HomeMy WebLinkAbout18025 Harlow Path Surveyf:\jobs\7761 - 7780\7769 - avonlea 4th addition\cad c3d\survey\7769.062.dwgSave Date:02/11/20House Address:
Certificate of Survey for:
M/I HOMES OF MINNEAPOLIS, LLC
18025 Harlow Path, Lakeville, MN
House Model:
Dearborn (C)
3890 Pheasant Ridge Drive NE,
Suite 100, Blaine, MN 55449
Phone: 763-489-7900 Fax: 763-489-7959
ENVIRONMENTAL ◦ ENGINEERING ◦ SURVEYING
Revisions:
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________03/05/2020 aoxborough
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Draintile connection required.
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
Planning DepartmentApprovedDate:__________________03/16/2020 mwaite