HomeMy WebLinkAbout17382 Eastwood Ave SurveyZoning = RM-1
*Draintile connection required.
ENGINEERING REVIEWED
Date: 02/25/2020___lvlasaty
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.