Loading...
HomeMy WebLinkAboutItem 06.h• • • ☐ BID OPENING QUIGLEY-SIME / ARONSON / DODD TRAIL PARKING IMPROVEMENTS CITY OF LAKEVILLE PARKS & RECREATION Friday, February 21, 2020 – 2:00 p.m. (Addendum #1 – Revise Bituminous Mixtures 2/19/20) Contractor Bid Bond Add #1 Base Bid Total Base Bid & Alt 1 Total Base Bid & Alts 1-2 Total Base Bid & Alts 1-3 Total Prior Lake Black Top X X $457455.20 $474735.87 $516240.08 $548906.59 Midstate Land. & Ex. X NO $502112.76 $520349.29 $565019.22 $598777.34 Northwest X X $530270.70 $553691.20 $607279.20 $637252.20 S.M. Hentges & Sons X X $537539.71 $557602.16 $608744.96 $642520.36 McNamara Contracting X X $562645.50 $592464.50 $671832.50 $723062.50 Veit & Company X X $589284.60 $616077.75 $679974.40 $725040.40 ENGINEER’S ESTIMATE $556,529.38 $575,106.18 $631,103.33 $662,400.42 BID OPENING NOTE: Bid received from Midstate Landscaping & Excavating was not read publicly as they did not acknowledge Addendum 1. It is included here for comparison only and did not impact the recommended award to Prior Lake Black Top. NOTE: The Alternates have been listed with a priority ranking and the apparent low bidder will be identified as follows: 1. The apparent low bidder of the Base Bid plus Alternates 1-3 will be identified. 2. The apparent low bidder of the Base Bid plus Alternates 1-2 will be identified. 3. The apparent low bidder of the Base Bid plus Alternate 1 will be identified. 4. The apparent low bidder of the Base Bid will be identified. Selection of the apparent low bidder will be based on a pre-determined dollar amount, which will be disclosed prior to bid opening. The apparent low bidder of the highest priority Base Bid plus Alternate(s) with a bid lower than the pre-determined dollar value will be selected. If all bids including alternates are higher than the pre-determined dollar amount, the lowest Base Bid will be selected. n:\bms\srf-pw\sprusak\dms54173\CP 20-17_Bid Opening Summary_022120.docx