Loading...
HomeMy WebLinkAbout5649 Upper 179th St SurveyHOUSE ELEVATION DATA HOUSE TYPE = TWO STORY LOT TYPE = WALKOUT BASEMENT WALL HEIGHT = 9.0 PROPOSED GARAGE FLOOR EL.= 929.8 PROPOSED TOP OF BLOCK EL.= 930.1 PROPOSED LOWEST FLOOR EL.= 921.4 HOUSE ELEVATION DATA HOUSE TYPE = TWO STORY LOT TYPE = WALKOUT BASEMENT WALL HEIGHT = 9.0 PROPOSED GARAGE FLOOR EL.= 929.8 PROPOSED TOP OF BLOCK EL.= 930.1 PROPOSED LOWEST FLOOR EL.= 921.4 Zoning = RS-4FY - 20' House, 25' Garage SY - 7' Interior, 20' CornerRY - 30'SY Buffer - 30' RY Buffer - 50' The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection. EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________04/21/2020 lritchie