HomeMy WebLinkAbout17929 Euclid Ave SurveyPROPOSED ELEV 920.8Zoning = RS-4EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easementsThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.ENGINEERING REVIEWEDDate: 12/06/2019 rmcdonald