HomeMy WebLinkAboutLA177786 - 5637 Upper 179th St W Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION
PAGE 2
OFFICE USE ONLY
BUILDING PERMIT TYPE REQUIRED INSPECTIONS
SINGLE FAMILY DWELLING BUILDING
DUPLEX AS BUILT
TOWNHOUSE UNITS BUILDING FINAL
DETACHED TOWN HOUSE UNIT DECK FOOTING
CONDO FIREPLACE
ACESSORY BUILDING FOOTING
REROOF FOUNDATION
RESIDE FRAMING
PORCH FRAMING
GARAGES
INSULATION
RES ADDN/REPAIR/RMDL
DECK
PORCH
GARAGES LATH
LOWER LEVEL FINISH LOWER LEVEL FINAL
ADDITION OTHER
FOUNDATION ONLY PORCH FOOTING
MISCELLANEOUS POURED WALL
DEMO SEPTIC TANK REMOVAL
MOVED SITE
MECHANICAL
CITY BUILDING VALUATION: $AIR TEST
FINAL
BUILDING PERMIT FEES ROUGH-IN
$PERMIT FEE PLUMBING
$PLAN CHECK FINAL
$SURCHARGE ROUGH-IN
$METRO SAC METER SIZE
$CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE
$CITY SEWER HOOKUP UNIT SEWER/WATER
$LANDSCAPE ESCROW SEWER/WATER
$TREE ESCROW FINAL
$MISC ESCROW STREET DRAINTILE
$PLUMBING BUILDING INFORMATION
$MECHANICAL TYPE OF CONSTRUCTION
$SEWER WATER ZONING
$OTHER CODE EDITION
$TOTAL FIRE SUPPRESSION SYSTEM
OCCUPANCY GROUP
APPROVED BY:
BUILDING INSPECTOR: Date:
PLUMBING/MECHANICAL
INSPECTOR: Date:
COMMENTS:
Secure door closed until deck isconstructed with a separate permit.Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode03/03/2020dmathews
3UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel.
Verify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.6PFHCS-PFor PFHCS-PFor PFH
-Min. 15" clearance to anyobstruction from center ofW.C., 24" in front(typ).
Foundation will be pouredwalls and not block.
Continuous sheathed portalframe or portal frame withhold-downs required for ceilingheight and limited panel width.Portal frame with hold-downrequired for limited panelwidth and ceiling height.
5637 Upper 179th St. W., Lakeville
HVAC Load Calculations
for
Cedarline Construction LLC
Prepared By:
Jake Ryan
Silver Tree Plumbing & Heating
1335 Mendota Heights Rd
Mendota Heights, MN 55120
651-900-7053
Monday, February 10, 2020
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Silver Tree Plumbing & Heating 5637 Upper 179th St. W., Lakeville
Eagan, MN 55121 Page 2
Project Report
General Project Information
Project Title:5637 Upper 179th St. W., Lakeville
Designed By:Jake Ryan
Project Date:1/27/2020
Project Comment:
Client Name:Cedarline Construction LLC
Company Name:Silver Tree Plumbing & Heating
Company Representative:Jake Ryan
Company Address:1335 Mendota Heights Rd
Company City:Mendota Heights, MN 55120
Company Phone:651-900-7053
Company E-Mail Address:jaker@silvertreepandh.com
Design Data
Reference City:Minneapolis, Minnesota
Building Orientation:Front door faces South
Daily Temperature Range:Medium
Latitude:44 Degrees
Elevation:834 ft.
Altitude Factor:0.970
Outdoor Outdoor Outdoor Indoor Indoor Grains
Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference
Winter:-15 -15.33 n/a 30%70 31.52
Summer:88 73 50%50%75 35
Check Figures
Total Building Supply CFM:814 CFM Per Square ft.:0.296
Square ft. of Room Area:2,750 Square ft. Per Ton:1,357
Volume (ft³):22,000
Building Loads
Total Heating Required Including Ventilation Air:42,661 Btuh 42.661 MBH
Total Sensible Gain:18,072 Btuh 74 %
Total Latent Gain:6,250 Btuh 26 %
Total Cooling Required Including Ventilation Air:24,323 Btuh 2.03 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
F:\ ...\5637 Upper 179th St. W., Lakeville - Heat Calc.rh9 Monday, February 10, 2020, 9:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Silver Tree Plumbing & Heating 5637 Upper 179th St. W., Lakeville
Eagan, MN 55121 Page 3
Load Preview Report
Scope
Has
AED
Net
Ton
ft.²
/Ton Area
Sen
Gain
Lat
Gain
Net
Gain
Sen
Loss
Min
Htg
CFM
Min
Clg
CFM
Sys
Htg
CFM
Sys
Clg
CFM
Sys
Act
CFM
Duct
Size
Building 2.03 1,357 2,750 18,072 6,250 24,323 42,661 503 814 503 814 814
System 1 Main Floor No 2.03 1,357 2,750 18,072 6,250 24,323 42,661 503 814 503 814 814 10x15
Ventilation 687 3,480 4,167 5,035
Supply Duct Latent 140 140
Return Duct 9 24 33 58
Humidification 5,253
Zone 1 2,750 17,377 2,606 19,983 32,316 503 814 503 814 814 10x15
1-Basement 1,130 3,442 400 3,842 11,207 174 161 174 161 161 2--5
2-Main Level 1,130 10,462 2,006 12,468 13,178 205 490 205 490 490 4--7
3-Upper Level 490 3,473 200 3,673 7,931 123 163 123 163 163 2--5
F:\ ...\5637 Upper 179th St. W., Lakeville - Heat Calc.rh9 Monday, February 10, 2020, 9:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Silver Tree Plumbing & Heating 5637 Upper 179th St. W., Lakeville
Eagan, MN 55121 Page 4
Duct Size Preview
Room or
Duct Name Source Minimum
Velocity
Maximum
Velocity
Rough.
Factor
Design
L/100
SP
Loss
Duct
Velocity
Duct
Length Htg
Flow
Clg
Flow
Act.
Flow
Duct
Size
System 1
Supply Runouts
Zone 1
1-Basement Built-In 450 750 0.01 0.1 591.3 174 161 161 2--5
2-Main Level Built-In 450 750 0.01 0.1 458.5 205 490 490 4--7
3-Upper Level Built-In 450 750 0.01 0.1 596.7 123 163 163 2--5
Other Ducts in System 1
Supply Main Trunk Built-In 650 900 0.003 0.1 781.5 503 814 814 10x15
SummarySummarySummarySummarySummarySummarySummarySummary
System 1
Heating Flow:503
Cooling Flow:814
F:\ ...\5637 Upper 179th St. W., Lakeville - Heat Calc.rh9 Monday, February 10, 2020, 9:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Silver Tree Plumbing & Heating 5637 Upper 179th St. W., Lakeville
Eagan, MN 55121 Page 5
Total Building Summary Loads
Component
Description
Area
Quan
Sen
Loss
Lat
Gain
Sen
Gain
Total
Gain
LOWEE BUILDER GRADE: Glazing-LOWEE BUILDER
GRADE, ground reflectance = 0.23, indoor insect
screen with 100% coverage, U-value 0.32, SHGC
0.32
271.6 7,386 0 4,031 4,031
11J: Door-Metal - Fiberglass Core, U-value 0.6 37.8 1,927 0 544 544
12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud
cavity, no board insulation, siding finish, wood studs,
U-value 0.065
2338.6 12,921 0 2,023 2,023
15B0-10sf-4: Wall-Basement, , R-10 board insulation to
floor, no interior finish, 4' floor depth, U-value 0.054
432 1,982 0 0 0
RJ R-20: Wall-Frame, Custom, RJ R-20 RIM JOIST R20
SPRAY FOAM, U-value 0.05
325.9 1,386 0 282 282
R49 Attic: Roof/Ceiling-Under Attic with Insulation on
Attic Floor (also use for Knee Walls and Partition
Ceilings), Custom, R49 Attic, U-value 0.02
1620 2,754 0 2,203 2,203
21A-32: Floor-Basement, Concrete slab, any thickness, 2
or more feet below grade, no insulation below floor,
any floor cover, shortest side of floor slab is 32' wide,
U-value 0.02
1130 1,921 0 0 0
20P-30: Floor-Over open crawl space or garage, Passive,
R-30 blanket insulation, any cover, U-value 0.035
490 1,458 0 137 137
Subtotals for structure:31,735 0 9,220 9,220
People:9 1,800 2,070 3,870
Equipment:806 3,334 4,140
Lighting:750 2,558 2,558
Ductwork:638 164 138 302
Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0
Ventilation: Winter CFM: 150, Summer CFM: 150 5,035 3,480 687 4,167
Humidification (Winter) 14.32 gal/day :5,253 0 0 0
AED Excursion:0 0 66 66
Total Building Load Totals:42,661 6,250 18,072 24,323
Check Figures
Total Building Supply CFM:814 CFM Per Square ft.:0.296
Square ft. of Room Area:2,750 Square ft. Per Ton:1,357
Volume (ft³):22,000
Building Loads
Total Heating Required Including Ventilation Air:42,661 Btuh 42.661 MBH
Total Sensible Gain:18,072 Btuh 74 %
Total Latent Gain:6,250 Btuh 26 %
Total Cooling Required Including Ventilation Air:24,323 Btuh 2.03 Tons (Based On Sensible + Latent)
Notes
Rhvac is an ACCA approved Manual J, D and S computer program.
Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D.
All computed results are estimates as building use and weather may vary.
Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at
your design conditions.
F:\ ...\5637 Upper 179th St. W., Lakeville - Heat Calc.rh9 Monday, February 10, 2020, 9:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Silver Tree Plumbing & Heating 5637 Upper 179th St. W., Lakeville
Eagan, MN 55121 Page 6
Building Rotation Report
All rotation degree values in this report are clockwise with respect to the project's original orientation.
Building orientation as entered (zero degrees rotation): Front door faces South
Individual Rooms
Rm.
No.
Room
Name
0°
Rot.
CFM
45°
Rot.
CFM
90°
Rot.
CFM
135°
Rot.
CFM
180°
Rot.
CFM
225°
Rot.
CFM
270°
Rot.
CFM
315°
Rot.
CFM
High
Duct
Size
System 1:
Zone 1:
1 Basement 161 218 255 235 191 244 *259 218 3--5
2 Main Level 490 551 580 560 513 576 *582 546 5--6
3 Upper Level 163 181 185 169 144 177 *191 183 2--6
* Indicates highest CFM of all rotations.
Whole Building
Rotation
Degrees
Front door
Faces
Supply
CFM
Sensible
Gain
Latent
Gain
Net
Tons
0°South 814 18,072 6,250 2.03
45°Southwest 950 20,982 6,250 2.27
90°West 1,020 22,466 6,250 2.39
135°Northwest 963 21,251 6,250 2.29
180°North 848 18,790 6,250 2.09
225°Northeast 997 21,977 6,250 2.35
270°East *1,031 *22,705 6,250 *2.41
315°Southeast 947 20,914 *6,251 2.26
* Indicates highest value of all rotations.
2.0
2.1
2.2
2.3
2.4
South Southwest West Northwest North Northeast East SoutheastCooling TonsDirection Front door Faces
Building Rotation Tonnage
Building Net Tonnage
F:\ ...\5637 Upper 179th St. W., Lakeville - Heat Calc.rh9 Monday, February 10, 2020, 9:45 AM
Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc.
Silver Tree Plumbing & Heating 5637 Upper 179th St. W., Lakeville
Eagan, MN 55121 Page 7
Building Rotation Report (cont'd)
22,000
23,000
24,000
25,000
26,000
27,000
28,000
29,000
30,000
31,000
8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pmBuilding Net Gain, BtuhTime of Day
Building Rotation Hourly Net Gain
Front door faces South
Front door faces Southwest
Front door faces West
Front door faces Northwest
Front door faces North
Front door faces Northeast
Front door faces East
Front door faces Southeast
F:\ ...\5637 Upper 179th St. W., Lakeville - Heat Calc.rh9 Monday, February 10, 2020, 9:45 AM
Passive (No Fan)
Active (With fan and monitoring
device )
Location (or future location) of Fan:
Other Please Describe Here
Not applicable, all ducts located in conditioned space
Not required per mech. code
Passive
Powered
Interlocked with exhaust device.
Describe:
Input in
BTUS:
Capacity in
Gallons:
Other, describe:
AFUE or
HSPF%
Cfm's
" round duct OR
" metal duct
Not required per mech. code
Passive
Low: Other, describe:
Low:
Location of fan(s), describe: Cfm's
" round duct OR
" metal duct
Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution
panel.
New Construction Energy Code Compliance Certificate
Name of Residential Contractor MN License Number
City Mailing Address of the Dwelling or Dwelling Unit
Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms:
Energy Recover Ventilator (ERV) Capacity in cfms:
Combustion Air Select a Type
Location of duct or system:
Rim Joist (2nd Floor+)
Building envelope air tightness:
Below Entire Slab
Fuel Type
Solar Heat Gain Coefficient (SHGC):
Windows & Doors
Ceiling, vaulted
Bay Windows or cantilevered areas
Floors over unconditioned area
THERMAL ENVELOPE
Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade
RADON CONTROL SYSTEM
Total R-Value of all Types of InsulationType: Check All That Apply
Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas
Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall
Output
in Tons:
Appliances Cooling System
Location of duct or system:
Heating or Cooling Ducts Outside Conditioned Spaces
Make-up Air Select a Type
Domestic Water
Heater
Model
Heating System
Rim Joist (1st Floor)
Average U-Factor (excludes skylights and one door ) U:
Duct system air tightness:
Rating or Size
Efficiency
Heating Gain Cooling Load
Select Type
Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air
source heat pump with gas back-up furnace):
Residential Load
Calculation
SEER
/EER
Capacity continuous ventilation rate in cfms:
Heating Loss
Manufacturer
Total ventilation (intermittent + continuous) rate in cfms:
Balanced Ventilation capacity in cfms:
High:
High:
MECHANICAL VENTILATION SYSTEM
Date Cert. Posted
R-value
MECHANICAL SYSTEMS
Builders Associaton of Minnesota version 101014
02/25/2020 X
KP