Loading...
HomeMy WebLinkAbout8818 193rd St Surveyc Pioneer Engineering Revisions: 1.) 02-25-20 Stake house Certificate of Survey for: 2422 Enterprise DriveMendota Heights, MN 55120 Ph. : (651) 681-1914 www.pioneereng.comFax: (651) 681-9488 Project # :Folder #:Drawn by: CIVIL ENGINEERS LAND PLANNERS LAND SURVEYORS LANDSCAPE ARCHITECTS Lennar Corporation 16305 36th Ave N Ste #600 Plymouth, MN 55446-4270 Phone: (952) 249-3000 / Fax: (952) 404-1909 Zoning = RS-3FY - 30'SY - 10' Interior, 20' CornerRY - 30'SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________03/10/2020 lritchie