HomeMy WebLinkAbout8021 183rd Street West SurveyThe curb box, drain tile cleanout and catch basin
(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released.
All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date:__________________03/10/2020 lritchie
Planning DepartmentApprovedDate:__________________03/25/2020 dmorey