Loading...
HomeMy WebLinkAbout7792 205th Street West SurveyJames R. Hill, Inc. PHONE: 952.890.6044 www.jrhinc.com PLANNERS / ENGINEERS / SURVEYORSDRAWN BYDATEREVISIONSCAD FILEPRO-ECT NO.SHEET 1 OF 1A. 3/16/20: Client2999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306 CERTIFICATE OF SURVEY FOR SHP3/11/2020400202.dwg400202Lot 1, Block 2, CEDAR CROSSINGS, Dakota County, MinnesotaDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes found scribed "x"Denotes set hubDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevation1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: July 13, 20187.Plan No. 3035-C 'FINNEGAN'NOTESLot= 11,626 sq. ft.House/Garage= 2,461 sq. ft.Porch= 122 sq. ft.Driveway= 693 sq. ft.Sidewalk= 70 sq. ft.Patio= 18 sq. ft.Total Impervious= 3,364 sq. ft. or 28.94% of lotHARD COVER CALCULATIONSProposedGarage Floor @ Front= 1006.7Garage Top of Foundation= 1007.1House Top of Foundation= 1007.1Lowest Floor= 1003.9Lot 1, Block 2, CEDAR CROSSINGS, Dakota County, MinnesotaPROPERTY DESCRIPTION7792 205th Street West, Lakeville, MinnesotaPROPERTY ADDRESSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 11th day of March, 2020Marcus F. Hampton, MN L.S. No. 47481SURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lot 1, Block 2 = 1007.78BENCHMARKZoning = RST-2FY - 20' House, 25' GarageSY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30'RY Buffer - 50'The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate:__________________03/26/2020lritchie