Loading...
HomeMy WebLinkAboutLA178524 Helical ReportInstaller's Name:Craig E., Tyler, Scott, and Craig W Installation Checklist Franchisee Location:Minnesota Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Installation Date:4/9/20 Name of Customer or Contractor:Lakeshore Management Description of customer project:Deck Porch Project Address:339 Brutus Dr., Lakeville Pile Number Required Compression Capacity Required Torque Pile Used Helix Used Total Pile Length (if not 7')Cut-off Elevation (if not 8" +-2) Inclination of Pile (if not 90 Degrees +-2)Torque Achieved Achieved Compression Capacity Achieved Tension Capacity Pile 1:8325 1850 2 7/8”17”1850 8325 4162 Pile 2:8325 1850 2 7/8”17”5’2300 10350 5175 Pile 3:8325 1850 2 7/8”17”1900 8550 4275 Pile 4:8325 1850 2 7/8”17”4’6”3000 13500 6750 Pile 5:8325 1850 2 7/8”17”1850 8325 4162 Pile 6:8325 1850 2 7/8”17”13’1850 8325 4162 Pile 7:8325 1850 2 7/8”17”1900 8550 4275 Pile 8:8325 1850 2 7/8”17”1875 8437 4218 Pile 9:8325 1850 2 7/8”17”1850 8325 4162 Pile 10:8325 1850 2 7/8”17”2000 9000 4500 Pile 11:8325 1850 2 7/8”17”1900 8550 4275 Pile 12:8325 1850 2 7/8”17”5’1850 8325 4162 Pile 13:8325 1850 2 7/8”17”14’3000 13500 6750 Pile 14:8325 1850 2 7/8”17”13’1900 8550 4275 Draw your project here: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 1 of 2 Pile 15:8325 1850 2 7/8”17”4’6”1850 8325 4162 Pile 16:8325 1850 2 7/8”17”10’200 - failure to progress Pile 17:8325 1850 2 7/8”17”1900 8550 4275 Pile 18:8325 1850 2 7/8”17”2000 9000 4500 8 7 6 5 4 3 2 1 9 12 10 14 13 11 16 15 18 19 17 STREET 1 Pile 19:8325 1850 2 7/8”17”5’6”1900 8550 4275 Pile 20: Pile 21: Pile 22: Pile 23: Pile 24: Pile 25: Pile 26: Pile 27: Pile 28: The presence of this document in SharePoint certifies that the material contained within has been approved for release and supersedes all previous versions.Date Modified: October 20th 2016Document Name: Installation Checklist US Internal Document - Not for General Distribution. Copyright © 2013 GoliathTech Incorporated. All Rights Reserved.Page 2 of 2 2