REPORT OF CONSTRUCTION
OBSERVATIONS AND TESTING
SERVICES
Park Nicollet Lakeville Clinic
18484 Kachina Court
Lakeville, Minnesota 55044
AET Project No. 20-21161
Date: February 6, 2020
Prepared for: Park Nicollet Health Services 6500 Excelsior Boulevard
St. Louis Park, Minnesota 55427
www.amengtest.com
CONSULTANTS
ENVIRONMENTAL
GEOTECHNICAL
MATERIALS
FORENSICS
February 6, 2020
Park Nicollet Health Services
6500 Excelsior Boulevard St. Louis Park, Minnesota 55427
Attn: Mr. Greg Harris (gregory.harris@parknicollet.com)
RE: Report of Construction Observations and Testing Services Park Nicollet Lakeville Clinic
18484 Kachina Court
Lakeville, Minnesota 55044 AET Project No. 20-21161
Dear Mr. Harris:
This final report summarizes the results of the observations and testing services we performed during construction of the Park Nicollet Lakeville Clinic project in Lakeville, Minnesota.
If you have questions about this report, or if we can be of further assistance, please call or e-mail
me.
Very truly yours, American Engineering Testing, Inc.
Brandon D. Newberger, PE Staff Engineer
Phone: (651) 603-6635
Email: bnewberger@amengtest.com
550 Cleveland Avenue North St. Paul, MN 55114
Phone 651-659-9001 Toll Free 800-972-6364 Fax 651-659-1379 www.amengtest.com AA/EEO
This document shall not be reproduced, except in full, without written approval from American Engineering Testing, Inc.
CONSULTANTS
ENVIRONMENTAL
GEOTECHNICAL MATERIALS FORENSICS
REPORT OF CONSTRUCTION OBSERVATIONS AND TESTING
PARK NICOLLET LAKEVILLE CLINIC 18484 KACHINA COURT LAKEVILLE, MINNESOTA 55044 AET PROJECT No. 20-21161
INTRODUCTION
Purpose
The Park Nicollet Lakeville Clinic project was recently constructed at 18484 Kachina Court in
Lakeville, Minnesota. This report summarizes the results of the observations and construction
testing services we performed during construction of the building.
To protect you, American Engineering Testing, Inc. (AET), and the public, we authorize the use of
this report only by you and your project team for this specific project. Contact us if other uses are
intended.
Scope of Services
On March 28, 2019, we were authorized by Mr. Greg Harris of Park Nicollet Health Services to
perform observations and construction testing services for the project. The general scope of
services we were authorized to perform during construction of the Park Nicollet Lakeville Clinic
building included the following items:
•Observing the soils in the bottom of the mass excavation for the building additions.
•Performing compaction testing of structural fill and backfill soils placed for the project.
•Observing the reinforcing steel placed in formwork for the cast-in-place and concrete
structural elements of the building.
•Performing compressive strength testing of concrete test cylinders.
•Observing the masonry wall construction and vertical reinforcing steel.
•Performing compressive strength testing of masonry grout prisms and mortar cubes.
•Observing and testing the field welded and bolted connections for the structural steel frame
and metal decking.
•Observing firestop material installation.
•Presenting the results of our observations and testing in formal reports.
All services provided by AET were performed on a will-call basis, as requested by RJM
Construction site personnel.
AET Project No. 20-21161 - Page 2 of 6
PROJECT INFORMATION
The construction recently completed is a new Park Nicollet Lakeville Clinic. We further
understand the new clinic:
•Has two above-grade levels.
•Has a first-floor elevation of 1072.50 feet.
•Has approximate overall dimensions of about 108 feet by 151 feet.
•Is supported by spread footings designed using an allowable soil bearing pressure of 4,000
pounds per square foot (psf).
•Has bottom-of-footing elevations ranging from 1062 feet to 1067.5 feet for the perimeter and
interior footings.
•Has reinforced masonry block walls; a structural steel frame; and a metal deck roof supported
by steel joists.
•Is able to tolerate normal amounts of settlement for this type of structure (up to 1-inch total
and ½-inch differential).
•Has light-duty pavements on the north, east, and west sides of the structure consisting of 3½
inches of bituminous over 8 inches of Class 5 aggregate base.
•Hast heavy-duty pavements on the north, east, and west sides of the structure consisting of 4
inches of bituminous over 10 inches of Class 5 aggregate base.
•Is designed and constructed according to applicable building code requirements.
Deviations from the above design information could necessitate altering our conclusions and
recommendations. Contact us if the information stated is different from the actual project
design.
EXCAVATION OBSERVATIONS
We observed the soils exposed in the bottoms of the mass excavation and the individual footing
excavations for the building between the dates of May 15 and September 3, 2019. Our services
were performed on a will-call basis, coordinated with site personnel from RJM Construction,
which allowed us to observe all of the excavations. In conjunction with observing the
excavations, we also performed shallow hand auger borings and hand cone penetrometer probes
in the bottoms of the excavations to evaluate the strength of the soils.
AET Project No. 20-21161 - Page 3 of 6
The soils exposed in the bottoms of the excavations for the building were judged to be naturally
deposited clayey sand soils. Our hand cone penetrometer readings indicate the naturally
deposited soils were capable of supporting soil bearing stresses of up to 4,000 psf.
There were sections of the building excavation that showed unsuitable, water bearing fill soils
during preparation for the slab-on-grade building pad. These sections reached depths up to 5 feet
below slab-on-grade bottom elevations. After removal of these unsuitable materials, flowable fill
and imported sand soils were placed in the affected areas and drainage systems were installed to
mitigate future drainage issues.
Based on our observations, hand auger borings, hand cone penetrometer probes, and our review
of the available information, the soils exposed at bottoms of the footing excavations were judged
to be suitable for supporting anticipated building loads.
COMPACTION TESTING OF FILL SOILS
Between the dates of June 5 and September 23, 2019, we conducted 37 density tests in fill placed
at the site. The density tests were conducted on a will-call basis. The results of these field density
tests were compared to the laboratory Standard Proctor maximum dry densities (ASTM: D698)
to arrive at a percent compaction level for each test. The results of the soil compaction tests we
performed indicate the minimum specified compaction levels were ultimately met or exceeded at
the locations and elevations tested. The results of our compaction tests were presented previously
in our Field Density Test Reports.
REINFORCING STEEL OBSERVATIONS
Prior to placement of concrete, AET personnel observed the mild reinforcing steel in the
building’s structural elements. During our observations, we observed and reviewed the
following items for conformance to the most current drawings available at the project site:
•Reviewing the most current approved structural drawings present at the jobsite.
•Measuring the sizes of the formwork and verifying conformance with structural drawings.
•Documenting the bar sizes, the number of bars, the spacing of bars, and verifying general
conformance with the approved drawings.
AET Project No. 20-21161 - Page 4 of 6
•Documenting that adequate bar clearance was provided from forms, subgrade soils, or future
concrete surfaces using chairs or other approved devices.
•Documenting the presence and spacing of bolts installed in concrete.
•Documenting general conformance with specified cover requirements.
•Observing the general appearance of the reinforcing steel bars and formwork.
Based on the results of our observations, it is our opinion that the reinforcing steel placed in the
observed structural elements were in substantial compliance with the current drawings and
specifications present at the site. Any corrections required after observation by AET were
observed to have been completed prior to concrete placement.
AET does not perform surveying services; therefore, our observations of the reinforcing steel
based on the positioning of the formwork by the contractor or subcontractor. We are not
responsible for the exact locations of the formwork or the embedded items installed in the
concrete.
CONCRETE TESTING
On-Site Testing of Plastic Concrete
Personnel from our firm performed testing of the plastic concrete placed for the project during
the period from May 17 to November 18, 2019. The sampling and testing was conducted in
accordance with the procedures described by ASTM, and included the following items:
•Reviewing the delivery tickets to confirm that the correct mix was delivered.
•Measuring the slump of the concrete mixture.
•Measuring the percentage of entrained and entrapped air within the concrete mixture.
•Measuring the temperature of the concrete mixture.
•Casting 4 inch by 8 inch concrete test cylinders for compressive strength testing.
The results of our field testing of concrete were presented in our Concrete Test Reports. These
reports were previously submitted to you. The test results indicated that the concrete delivered to
the site was generally within the requirements of the project specifications for slump, air content,
and temperature.
AET Project No. 20-21161 - Page 5 of 6
Compressive Strength Testing of Concrete
During concrete placements at the project site, AET technicians cast 4 inch by 8 inch concrete
test cylinders. The test cylinders were temporarily stored at the jobsite and then returned to our
laboratory for moist curing before compressive strength testing. The compressive strength
testing was conducted in accordance with ASTM: C39.
Between the dates of May 17 and November 18, 2019 a total of 14 sets of concrete test cylinders
were cast and tested for concrete placed for the project. In summary, our test results indicate that
the concrete placed for the project met or exceeded the 28-day specified compressive strength.
The results of the concrete compressive strength testing were previously reported.
MASONRY OBSERVATIONS AND TESTING
During construction of the masonry walls on June 4, 2019, AET personnel visited the site to
perform observations. These services were performed on a will-call basis. Our services included
the following:
•Observing that the proper units were used, and that the units were clean and dry.
•Observing that the spaces to receive the grout were clean before grout corefill was placed, or
that clean-outs were provided at the base of the wall for high-lift grout placement.
•Observing the horizontal and vertical reinforcement, including placement and alignment of
bars and dowels, measuring the bar sizes and lengths of bar lap splices, and observing the
clearance between bars and clearance from masonry units.
•Observing the general construction practices required by the project specifications.
Based on our observations, it appeared that the masonry walls which we observed during our
visit to the site were being constructed in general conformance with the approved project plans
and specifications.
We also performed compressive strength testing on a set of grout corefill "prisms" cast during
the masonry wall construction observed by AET personnel. The results of these tests were
presented in our Reports of Compressive Strength of Grout Specimens. A copy of this report
was previously submitted under a separate cover. The test results exceeded the 28-day design
compressive strength.
AET Project No. 20-21161 - Page 6 of 6
OBSERVATIONS OF WELDED AND BOLTED CONNECTIONS
Between the dates of July 17 and August 9, 2019, NDT technicians from AET observed the field
welded and bolted connections of the structural steel framing, and metal roof decking. Visual
weld observations were performed in accordance with the requirements of the AWS D1.1
Structural Welding Code, Section 6 (steel frame). Individual welds were visually observed for
quality, size and length.
Based on our observations and testing, it is our judgment that the welded and bolted connections
which our technicians observed satisfied the requirements of the referenced codes and project
specifications.
Copies of our NDT Field Reports were left with field personnel at the site.
STANDARD OF CARE
Our services for your project have been conducted to those standards considered normal for
services of this type at this time and location. Other than this, no warranty, either express or
implied, is intended.
SIGNATURES
This Report was Prepared by: This Report was Reviewed by:
American Engineering Testing, Inc. American Engineering Testing, Inc.
__________________________________ __________________________________ Brandon D. Newberger, PE Rob Flickinger Staff Engineer Senior Engineer
MN License No. 57242