HomeMy WebLinkAbout20024 Hamlet Lane SurveyZoning = RS-4The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between siding & sod*No structures in easementsENGINEERING REVIEWEDDate:__________________03/27/2020lritchie