Loading...
HomeMy WebLinkAbout19727 Hening Avenue-SURVEYZoning = RS-3 The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. *Draintile connection required. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________03/23/2020 lritchie