Loading...
HomeMy WebLinkAbout17982 Evening Lane SurveyThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and accepted before As-built escrow monies will be released. All structures must be flush with the sod. This will be scheduled with the landscape inspection. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between siding & sod *No structures in easements ENGINEERING REVIEWED Date:__________________04/20/2020 lritchie Zoning = RS-4