Loading...
HomeMy WebLinkAbout8021 183rd Street West SurveyThe curb box, drain tile cleanout and catch basin (if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________03/10/2020 lritchie Planning DepartmentApprovedDate:__________________03/25/2020 dmorey