HomeMy WebLinkAbout7723 205th Street West SurveyA. 1/28/20: Client*DROP GARAGE TOP OF BLOCK 0.67'*James R. Hill, Inc.
2500 WEST C.R. 42, SUITE 120, BURNSVILLE, MN 55337
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FORDRAWN BYDATEREVISIONSSHP1/21/2020CAD FILEPRO-ECT NO.SHEET 1 OF 1400037.dwg400037Lot 6, Block 1, CEDAR CROSSINGS,
Dakota County, MinnesotaDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevation1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: July 13, 20187.Plan No. 3035-B 'FINNEGAN'NOTESLot= 10,479 sq. ft.House/Garage= 2,461 sq. ft.Porch= 122 sq. ft.Driveway= 709 sq. ft.Sidewalk= 70 sq. ft.Patio= 18 sq. ft.Total Impervious= 3,380 sq. ft. or 32.25% of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 991.43Garage Top of Foundation= 991.83House Top of Foundation= 992.5Lowest Floor= 989.3Lot 6, Block 1, CEDAR CROSSINGS, Dakota County, MinnesotaPROPERTY DESCRIPTION7723 205th Street West, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 21st day of January, 2020Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lots 4 and 5, Block 2 = 995.88BENCHMARKZoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATIONENGINEERING REVIEWEDDate:__________________02/11/2020aoxborough