HomeMy WebLinkAbout17982 Evening Lane SurveyThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted
before As-built escrow monies will be released. All structures must be flush with the sod. This
will be scheduled with the landscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between siding & sod
*No structures in easements
ENGINEERING REVIEWED
Date:__________________04/20/2020 lritchie
Zoning = RS-4