Loading...
HomeMy WebLinkAbout18025 Harlow Path Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.062.dwgSave Date:02/11/20House Address: Certificate of Survey for: M/I HOMES OF MINNEAPOLIS, LLC 18025 Harlow Path, Lakeville, MN House Model: Dearborn (C) 3890 Pheasant Ridge Drive NE, Suite 100, Blaine, MN 55449 Phone: 763-489-7900 Fax: 763-489-7959 ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYING Revisions: *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________03/05/2020 aoxborough The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION Planning DepartmentApprovedDate:__________________03/16/2020 mwaite