Loading...
HomeMy WebLinkAbout8336 197th Street West-SURVEYZoning = RS-3 EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. *Draintile connection required. ENGINEERING REVIEWED Date: 03/23/2020___aoxborough The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.