HomeMy WebLinkAboutItem 7City of Lakeville
Public Works
Memorandum
To: Mayor and City Council
Justin Miller, City Administrator
From: Allyn Kuennen, Assistant City Administrator
Neil Normandin, Public Works & Facilities Coordinator
Copy: Paul Oehme, Public Works Director
Mac Cafferty, Environmental Resources Manager
Date: February 24, 2020
Subject: City Hall Front Entrance Landscaping and Plaza Design
In the 2020 budget the City Council approved updating the landscaping and plaza at the front
entrance to City Hall. The intent was to reduce the amount of concrete that needed to be
maintained and eliminate the tripping hazards presented by the offset concrete panels
including the removal and replacement of overgrown trees and landscaping with suitable
plantings.
Staff worked with consultants from Wenck to prepare plans that eliminated the offset concrete
panels and incorporated a more welcoming and aesthetically designed plaza, improved
drainage of water from the roof and improved landscaping.
Two basic concepts were produced that are similar in footprint but offer different designs for
the plaza area at the front entrance. Both concepts, in terms of basic features, cost
approximately $120,000. Options that incorporate unique design features (raised planting
areas and bench seating) will add between $20,000 and $40,000 to that basic cost, depending
on the options chosen. The majority of the project will be funded from the Building Fund with
the stormwater and irrigation system work to be funded from the Stormwater Management
Fund.
Staff and representative from Wenk will be available at the work session to present and discuss
the attached concepts.
Concept 1
Concept 1
Concept 1
DWN BY:ISSUE DATE:PROJECT NO.:5895-0021M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:1/29/2020 8:15:20 AMSUB CONSULTANT:CLIENT:CITY OFLAKEVILLECITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXXCHK'D BY:LNJAPP'D BY:LNJCERTIFICATION:C-100CONCEPT 1JAN 2020012/18/2019 FOOTPRINT CONCEPTS0Rock French Drain- Allows surface drainage- Provides visual seperation betweenplaza and Corten wall- Minimizes staining of concrete fromCortenDesign Options1: River Rock2: Dresser Trap RockSeating ElementsElement 1: Wooden Bench on top of seat wallElement 2: Downtown bench on pavement11 2C-101Concept 1
DWN BY:ISSUE DATE:PROJECT NO.:5895-0021M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:1/29/2020 8:15:20 AMSUB CONSULTANT:CLIENT:CITY OFLAKEVILLECITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXXCHK'D BY:LNJAPP'D BY:LNJCERTIFICATION:C-100CONCEPT 1JAN 2020012/18/2019 FOOTPRINT CONCEPTS0Retaining WallOption 1: Welded Panel Corten SteelOption 2: Building color brick with concrete cap (to match downtown)Option 3: Concrete BlockBicycle ParkingOption 1: Match downtownOption 2: Ring Bike Rack (2 or 3)12C-102Concept 1
DWN BY:ISSUE DATE:PROJECT NO.:5895-0021M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:1/29/2020 8:15:20 AMSUB CONSULTANT:CLIENT:CITY OFLAKEVILLECITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXXCHK'D BY:LNJAPP'D BY:LNJCERTIFICATION:C-100CONCEPT 1JAN 2020012/18/2019 FOOTPRINT CONCEPTS0Integral Color Concrete BandOption 1:Compliment Building. Broomed Finish.Color: Cappucino.Option 2: Accentuate Plaza. Granite Texture.Color: Medium Gray.Option 3: Accentuate Plaza. Stamped Paver.Color: Tan.C-103Concept 1
DWN BY:ISSUE DATE:PROJECT NO.:5895-0021M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:1/29/2020 8:15:20 AMSUB CONSULTANT:CLIENT:CITY OFLAKEVILLECITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXXCHK'D BY:LNJAPP'D BY:LNJCERTIFICATION:C-100CONCEPT 1JAN 2020012/18/2019 FOOTPRINT CONCEPTS0Shade TreeOption 1: GinkgoOption 2: IronwoodOption 3: LindenArt PadFlag PolesTurf GrassScoring pattern borrowed from downtownC-104Slope PlantingOption 1: BoxwoodOption 2: Prairie Dropseed and Purple Conefl owerOption 3: Little Bluestem12 3Concept 1
DWN BY:ISSUE DATE:PROJECT NO.:5895-0021M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:SHEET TITLE:1/29/2020 8:15:20 AMSUB CONSULTANT:CLIENT:CITY OFLAKEVILLECITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXXCHK'D BY:LNJAPP'D BY:LNJCERTIFICATION:C-100CONCEPT 1JAN 2020012/18/2019 FOOTPRINT CONCEPTS0C-105Cross-Section/PerspectiveTurf GrassSlope PlantingRetaining Wall Corten SteelFrench DrainBenchesAA’AA’LightingOption 1: Reuse Existing BollardsOption 2: Uplight Trees and/or FlagsOption 3: Integral Seat Wall LightingConcept 1
Concept 2
Concept 2
Concept 2
DWN BY:
ISSUE DATE:
PROJECT NO.:5895-0021
M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:
SHEET TITLE:1/29/2020 8:14:59 AMSUB CONSULTANT:
CLIENT:
CITY OF
LAKEVILLE
CITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXX CHK'D BY:LNJ APP'D BY:LNJ
CERTIFICATION:
C-200
CONCEPT 2
JAN 2020
012/18/2019 FOOTPRINT CONCEPTS0Seatwall Planters
Option 1: Natural stone
face with concrete cap
Option 2: Building color
brick with concrete cap
(to match downtown)
Option 3: Concrete
Block
Bicycle Parking
Option 1: Match downtown
Option 2: Ring Bike Rack (2 or 3)
1 2
C-201
Concept 2
DWN BY:
ISSUE DATE:
PROJECT NO.:5895-0021
M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:
SHEET TITLE:1/29/2020 8:14:59 AMSUB CONSULTANT:
CLIENT:
CITY OF
LAKEVILLE
CITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXX CHK'D BY:LNJ APP'D BY:LNJ
CERTIFICATION:
C-200
CONCEPT 2
JAN 2020
012/18/2019 FOOTPRINT CONCEPTS0Integral Color Concrete Bands
Option 1:
Compliment Building.
Broomed Finish.
Color: Canvas.
Option 2:
Accentuate Plaza.
Stamped Paver.
Color: Match Building
(Bark Brown)
Option 3:
Accentuate Plaza.
Stamped Rock Replica.
Color: Sandstone
C-202
Concept 2
DWN BY:
ISSUE DATE:
PROJECT NO.:5895-0021
M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:
SHEET TITLE:1/29/2020 8:14:59 AMSUB CONSULTANT:
CLIENT:
CITY OF
LAKEVILLE
CITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXX CHK'D BY:LNJ APP'D BY:LNJ
CERTIFICATION:
C-200
CONCEPT 2
JAN 2020
012/18/2019 FOOTPRINT CONCEPTS0Planter Planting
Option 1: Flowering
Perennials
Option 2: Monoculture
Shrub
Option 3: Native
Perennials
Low Garden Planting
Option 1: Hosta
Option 2: Nepita
Option 3: Priarie Dropseed
1 2 3
Accent Planting
Option 1: Hydrangea
Option 2:Purple
Coneflower
Option 3: Mock Orange
C-203
Concept 2
DWN BY:
ISSUE DATE:
PROJECT NO.:5895-0021
M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:
SHEET TITLE:1/29/2020 8:14:59 AMSUB CONSULTANT:
CLIENT:
CITY OF
LAKEVILLE
CITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXX CHK'D BY:LNJ APP'D BY:LNJ
CERTIFICATION:
C-200
CONCEPT 2
JAN 2020
012/18/2019 FOOTPRINT CONCEPTS0Ornamental Tree or Shrub
Option 1: Redbud
Option 2:
Jane Magnolia
Option 3:
Sargent Cherry
Art Pad
Flag Poles
Turf Grass
Scoring pattern
borrowed from
downtown
Low Garden Border
Option 1: Stamped concrete
Option 2: Brick pavers
Option 3: Stone pavers
1 2 3
C-204
Concept 2
DWN BY:
ISSUE DATE:
PROJECT NO.:5895-0021
M:\5895\0021 City Hall\CAD\3 PLANSHEETS\Concept Plan.dwgDESCRIPTION:DATE:ISSUE NO.:ISSUE NO.:SHEET NO.:
SHEET TITLE:1/29/2020 8:14:59 AMSUB CONSULTANT:
CLIENT:
CITY OF
LAKEVILLE
CITY OF LAKEVILLE, MNCITY HALL ENTRY20195 HOLYOKE AVE.LAKEVILLE, MN 55044PROJECT TITLE:XXX CHK'D BY:LNJ APP'D BY:LNJ
CERTIFICATION:
C-200
CONCEPT 2
JAN 2020
012/18/2019 FOOTPRINT CONCEPTS0C-205
Cross-Section/Perspective
Turf GrassConcrete
Band
Low Garden
Planting
Low Garden
Planting
Seat Wall
Planter
Concrete Band
A
A’
A A’
Lighting
Option 1:
Reuse Existing Bollards
Option 2: Uplight Trees
and/or Flags
Option 3: Integral Seat
Wall Lighting
Concept 2