Loading...
HomeMy WebLinkAbout19981 Henley Lane SurveyZoning = RS-3*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________01/06/2020aoxborough