' 4"15' 8"10' 0"18' 0"6' 0"A A A A A A A A A A Roof Hangers: A - HUS26 ( 10 pc's ) T r a y V a u l t A03B01 C01 D01 H01 I01 I02 F01G01G03AG05V01 V02 V03 V04 E01 E03 R01(7) A02 (3 ) A 0 1 (7) C02(4) C03(2) F02 (9) G02(3) G03(4) G04 (2) G03A (14) E02 54' 0"50' 0"2' 0"20' 0"20' 0"12' 0" 2' 0"40' 0"6' 0"6' 0"2' 0"22' 8"17' 4"8' 0"24' 0"18' 0"8' 0"18' 10"5' 2"26' 0"18' 8"3' 7"3' 7"16' 0"2' 0"4' 0"4' 0"2' 0"14' 4"6' 2"25' 6"1' 0"1' 0"24' 4"15' 8"10' 0"15' 6"2' 6"3' 6"4' 6"18' 9"3' 6"3' 6"22' 3" UPPER LEVEL FLOOR LAYOUT 18" FT @ 19.2" O.C. Start layout from this wall<<<<O 1' 4" to face of first truss A A A A Floor Hangers: A - THA422 ( 6 pc's )FB01FB03FB07FB10FB11FB05FB03W01(4) FB09 (7) FB02 (8) FB08 (4) FB04 (3) FB06 54' 0"50' 0"2' 0"20' 0"20' 0"12' 0" 2' 0"40' 0"6' 0"6' 0"2' 0"22' 8"17' 4"8' 0"24' 0"18' 0"8' 0"18' 10"5' 2"26' 0"18' 8"3' 7"3' 7"16' 0"2' 0"4' 0"4' 0"11' 2"15' 8"2' 4"4' 0"4' 0"MAIN LEVEL FLOOR LAYOUT 18" FT @ 19.2" O.C. A A Start layout from this wall<<<<O 1' 4" to face of first truss 2x8 balloon frame2x8 balloon frame2x8 balloon frameFA02FA01FA03FA07FA07(7) FA01 (3) FA04 (2) FA05 (4) FA06 (13) FA01 page 1 of 2BATCHJOB:8449 BATCHJOB:8449 Date: 12/20/2019 Quote# 13277 Emmerich Wood Products Inc. Eternity Homes 3115 162nd Lane 425 Third St Andover, MN 55304 Farmington, MN 55024 (763) 427-4155 612-290-3445 Sales Rep:AWE Pat Flynn Designer:LSP Job:ET SanFran1200 19981 Henley Ln Lakeville, MN ITEM QTY TRUSS ID SPAN PITCH OVERHANGS PRICE 1 21 FA01 25'11" 0 0.00/0.00 0.00/ 0.00 0.00 2 1 FA02 18' 1" 4 0.00/0.00 0.00/ 0.00 0.00 3 1 FA03 18' 1" 4 0.00/0.00 0.00/ 0.00 0.00 4 3 FA04 18' 1" 4 0.00/0.00 0.00/ 0.00 0.00 5 2 FA05 14'11" 4 0.00/0.00 0.00/ 0.00 0.00 6 4 FA06 17'11" 0 0.00/0.00 0.00/ 0.00 0.00 7 2 FA07 7' 9"12 0.00/0.00 0.00/ 0.00 0.00 8 1 FB01 10' 0" 0 0.00/0.00 0.00/ 0.00 0.00 9 7 FB02 27'11" 0 0.00/0.00 0.00/ 0.00 0.00 10 2 FB03 20' 1" 4 0.00/0.00 0.00/ 0.00 0.00 11 4 FB04 17' 7" 4 0.00/0.00 0.00/ 0.00 0.00 12 1 FB05 28'11" 0 0.00/0.00 0.00/ 0.00 0.00 13 3 FB06 28'11" 0 0.00/0.00 0.00/ 0.00 0.00 14 1 FB07 26'11" 0 0.00/0.00 0.00/ 0.00 0.00 15 8 FB08 27'11" 0 0.00/0.00 0.00/ 0.00 0.00 16 4 FB09 17'11" 0 0.00/0.00 0.00/ 0.00 0.00 17 1 FB10 17'11" 0 0.00/0.00 0.00/ 0.00 0.00 18 1 FB11 7' 9"12 0.00/0.00 0.00/ 0.00 0.00 19 3 W01 27'11" 0 0.00/0.00 0.00/ 0.00 0.00 20 3 A01 5' 0" 0 6.00/0.00 16.50/ 0.00 0.00 21 7 A02 4' 0" 0 6.00/0.00 16.50/ 0.00 0.00 22 1 A03 4' 0" 0 6.00/0.00 16.50/ 0.00 0.00 23 1 B01 20' 0" 0 8.00/0.00 16.50/ 16.50 0.00 24 1 C01 32' 0" 0 8.00/0.00 16.50/ 16.50 0.00 25 7 C02 32' 0" 0 8.00/0.00 16.50/ 16.50 0.00 26 4 C03 32' 0" 0 8.00/0.00 0.00/ 16.50 0.00 27 1 D01 6' 0" 0 8.00/0.00 16.50/ 0.00 0.00 28 1 E01 2' 0" 0 8.00/0.00 16.50/ 0.00 0.00 29 14 E02 2' 0" 0 8.00/0.00 16.50/ 0.00 0.00 30 1 E03 2' 0" 0 8.00/0.00 16.50/ 0.00 0.00 31 1 F01 18' 0" 0 8.00/0.00 16.50/ 16.50 0.00 32 2 F02 18' 0" 0 8.00/0.00 16.50/ 16.50 0.00 33 1 G01 28' 0" 0 8.00/0.00 16.50/ 16.50 0.00 34 9 G02 28' 0" 0 8.00/0.00 16.50/ 16.50 0.00 35 3 G03 27' 9" 0 8.00/0.00 16.50/ 0.00 0.00 36 3 G03A 25' 8" 8 8.00/0.00 17.00/ 0.00 0.00 37 4 G04 25' 8" 8 8.00/0.00 17.00/ 0.00 0.00 38 1 G05 25' 8" 8 8.00/0.00 17.00/ 0.00 0.00 39 1 H01 14' 4" 0 8.00/0.00 16.50/ 16.50 0.00 40 1 I01 20' 6" 0 8.00/0.00 16.50/ 16.50 0.00 41 2 I02 20' 6" 0 8.00/0.00 16.50/ 0.00 0.00 page 2 of 2BATCHJOB:8449 ITEM QTY TRUSS ID SPAN PITCH OVERHANGS PRICE 42 1 R01 3'10"15 4.80/0.00 20.63/ 0.00 0.00 43 1 V01 16' 2" 0 8.00/0.00 0.00/ 0.00 0.00 44 1 V02 12' 2" 0 8.00/0.00 0.00/ 0.00 0.00 45 1 V03 8' 2" 0 8.00/0.00 0.00/ 0.00 0.00 46 1 V04 4' 2" 0 8.00/0.00 0.00/ 0.00 0.00 Miscellaneous Items ITEM QTY DESCRIPTION UNIT PRICE 47 6 THA422/MSH422 Floor Strap Hangers 0.00 0.00 48 10 HUS26/THD26 Heavy Duty Hanger 0.00 0.00 49 1 Floor/Roof Truss Pkg 2019 Base 13836.00 13836.00 Total 144 Sub-Total 13836.00 Sales Tax @ 7.125 985.82 Total Selling Price 14821.82 Price includes floor and roof trusses only. All joists, beams, bracing and framing material are to be supplied by others Price is valid for 30 days Terms: 1% 10 days / Net Due 30 days =================================== Burnsville Heating & Air Conditioning, Inc. 3451 W. Burnsville Pkwy, Suite 120, Burnsville, MN 55337 Phone 952-894-0005 – Fax 952-894-0925 – Web www.burnsvilleheating.com _____________________________________________________________________________________ Ventilation, Makeup and Combustion Air Calculations Submittal Form for New Dwellings Site address 19981 Henley Lane Date 1/13/20 Contractor Burnsville Heating & Air Conditioning, Inc Completed By Alan Dobson VENTILATION REQUIREMENTS TABLE R403.5.2 NUMBER OF BEDROOMS 1 2 3 4 5 6 2 Conditioned space1 (in sq. ft.) Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous Total/ Continuous 1000-1500 60/40 75/40 90/45 105/53 120/60 135/68 1501-2000 70/40 85/43 100/50 115/58 130/65 145/73 2001-2500 80/40 95/48 110/55 125/63 140/70 155/78 2501-3000 90/40 105/53 120/60 135/68 150/75 165/83 3001-3500 100/50 115/58 130/65 145/73 160/80 175/88 3501-4000 110/55 125/63 140/70 155/78 170/85 185/93 4001-4500 120/60 135/68 150/75 165/83 180/90 195/98 4501-5000 130/65 145/73 160/80 175/88 190/95 205/103 5001-5500 140/70 155/78 170/85 185/93 200/100 215/108 5501-6000 2 150/75 165/83 180/90 195/98 210/105 225/113 1. Conditioned space includes the basement and conditioned crawl spaces. 2. If conditioned space exceeds 6000sp. Ft. or there are more than 6 bedrooms, use Equation R403.5.2 R403.5.2 Total Ventilation rate. The mechanical ventilation system shall provide sufficient outdoor air to equal the total ventilation rate average for each 1- hour period in accordance with Table R403.5.2, or Equation 403.5.2, based on the number of bedrooms and square footage of conditioned space, including the basement and conditioned crawl spaces. For the purposes of Table R403.5.2 and Section R403.5.3, the following applies” a. Equation R403.5.2 Total ventilation rate: Total ventilation rate (cfm) = (0.02 x square feet of conditioned space) + (15 x (number of bedrooms =1)) b. Equation R403.5.2.1 Continuous ventilation rate: Continuous ventilation rate (cfm) = Total ventilation rate/2 Amount Total ________155_________ Amount Continuous _______78________ 12/31/19XKP