Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LA176673 19853 Henley Lane Permit Pack
RESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: JOHNSON Residence DALLAS 50 PLAN FRONT ELEVATION "ST" 01 Concept Approval ONLY Subject to Field Inspection Inspector Date 2015 MN Bldg Code 01/07/2020dmathews Johnson Residence DALLAS 50 PLAN ELEVATIONS 02 Secure door closed until deck is constructed with a separate permit. Johnson Residence DALLAS 50 PLAN FOUNDATION 03 UFER Ground -Provide 20' Rebar in footing and stub up near electrical service panel. 8 Smoke CO Smoke Smoke Johnson Residence DALLAS 50 PLAN FIRST FLOOR 04 Smoke CO Smoke FAN FAN 8 CS-PF 8 CS-PF CS-PF Johnson Residence DALLAS 50 PLAN CROSS SECTION A 05 Johnson Residence DALLAS 50 PLAN CROSS SECTION B 06 Johnson Residence DALLAS 50 PLAN DETAILS 07 Johnson Residence DALLAS 50 PLAN PORTAL FRAME 08 52' 0"57' 0"12' 0"20' 6"19' 6" 8' 0"24' 0"8' 0"12' 0" 8' 0"44' 0"32' 0"12' 0"2' 0"24' 0"31' 0"13' 0"11' 0"33' 0"3' 10"5' 2"48' 0"20' 8"3' 10"8' 6"11' 2"12' 4"20' 6" 9' 8"6' 8"6"Tray vault VaultVaultVaultFlat FlatFlat Flat Vault A01 B01 C01 D01D04AD05AD05D06CAP01CAP01V04V05V06V07V08V09V10V15V14V13V12V01 V02 V03V16V11C02(11) B02(21) CAP02 (5) D 03 (4 ) D 0 2 (4) D 04 (3) D0 7 (2) D 07 A 52' 0"57' 0"12' 0"20' 6"19' 6" 8' 0"24' 0"8' 0"12' 0" 8' 0"44' 0"32' 0"12' 0"2' 0"24' 0"31' 0"13' 0"11' 0"33' 0"3' 10"5' 2"48' 0"20' 8"3' 10"8' 6"11' 2"12' 4"20' 6" 9' 8"6' 8"7' 8"6"12' 5"31' 0"2' 0"18' 8"22' 6"3' 10"11' 5"14' 0" MAIN LEVEL FLOOR LAYOUT 18" FT @ 19.2" O.C. \/ \/\/ \/ - Window trimmers locations* Note extra trusses provided * \/\/\/ O >>> Start layout from this wall1' 5-7/16" to face of first truss 2x8 balloon frame2x8 balloon frame2x8 balloon frameFA05FA02FA05FA04FA04(6) FA01 (8 ) F A 0 3 (3) FA0 6 (5) FA07 (5) FA0 8 (7) FA0 9 (15) FA04 page 1 of 2BATCHJOB:8448 BATCHJOB:8448 Date: 12/20/2019 Quote# 13276 Emmerich Wood Products Inc. Eternity Homes 3115 162nd Lane 425 Third St Andover, MN 55304 Farmington, MN 55024 (763) 427-4155 612-290-3445 Sales Rep:AWE Pat Flynn Designer:LSP Job:Dallas 50(Johnson) 19853 Henley Ln Lakeville, MN ITEM QTY TRUSS ID SPAN PITCH OVERHANGS PRICE 1 6 FA01 32'11" 0 0.00/0.00 0.00/ 0.00 0.00 2 1 FA02 33' 5" 0 0.00/0.00 0.00/ 0.00 0.00 3 8 FA03 20' 9" 4 0.00/0.00 0.00/ 0.00 0.00 4 17 FA04 24' 7" 4 0.00/0.00 0.00/ 0.00 0.00 5 2 FA05 12' 3"12 0.00/0.00 0.00/ 0.00 0.00 6 3 FA06 9' 1" 4 0.00/0.00 0.00/ 0.00 0.00 7 5 FA07 8' 7" 4 0.00/0.00 0.00/ 0.00 0.00 8 5 FA08 19' 7" 4 0.00/0.00 0.00/ 0.00 0.00 9 7 FA09 23' 7" 4 0.00/0.00 0.00/ 0.00 0.00 10 1 A01 20' 6" 0 7.00/0.00 16.50/ 16.50 0.00 11 1 B01 32' 6" 0 7.00/0.00 16.50/ 16.50 0.00 12 11 B02 32' 5" 8 7.00/0.00 16.50/ 0.00 0.00 13 1 C01 8' 0" 0 7.00/0.00 16.50/ 0.00 0.00 14 1 C02 8' 0" 0 7.00/0.00 16.50/ 0.00 0.00 15 2 CAP01 10' 3" 2 7.00/0.00 9.52/ 9.52 0.00 16 21 CAP02 10' 3" 2 7.00/0.00 9.52/ 9.52 0.00 17 1 D01 54' 0" 0 7.00/4.00 16.50/ 16.50 0.00 18 4 D02 54' 0" 0 7.00/4.00 16.50/ 16.50 0.00 19 5 D03 54' 0" 0 7.00/4.00 16.50/ 0.00 0.00 20 4 D04 32'11" 8 7.00/4.00 16.50/ 0.00 0.00 21 1 D04A 33' 5" 8 7.00/4.00 16.50/ 0.00 0.00 22 1 D05 32'11" 8 7.00/0.00 16.50/ 0.00 0.00 23 1 D05A 33' 5" 8 7.00/0.00 16.50/ 0.00 0.00 24 1 D06 32'11" 8 7.00/0.00 16.50/ 0.00 0.00 25 3 D07 32'11" 8 7.00/0.00 16.50/ 0.00 0.00 26 2 D07A 33' 5" 8 7.00/0.00 16.50/ 0.00 0.00 27 1 V01 11' 6" 0 7.00/0.00 0.00/ 0.00 0.00 28 1 V02 7' 6" 0 7.00/0.00 0.00/ 0.00 0.00 29 1 V03 3' 6" 0 7.00/0.00 0.00/ 0.00 0.00 30 1 V04 20' 3"12 7.00/0.00 0.00/ 0.00 0.00 31 1 V05 18' 3"12 7.00/0.00 0.00/ 0.00 0.00 32 1 V06 16' 3"12 7.00/0.00 0.00/ 0.00 0.00 33 1 V07 14' 3"12 7.00/0.00 0.00/ 0.00 0.00 34 1 V08 11' 9"12 7.00/0.00 0.00/ 0.00 0.00 35 1 V09 9' 9"12 7.00/0.00 0.00/ 0.00 0.00 36 1 V10 7' 9"12 7.00/0.00 0.00/ 0.00 0.00 37 1 V11 5' 9"12 7.00/0.00 0.00/ 0.00 0.00 38 1 V12 12' 8" 8 7.00/0.00 0.00/ 0.00 0.00 39 1 V13 10' 9"12 7.00/0.00 0.00/ 0.00 0.00 40 1 V14 8' 9"12 7.00/0.00 0.00/ 0.00 0.00 41 1 V15 6' 9"12 7.00/0.00 0.00/ 0.00 0.00 page 2 of 2BATCHJOB:8448 ITEM QTY TRUSS ID SPAN PITCH OVERHANGS PRICE 42 1 V16 4' 9"12 7.00/0.00 0.00/ 0.00 0.00 Miscellaneous Items ITEM QTY DESCRIPTION UNIT PRICE 43 1 Floor/Roof Truss Pkg 2019 base 15338.00 15338.00 44 1 Johnson modifications, add 502.00 502.00 Total 131 Sub-Total 15840.00 Sales Tax @ 7.125 1128.60 Total Selling Price 16968.60 Price includes floor and roof trusses only. All joists, beams, bracing and framing material are to be supplied by others Price is valid for 30 days Terms: 1% 10 days / Net Due 30 days =================================== 12/31/19XKP