Loading...
HomeMy WebLinkAbout19929 Harrisburg Way SurveyZoning = RS-3 *Maintain 6" between bottom of siding and sod.*No structures in easements. The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________03/05/2020 aoxborough