Loading...
HomeMy WebLinkAbout19545 Hibbing Way SurveyZoning = RS-3 The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Draintile connection required. *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________03/02/2020 lritchie