Loading...
HomeMy WebLinkAboutItem 04 CITY OF LAKEVILLE PLANNING COMMISSION MEETING MINUTES March 19, 2020 Chair Kaluza called the meeting to order at 6:13 p.m. in the Council Chambers at City Hall. The pledge of allegiance to the flag was given. Members Present: Chair Pat Kaluza, Karl Drotning, Jeff Witte, Jason Swenson Members Absent: Vice Chair Scott Einck, Brooks Lillehei, Jenna Majorowicz, Ex-officio Mike Lamm Others Present: Daryl Morey, Planning Director; Kris Jenson, Associate Planner; Penny Brevig, Recording Secretary 3. Approval of the Meeting Minutes The February 20, 2020 Planning Commission meeting minutes and work session minutes were approved as presented. 4. Announcements Mr. Morey stated that staff received four e-mails from residents concerning Glacier Creek that have been distributed to the Planning Commission at tonight’s meeting. Mr. Morey stated that due to the lack of agenda items the April 2, 2020 Planning Commission meeting will be cancelled. Future meetings are to be determined. Mr. Morey indicated that he would like the Planning Commission to e-mail Ms. Brevig and let her know their availability for a possible meeting on April 23. 5. Independent School District #194 Chair Kaluza opened the public hearing to consider the application of ISD #194 for an amendment to conditional use permit #91-01 to allow the construction of a gymnasium addition to McGuire Middle School in the RM-1, Medium Density Residential District, located at 21220 Holyoke Avenue. Sean Kelly from Wold Architects and Grant Jacobson from Jacobson Engineers and Surveyors were present at tonight’s meeting. Mr. Kelley presented a brief overview of their request. Planning Director Daryl Morey presented the planning report. Mr. Morey stated that ISD #194 representatives are requesting an amendment to CUP #91-01 to allow a 17,345 square foot gymnasium expansion on the east side of the existing school. Planning Commission Meeting Minutes, March 19 , 2020 Page 2 Mr. Morey stated that per Monica Waite’s planning report dated March 13, 2020, all performance standards have been met. The access to the property will remain unaffected and no additional parking spaces will be required with this proposed addition. Mr. Morey suggested one additional stipulation: 7. The school district shall sign the Stormwater Maintenance Agreement prior to the issuance of a building permit for the addition. Planning and Engineering staff recommend approval of the McGuire CUP amendment subject to the stipulations listed in the March 13, 2020 planning report, as amended, and adoption of the Findings of Fact dated March 19, 2020. Chair Kaluza opened the hearing to the public for comment. There were no comments from the audience. Motion was made by Drotning, seconded by Witte to close the public hearing at 6:20 p.m. Voice vote was taken on the motion. Ayes - unanimous Chair Kaluza asked for comments from the Planning Commission. There was no discussion. The Planning Commission agreed this application was fairly routine. Motion was made by Witte, seconded by Swenson to recommend to City Council approval of an amendment to conditional use permit #91-01 to allow the construction of a gymnasium addition to McGuire Middle School in the RM-1, Medium Density Residential District, located at 21220 Holyoke Avenue, subject to the following stipulations, as amended, and adoption of the Findings of Fact dated March 19, 2020: 1. The site plan and building addition shall be developed in accordance with the plans approved by the City Council. 2. A building permit is required prior to commencing construction of the building addition. 3. The proposed building addition shall be sided with brick to match the existing building. All building materials shall meet the requirements for an institutional use in the RM-1 District. 4. The building addition is subject to review by the Fire Marshal. 5. Lighting shall be down-cast type only and must comply with Section 11-16-17 of the Zoning Ordinance. 6. The recommendations listed in the March 13, 2020 engineering report. 7. The school district shall sign the Stormwater Maintenance Agreement prior to the issuance of a building permit for the addition. Ayes: Swenson, Kaluza, Witte, Drotning Nays: 0 Planning Commission Meeting Minutes, March 19 , 2020 Page 3 Mr. Morey stated there will be a Special City Council meeting on Monday, March 23rd for the City Council to review ISD #194’s CUP amendment request. 6. Glacier Creek Chair Kaluza opened the public hearing to consider the application of J. David Management, LLC for the following, located south of 179th Street, east of Glacier Way, and west of the municipal boundary with the City of Farmington: A. Preliminary plat of 99 single family residential lots and 116 attached townhome lots to be known as Glacier Creek; and B. Zoning Map amendment to rezone a portion of the property from RA, Rural Agricultural District to RM-1, Medium Density Residential District and RS-4, Single Family Residential District. Matt Olson from Brandl Anderson Homes and John Molinaro from Pioneer Engineering presented a brief overview of their request. Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated that the developer has applied to amend the Zoning Map for the area zoned RA and north of Middle Creek to RM-1 District and the remainder of the parcel zoned RA to RS-4 District. This is consistent with the 2040 Land Use Plan. Ms. Jenson stated that the guest parking is not seen on the preliminary plat, but 58 parking spaces are proposed within five parking areas across the townhome portion of Glacier Creek, which meets Zoning Ordinance requirements. Ms. Jenson responded to the resident’s concerns regarding the extension of 181st Street. She indicated that 181st Street in Glacier Creek will provide a connection and access to Glacier Way to the west and will terminate in a temporary cul-de-sac at the east plat boundary. Ms. Jenson pointed out that Glacier Way will be extended to the north to intersect with 179th Street with the future development of the Devney property. Ms. Jenson indicated that all of the single family lots meet the lot area, width and depth requirements of the RS-4 District and have adequate building pad areas that meet setback requirements for principal structures per Zoning Ordinance requirements. Mr. Jenson stated that the Glacier Creek preliminary plat must be adjusted to increase the front yard setback to the back of the private drive from 25 feet to 30 feet on Lots 1-10, prior to consideration of the preliminary plat by the City Council. The proposed unit lots have sufficient area to accommodate attached townhome units in compliance with the 30 foot front setback requirement. Ms. Jenson reviewed the landscaping plans and how the plans must be modified prior to City Council consideration. Mr. Jenson stated that Stipulation #2 in the March 12, 2020 planning report shall be amended to read: Planning Commission Meeting Minutes, March 19 , 2020 Page 4 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. Planning and Engineering staff recommend approval of the Glacier Creek preliminary plat and Zoning Map amendment, subject to the 12 stipulations listed in the March 12, 2020 planning report, as amended, and adoption of the amended Findings of Fact dated March 19, 2020. Chair Kaluza opened the hearing to the public for comment. There were no comments from the audience. Motion was made by Swenson, seconded by Witte to close the public hearing at 6:29 p.m. Voice vote was taken on the motion. Ayes - unanimous Chair Kaluza asked for comments from the Planning Commission. Discussion points included: • Project phasing was discussed. Mr. Olson stated that their goal is to grade the entire site and then final plat three phases within three years. The utilities will be constructed incrementally with each phase. A portion of the single family lots will be included in the first phase. The townhomes will be developed in one phase. • Mr. Morey suggested the following additional stipulation regarding phasing of the project. 13. The developer shall submit a draft phasing plan prior to submittal of a final plat. • Commissioner Drotning indicated the development of Glacier Creek will be disruptive to the existing neighbors so he stressed that the developer should work closely with City staff and the neighbors to minimize the disruption. • Commissioner Witte confirmed that Glacier Way, as a minor collector, will be able to handle the traffic from the Glacier Creek development. • There was a short discussion regarding 185th Street. Mr. Morey stated that west of Cedar Avenue 185th Street will be extended to Highview Avenue with the development of Pinnacle Reserve at Avonlea. There is the potential that 185th Street will be connected to Highview Avenue this year or next year. Motion was made by Swenson, seconded by Drotning to recommend to City Council approval of the Glacier Creek preliminary plat of 99 single family residential lots and 116 attached townhome lots and a Zoning Map amendment to rezone a portion of the property from RA, Rural Agricultural District to RM -1, Medium Density Residential District and RS-4, Single Family Residential District on property located south of 179th Street, east of Glacier Way, and west of the municipal boundary with Planning Commission Meeting Minutes, March 19 , 2020 Page 5 the City of Farmington, subject to the following stipulations, as amended, and adoption of the amended Findings of Fact dated March 19, 2020: 1. Implementation of the recommendations listed in the March 12, 2020 engineering report. 2. Park dedication shall be satisfied with a cash contribution paid with the final plat for each development phase. 3. The developer shall construct five-foot-wide concrete sidewalks as shown on the preliminary plat plans as well as an eight-foot-wide bituminous trail along the east side of Glacier Way as shown on the plans. 4. Outlots A, B, C, and D shall be deeded to the City with the final plat. 5. All new local utilities and any existing overhead service utilities located on the property shall be placed underground. 6. A homeowner’s association must be established for ownership and maintenance of the common area townhome lots. 7. Attached townhomes must meet the exterior material requirements of Section 11- 58-21.C.4 of the Zoning Ordinance. 8. The developer must submit dimensioned floor plans for the attached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13D of the Zoning Ordinance. 9. Each attached townhome unit shall include an attached garage meeting the minimum width and area requirements of Section 11-58-21D of the Zoning Ordinance. 10. Prior to approval of the final plat, the developer shall provide details to verify compliance with the landscape requirements of Section 11-58-21K of the Zoning Ordinance. 11. Prior to City Council consideration of the preliminary plat, Lots 1-10 of the attached townhomes must be adjusted to have a front yard setback of 30 feet to the back of the private drive. 12. Prior to City Council consideration of the preliminary plat, the landscape plans must be modified to show the species of plantings proposed along guest parking areas. 13.The developer shall submit a draft phasing plan prior to submittal of a final plat. Ayes: Kaluza, Witte, Drotning, Swenson Nays: 0 7. Cedar Hills Chair Kaluza opened the public hearing to consider the application of Green Key Real Estate Group for the following, located south of 200th Street (CR 64) and east of Cedar Avenue (CSAH 23): A. Preliminary plat of 139 single family residential lots, 92 attached townhome lots, and 137 detached townhome lots to be known as Cedar Hills; B. Zoning Map amendment to rezone the property from RS-3, Single Family Residential District and RM-1, Medium Density Residential District to RS-4, Single Family Residential District and RM-1, Medium Density Residential District; and C. Vacation of public street and utility easements. Planning Commission Meeting Minutes, March 19 , 2020 Page 6 Jason Palmby from Green Key Real Estate Group presented a brief overview of their request. Mr. Palmby stated that an EAW was required because of the number of residential units that are proposed. He indicated their phasing plan will cover a few years with the first phase being the single family homes on the west side of the development. Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated that the City Council adopted a Negative Declaration on the EAW on January 6, 2020, following the preparation of an Environmental Assessment Worksheet (EAW) consistent with Environmental Quality Board (EQB) requirements. Ms. Jenson commented that the developer has applied to amend the Zoning Map such that the north half of the property would be zoned RM-1 and the south half of the property would be zoned RS-4 which are both consistent with the low/medium density residential land use that the property is guided for in the 2040 Land Use Plan. Ms. Jenson explained that the construction of 205th Street in conjunction with the Spyglass development required a street and utility easement for the portion of 205th Street outside the Spyglass plat boundary. That easement is requested to be vacated and will be replaced with dedicated right of way in the Cedar Hills plat. Also, Ms. Jenson stated that a permanent easement north of 205th Street for a culvert under 205th Street was advertised to be vacated but it has been determined that the easement should remain in place. The easement will be located in Outlot H, which will be deeded to the City with the final plat. All the single family lots meet the lot area, width and depth requirements of the RS-4 District. The Cedar Hills plans indicate that all 139 single family lots have adequate building pad areas that meet setback requirements for principal structures per the Zoning Ordinance. The proposed unit lots have sufficient area to accommodate the detached and attached townhome units. The Cedar Hills plat meets the RM-1 District requirements for lot area per townhouse unit. Each townhome unit shall include an attached garage meeting the minimum width and area requirements of the Zoning Ordinance. Ms. Jenson stated that prior to City Council consideration of the preliminary plat, revised landscape and tree preservation plans showing the current guest parking locations must be submitted. Ms. Jenson reviewed the increased residential buffer yard requirements for 20 of the single family lots that abut Cedar Avenue and future 202nd Street. Ms. Jenson reviewed some of the proposed streets for the Cedar Hills preliminary plat, which are explained in detail in the Planning and Engineering reports both dated March 12, 2020. Planning and Engineering staff recommend approval of the Cedar Hills preliminary plat, Zoning Map amendment and easement vacation subject to the 16 stipulations listed in the March 12, 2020 planning report, and adoption of the amended Findings of Fact dated March 19, 2020. Planning Commission Meeting Minutes, March 19 , 2020 Page 7 Chair Kaluza opened the hearing to the public for comment. There were no comments from the audience. Motion was made by Drotning, seconded by Witte to close the public hearing at 6:56 p.m. Voice vote was taken on the motion. Ayes - unanimous Chair Kaluza asked for comments from the Planning Commission. Discussion points included: • Commissioner Drotning asked staff to explain the park dedication requirement. Ms. Jenson stated that the Cedar Hills preliminary plat proposes deeding Outlot I, which is located adjacent to the existing Spyglass park to the south, to the City for park purposes. Three acres from that outlot will be credited to the park dedication requirement. • There was a short discussion on proposed street extensions into Farmington. Motion was made by Swenson, seconded by Witte to recommend to City Council approval of: A. Cedar Hills preliminary plat of 139 single family residential lots, 92 attached townhome lots and 137 detached townhome lots located south of 200th Street (CR 64) and east of Cedar Avenue (CSAH 23); B. Zoning Map amendment to rezone the property from RS-3, Single Family Residential District and RM-1, Medium Density Residential District to RS-4, Single Family Residential District and RM-1, Medium Density Residential District; and C. Vacation of public street and utility easements, subject to the following stipulations and adoption of the amended Findings of Fact dated March 19, 2020: 1. Implementation of the recommendations listed in the March 12, 2020 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The Developer shall construct 5-foot-wide concrete sidewalks as shown on the preliminary plat plans. The Developer shall construct a bituminous trail along the east side of Cedar Avenue, both sides of 202nd Street, the south side of 200th Street from Cedar Avenue to Street 1, the west side of Street 11 adjacent to Outlot I, and east of Street 11 through Outlot J to the east plat boundary. 4. Outlots A, B, D, G, H, I, J, and K shall be deeded to the City with the final plat. 5. Outlot E shall be combined with Lot 21, Block 4 with the final plat. 6. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The single family lots abutting Cedar Avenue and 202nd Street must install sod to the trail and a $1,000 per lot security will be required with the building permit. 7. The following lots hall have restricted driveway access: • Lot 1, Block 18 must have driveway access from Street 11 • Lots 3-8, Block 11 must have driveway access from Street 14 Planning Commission Meeting Minutes, March 19 , 2020 Page 8 • Lots 23-26, Block 13 must have driveway access from Street 16 • Lots 1-4, Block 17 must have driveway access from Street 17 • Lots 4-10, Block 18 must have driveway access from Street 19 8. Streets 8 and 9 must have future street extension signs and barricades placed at the east end of each street. 9. Street 8 requires a temporary cul-de-sac, for which a temporary easement must be executed by the Developer with the final plat and a security submitted for the future removal of the temporary cul-de-sac. 10. All new local utilities and the existing overhead service utilities located along the south side of 200th Street shall be placed underground. 11. A homeowner’s association must be established for ownership and maintenance of the following lots: Lot 58, Block 1; Lot 28, Block 2; Lot 30, Block 3; Lot 21, Block 4; and Lot 4, Block 5; Lot 12, Block 6; Lot 29, Block 7; Lot 4, Block 8; Lot 28, Block 9; Lot 25, Block 10; and Outlots C, E, and F. 12. All townhome units must meet the exterior materials requirements of Section 11- 58-21.C.4 of the Zoning Ordinance. 13. The Developer must submit dimensioned floor plans for the townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13.D of the Zoning Ordinance. 14. Each townhome unit shall include an attached garage meeting the minimum width and area requirements of Section 11-58-21.D of the Zoning Ordinance. 15. The Developer shall provide details to verify compliance with the landscape requirements of Section 11-58-21.K of the Zoning Ordinance. 16. Prior to City council consideration of the preliminary plat, revised landscape and tree preservation plans showing the current guest parking locations must be submitted. Ayes: Witte, Drotning, Swenson, Kaluza Nays: 0 Chair Kaluza thanked City staff for all they are doing to accommodate developers to keep projects moving forward during these unstable times. There being no further business, the meeting was adjourned at 7:01 p.m. Respectfully submitted, Penny Brevig, Recording Secretary