Loading...
HomeMy WebLinkAboutLA179111 5649 Upper 179th St Permit PackRESIDENTIAL BUILDING PERMIT APPLICATION PAGE 2 OFFICE USE ONLY BUILDING PERMIT TYPE REQUIRED INSPECTIONS SINGLE FAMILY DWELLING BUILDING DUPLEX AS BUILT TOWNHOUSE UNITS BUILDING FINAL DETACHED TOWN HOUSE UNIT DECK FOOTING CONDO FIREPLACE ACESSORY BUILDING FOOTING REROOF FOUNDATION RESIDE FRAMING PORCH FRAMING GARAGES INSULATION RES ADDN/REPAIR/RMDL DECK PORCH GARAGES LATH LOWER LEVEL FINISH LOWER LEVEL FINAL ADDITION OTHER FOUNDATION ONLY PORCH FOOTING MISCELLANEOUS POURED WALL DEMO SEPTIC TANK REMOVAL MOVED SITE MECHANICAL CITY BUILDING VALUATION: $AIR TEST FINAL BUILDING PERMIT FEES ROUGH-IN $PERMIT FEE PLUMBING $PLAN CHECK FINAL $SURCHARGE ROUGH-IN $METRO SAC METER SIZE $CITY WATER HOOKUP UNIT PRESSURE REDUCING VALVE $CITY SEWER HOOKUP UNIT SEWER/WATER $LANDSCAPE ESCROW SEWER/WATER $TREE ESCROW FINAL $MISC ESCROW STREET DRAINTILE $PLUMBING BUILDING INFORMATION $MECHANICAL TYPE OF CONSTRUCTION $SEWER WATER ZONING $OTHER CODE EDITION $TOTAL FIRE SUPPRESSION SYSTEM OCCUPANCY GROUP APPROVED BY: BUILDING INSPECTOR: Date: PLUMBING/MECHANICAL INSPECTOR: Date: COMMENTS: 20195 Holyoke Avenue, Lakeville, MN 55044 952-985-4400  952-985-4499 fax www.lakevillemn.gov Sewer & Water Tie Card Address:________________________________________ Contractor:______________________________________ Permit Number:__________________________________ Final Date:________________ Street Drain-Tile:______ Size of Water Service: 1” Comments: AIRTEST SANITARY OVER 20’/2 FITTINGS THIS CARD MUST BE COMPLETED AND ON-SITE AT TIME OF SEWER & WATER INSPECTION 04/23/2020 X KP Model: Date:4/27/2020 Job Address:5649 Upper 179th St Description Units Rate Sub-Total Basement: Unfinished 1060 sf 16.50$ 17,490.00$ Finished sf 15.00$ -$ Family/Rec Room ea Bedroom/Office ea Bathroom ea Dwelling: Main Floor 1060 sf 100.26$ 106,275.60$ Second Floor 1190 sf 100.26$ 119,309.40$ Garage: Wood Frame 730 sf 39.72$ 28,995.60$ Masonry sf -$ Porches: Screen/Gazebos/Open sf 30.00$ -$ 3 Season sf 40.00$ -$ 4 Season sf 40.00$ -$ Decks sf 15.00$ -$ Miscellaneous Fireplace (Masonry)ea 3,000.00$ -$ l Fireplace (Zero Clearance)1 ea 1,500.00$ 1,500.00$ Residential Valuation:273,570.60$ Rounded Valuation 274,000$ Mastered Reduction Permit (from Rate Sheet)2,100.75$ 2,100.75$ Plan Review 1,365.49$ 525.19$ Surcharge 137.00$ 137.00$ Sub-Total 3,603.24$ 2,762.94$ Connection Fees SAC Unit 2,485.00$ 2,485.00$ Water Unit 4,100.00$ 4,100.00$ Sewer Unit 825.00$ 825.00$ Sub-Total 7,410.00$ 7,410.00$ Site Fees Landscape Escrow 1 ea 1,000.00$ 1,000.00$ 1,000.00$ Misc Escrow 1 ea 1,000.00$ 1,000.00$ 1,000.00$ Tree Escrow ea 1,000.00$ -$ -$ Sub-Total 2,000.00$ 2,000.00$ Inclusive Permits Plumbing 1 ea 90.00$ 90.00$ 90.00$ Sewer Water 1 ea 90.00$ 90.00$ 90.00$ Mechanical 1 ea 90.00$ 90.00$ 90.00$ Sub-Total 270.00$ 270.00$ Permit Fee Total 13,283.24$ 12,442.94$ Residential Building Permit Fees Worksheet(2015 Data) PERMIT FEES Concept Approval ONLYSubject to Field InspectionInspectorDate2015MN BldgCode04/27/2020shutchins 44UFER Ground-Provide 20' Rebar in footing and stubup near electrical service panel. (2)11-7/8 LVLPFHPFHMin. 11-1/4" HEADER REQUIREDFOR PF(2)2x1022x30 ATTIC ACCESSVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.4444444444BWP above(3)9-1/2 LVL TemperedTemperedVerify loads with girdertruss specs, may requireremoval of top plates atbearing due to crushing.444444433 Passive (No Fan) Active (With fan and monitoring device ) Location (or future location) of Fan: Other Please Describe Here Not applicable, all ducts located in conditioned space Not required per mech. code Passive Powered Interlocked with exhaust device. Describe: Input in BTUS: Capacity in Gallons: Other, describe: AFUE or HSPF% Cfm's " round duct OR " metal duct Not required per mech. code Passive Low: Other, describe: Low: Location of fan(s), describe: Cfm's " round duct OR " metal duct Per R401.3 Certificate. A building certificate shall be posted on or in the electrical distribution panel. New Construction Energy Code Compliance Certificate Name of Residential Contractor MN License Number City Mailing Address of the Dwelling or Dwelling Unit Rigid, Extruded PolystyreneHeat Recover Ventilator (HRV) Capacity in cfms: Energy Recover Ventilator (ERV) Capacity in cfms: Combustion Air Select a Type Location of duct or system: Rim Joist (2nd Floor+) Building envelope air tightness: Below Entire Slab Fuel Type Solar Heat Gain Coefficient (SHGC): Windows & Doors Ceiling, vaulted Bay Windows or cantilevered areas Floors over unconditioned area THERMAL ENVELOPE Foam Open Cell Wall Rigid, Isocynurate Perimeter of Slab on Grade RADON CONTROL SYSTEM Total R-Value of all Types of InsulationType: Check All That Apply Mineral FiberboardInsulation Location Foam, Closed Cell Describe other insulated areas Ceiling, flat Non or Not ApplicableFiberglass, BlownFiberglass, Batts Foundation Wall Output in Tons: Appliances Cooling System Location of duct or system: Heating or Cooling Ducts Outside Conditioned Spaces Make-up Air Select a Type Domestic Water Heater Model Heating System Rim Joist (1st Floor) Average U-Factor (excludes skylights and one door ) U: Duct system air tightness: Rating or Size Efficiency Heating Gain Cooling Load Select Type Describe any additional or combined heating or cooling systems if installed: (e.g. two furnaces or air source heat pump with gas back-up furnace): Residential Load Calculation SEER /EER Capacity continuous ventilation rate in cfms: Heating Loss Manufacturer Total ventilation (intermittent + continuous) rate in cfms: Balanced Ventilation capacity in cfms: High: High: MECHANICAL VENTILATION SYSTEM Date Cert. Posted R-value MECHANICAL SYSTEMS Builders Associaton of Minnesota version 101014 5649 Upper 179th St. W., Lakeville HVAC Load Calculations for Cedarline Construction LLC Prepared By: Jake Ryan Silver Tree Plumbing & Heating 1335 Mendota Heights Rd Mendota Heights, MN 55120 651-900-7053 Friday, April 10, 2020 Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 5649 Upper 179th St. W., Lakeville Eagan, MN 55121 Page 2 Project Report General Project Information Project Title:5649 Upper 179th St. W., Lakeville Designed By:Jake Ryan Project Date:4/10/2020 Project Comment: Client Name:Cedarline Construction LLC Company Name:Silver Tree Plumbing & Heating Company Representative:Jake Ryan Company Address:1335 Mendota Heights Rd Company City:Mendota Heights, MN 55120 Company Phone:651-900-7053 Company E-Mail Address:jaker@silvertreepandh.com Design Data Reference City:Minneapolis, Minnesota Building Orientation:Front door faces South Daily Temperature Range:Medium Latitude:44 Degrees Elevation:834 ft. Altitude Factor:0.970 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter:-15 -15.33 n/a 30%72 33.90 Summer:88 73 50%50%75 35 Check Figures Total Building Supply CFM:885 CFM Per Square ft.:0.267 Square ft. of Room Area:3,310 Square ft. Per Ton:1,560 Volume (ft³):28,600 Building Loads Total Heating Required Including Ventilation Air:52,238 Btuh 52.238 MBH Total Sensible Gain:19,655 Btuh 77 % Total Latent Gain:5,804 Btuh 23 % Total Cooling Required Including Ventilation Air:25,459 Btuh 2.12 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. D:\5649 Upper 179th St. W., Lakeville - Heat Calc.rh9 Friday, April 10, 2020, 1:02 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 5649 Upper 179th St. W., Lakeville Eagan, MN 55121 Page 3 Load Preview Report Scope Has AED Net Ton ft.² /Ton Area Sen Gain Lat Gain Net Gain Sen Loss Min Htg CFM Min Clg CFM Sys Htg CFM Sys Clg CFM Sys Act CFM Duct Size Building 2.12 1,560 3,310 19,655 5,804 25,459 52,238 622 885 622 885 885 System 1 Main Floor Yes 2.12 1,560 3,310 19,655 5,804 25,459 52,238 622 885 622 885 885 11x15 Ventilation 769 3,898 4,667 5,772 Supply Duct Latent 16 16 Return Duct 2 7 9 16 Humidification 5,781 Zone 1 3,310 18,884 1,883 20,767 40,669 622 885 622 885 885 11x15 1-Main floor 1,060 9,392 1,883 11,275 13,672 209 440 209 440 440 4--6 2-Basement 1,060 2,564 0 2,564 12,376 189 120 189 120 120 1--6 3-Second Floor 1,190 6,928 0 6,928 14,621 224 325 224 325 325 3--6 D:\5649 Upper 179th St. W., Lakeville - Heat Calc.rh9 Friday, April 10, 2020, 1:02 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 5649 Upper 179th St. W., Lakeville Eagan, MN 55121 Page 4 Duct Size Preview Room or Duct Name Source Minimum Velocity Maximum Velocity Rough. Factor Design L/100 SP Loss Duct Velocity Duct Length Htg Flow Clg Flow Act. Flow Duct Size System 1 Supply Runouts Zone 1 1-Main floor Built-In 450 750 0.01 0.1 560.2 209 440 440 4--6 2-Basement Built-In 450 750 0.01 0.1 611.7 189 120 120 1--6 3-Second Floor Built-In 450 750 0.01 0.1 551 224 325 325 3--6 Other Ducts in System 1 Supply Main Trunk Built-In 650 900 0.003 0.1 772.1 622 885 885 11x15 SummarySummarySummarySummarySummarySummarySummarySummary System 1 Heating Flow:622 Cooling Flow:885 D:\5649 Upper 179th St. W., Lakeville - Heat Calc.rh9 Friday, April 10, 2020, 1:02 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 5649 Upper 179th St. W., Lakeville Eagan, MN 55121 Page 5 Total Building Summary Loads Component Description Area Quan Sen Loss Lat Gain Sen Gain Total Gain LOWEE BUILDER GRADE: Glazing-LOWEE BUILDER GRADE, ground reflectance = 0.23, indoor insect screen with 100% coverage, U-value 0.32, SHGC 0.32 488.3 13,603 0 6,685 6,685 11J: Door-Metal - Fiberglass Core, U-value 0.6 37.8 1,972 0 544 544 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud cavity, no board insulation, siding finish, wood studs, U-value 0.065 2605.9 14,736 0 2,252 2,252 15B0-10sf-4: Wall-Basement, , R-10 board insulation to floor, no interior finish, 4' floor depth, U-value 0.054 80 376 0 0 0 15B0-10sf-8: Wall-Basement, , R-10 board insulation to floor, no interior finish, 8' floor depth, U-value 0.05 773 3,559 0 54 54 RJ R-20: Wall-Frame, Custom, RJ R-20 RIM JOIST R20 SPRAY FOAM, U-value 0.05 158 688 0 138 138 RJ R-20 RIM JOIST: Wall-Frame, Custom, RJ R-20 RIM JOIST R-20 SPRAY FOAM, U-value 0.05 169.2 736 0 148 148 R49 Attic: Roof/Ceiling-Under Attic with Insulation on Attic Floor (also use for Knee Walls and Partition Ceilings), Custom, R-49 Blown insulation in attic, U- value 0.02 1318 2,294 0 1,265 1,265 21A-32: Floor-Basement, Concrete slab, any thickness, 2 or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 32' wide, U-value 0.02 1060 1,844 0 0 0 20P-30: Floor-Over open crawl space or garage, Passive, R-30 blanket insulation, any cover, U-value 0.035 258 786 0 72 72 Subtotals for structure:40,594 0 11,158 11,158 People:6 1,200 1,380 2,580 Equipment:683 3,430 4,113 Lighting:850 2,899 2,899 Ductwork:91 23 19 42 Infiltration: Winter CFM: 0, Summer CFM: 0 0 0 0 0 Ventilation: Winter CFM: 168, Summer CFM: 168 5,772 3,898 769 4,667 Humidification (Winter) 15.76 gal/day :5,781 0 0 0 Total Building Load Totals:52,238 5,804 19,655 25,459 Check Figures Total Building Supply CFM:885 CFM Per Square ft.:0.267 Square ft. of Room Area:3,310 Square ft. Per Ton:1,560 Volume (ft³):28,600 Building Loads Total Heating Required Including Ventilation Air:52,238 Btuh 52.238 MBH Total Sensible Gain:19,655 Btuh 77 % Total Latent Gain:5,804 Btuh 23 % Total Cooling Required Including Ventilation Air:25,459 Btuh 2.12 Tons (Based On Sensible + Latent) Notes Rhvac is an ACCA approved Manual J, D and S computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. D:\5649 Upper 179th St. W., Lakeville - Heat Calc.rh9 Friday, April 10, 2020, 1:02 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 5649 Upper 179th St. W., Lakeville Eagan, MN 55121 Page 6 Building Rotation Report All rotation degree values in this report are clockwise with respect to the project's original orientation. Building orientation as entered (zero degrees rotation): Front door faces South Individual Rooms Rm. No. Room Name 0° Rot. CFM 45° Rot. CFM 90° Rot. CFM 135° Rot. CFM 180° Rot. CFM 225° Rot. CFM 270° Rot. CFM 315° Rot. CFM High Duct Size System 1: Zone 1: 1 Main floor 440 533 586 556 495 609 *658 566 6--6 2 Basement 120 202 258 237 183 258 *287 213 3--6 3 Second Floor 325 397 423 406 351 448 *481 425 4--6 * Indicates highest CFM of all rotations. Whole Building Rotation Degrees Front door Faces Supply CFM Sensible Gain Latent Gain Net Tons 0°South 885 19,655 5,804 2.12 45°Southwest 1,133 24,946 5,804 2.56 90°West 1,266 27,800 5,804 2.80 135°Northwest 1,198 26,351 5,804 2.68 180°North 1,029 22,739 5,804 2.38 225°Northeast 1,316 28,851 5,804 2.89 270°East *1,426 *31,202 5,804 *3.08 315°Southeast 1,204 26,463 *5,804 2.69 * Indicates highest value of all rotations. 2.0 2.2 2.4 2.6 2.8 3.0 South Southwest West Northwest North Northeast East SoutheastCooling TonsDirection Front door Faces Building Rotation Tonnage Building Net Tonnage D:\5649 Upper 179th St. W., Lakeville - Heat Calc.rh9 Friday, April 10, 2020, 1:02 PM Rhvac - Residential & Light Commercial HVAC Loads Elite Software Development, Inc. Silver Tree Plumbing & Heating 5649 Upper 179th St. W., Lakeville Eagan, MN 55121 Page 7 Building Rotation Report (cont'd) 22,000 23,000 24,000 25,000 26,000 27,000 28,000 29,000 30,000 31,000 32,000 33,000 34,000 35,000 36,000 37,000 38,000 39,000 40,000 41,000 42,000 43,000 8 am 9 am 10 am 11 am 12 pm 1 pm 2 pm 3 pm 4 pm 5 pm 6 pm 7 pmBuilding Net Gain, BtuhTime of Day Building Rotation Hourly Net Gain Front door faces South Front door faces Southwest Front door faces West Front door faces Northwest Front door faces North Front door faces Northeast Front door faces East Front door faces Southeast D:\5649 Upper 179th St. W., Lakeville - Heat Calc.rh9 Friday, April 10, 2020, 1:02 PM