HomeMy WebLinkAboutItem 071
City of Lakeville
Planning Department
Memorandum
To Planning Commission
From: Frank Dempsey, AICP, Associate Planner
Date: May 1, 2020
Subject: Packet Material for the May 7, 2020 Planning Commission Meeting
Agenda Item: FedEx Lakeville 2nd Addition:
1) Preliminary and final plat of one lot
2) Vacation of drainage and utility easement
Application Action Deadline. The 120-day application action deadline for the
preliminary plat is June 27, 2020.
BACKGROUND
Setzer Properties SMN, LLC has submitted applications and plans for the preliminary
and final plat of one lot to be known as FedEx Lakeville 2nd Addition and for the
vacation of a drainage and utility easement to allow an expansion of the existing FedEx
cross-dock transload facility, maintenance building and trailer parking area. There is
93,600 square feet of building area on the property consisting of office, maintenance,
and warehouse buildings with Phase I constructed in 2015. The proposed Phase II
building expansion consists of 88,255 square feet of expansions to the maintenance
and warehouse buildings bringing to the total building area to 181,855 square feet.
The preliminary and final plat will incorporate Outlot A from the first phase project as
part of Lot 1, Block 1, FedEx 2nd Addition. The property is 43.48 acres in area is zoned I-
1, Light Industrial District, and is located at 9331 – 217th Street at the southeast
quadrant of 215th Street (CSAH 70) and Dodd Boulevard (CSAH 9).
FedEx Freight provides delivery services for large containers which are delivered to and
trans-loaded at this dock facility for delivery to other locations. The first phase of the
FedEx site was approved in 2014 and developed in 2015.
The preliminary plat plans have been submitted to:
2
1. The Engineering Division
2. The Parks and Recreation Department
3. The Parks, Recreation and Natural Resources Committee
4. The Dakota County Plat Commission
EXHIBITS
A. Location and Zoning Map
B. Aerial Photo Map
C. Easement Vacation Sketch
D. Preliminary Plat
E. Proposed CSAH 70 Layout
F. Phase I Master Site Plan
G. Existing Site Plan
H. Phase II Site Plan (2 Pages)
I. Grading Plan (4 Pages)
J. Maintenance Shop Floor Plan
K. Maintenance Shop North Wall Elevation Plan
L. Fuel Facility Expansion Plan
M. Transload Dock Plans East and North Face Walls (2 Pages)
N. Photometric Lighting Plan
O. Conditional Use Permit 14-06
P. Dakota County Plat Commission Letter, dated March 18, 2020
Zoning and Surrounding Uses. The property is zoned I-1, Light Industrial District. The
proposed project is surrounded by the following land uses:
Direction Existing Use Zoning
North 215th Street (CSAH 70) and Single Family
Homes
RS-3 Single Family Residential
District
South 217th Street and Industrial Buildings
I-1, Light Industrial District
East Dick’s Sanitation/Lakeville Sanitation Planned Unit Development (PUD)
West Dodd Blvd. (CSAH 9) and Undeveloped
Property in Agricultural Use
I-1, Light Industrial District
Comprehensive Plan. The subject property lies within Planning District No. 6. The
proposed FedEx facility expansion is consistent with the land use guidelines outlined in
the 2040 Comprehensive Plan.
3
PLANNING ANALYSIS
EASEMENT VACATION
Boundary drainage and utility easements were dedicated with the FedEx Lakeville final
plat, as required by the Subdivision Ordinance. When a property is re-platted, all
drainage and utility easements are required to be vacated and re-established with the
new final plat. This removes all underlying easements on the property and prevents
layering of easements over time, thus maintaining clear title to the property.
All parties with a potential interest in the easement vacation (generally utility
companies) have been notified and have not responded in opposition to the vacation.
PRELIMINARY AND FINAL PLAT
a. Existing Site Conditions. The 43.48 acre site is undeveloped and is platted as Lot 1,
Block 1 and Outlot A and Outlot B, FedEx Lakeville. The area of Outlot A is the last
remaining portion of the property to be developed. Outlot A consists of stormwater
basins to accommodate stormwater drainage from the FedEx property. The second
phase plans propose that all stormwater from the property will be collected in
underground storage chambers before being discharged from the site. A Great River
Energy electrical transmission line easement runs along the north boundary of the
property and includes pole structures with 115 kilovolt transmission lines. The
transmission line easement is private and will not be vacated as part of the easement
vacation request.
b. Lots/Blocks. The preliminary plat of FedEx Lakeville 2nd Addition consists of one lot
and one block with no outlots. The proposed area of the lot exceeds the minimum lot
area and lot width requirements for the I-1, Light Industrial District. The following is a
tabulation of the lot area as noted on the preliminary and final plat plans.
Preliminary and Final Plat
Lot Area/and
Lot Width Requirements
Lot 1
30,000 sf Area 43.48 acres
100 ft Width 1,528 ft.
c. Streets. The area of the preliminary and final plat of FedEx Lakeville 2nd Addition is
bounded by 215th Street (CSAH 70) to the north, Dodd Boulevard (CSAH 9) to the west,
217th Street to the south and Humboldt Road to the east. All required road
construction and improvements were made with the first phase development of the
FedEx property.
4
The streets serving the FedEx property, including 217th Street, Dodd Boulevard and
215th Street are capable of accommodating the anticipated traffic generated by this
facility.
215th Street (CSAH 70) is under the jurisdiction of Dakota County and is classified as a
principal arterial roadway. The 2030 average daily traffic estimates for 215th Street
anticipate approximately 17,000 to 20,000 vehicle trips per day between Dodd
Boulevard and Interstate 35 and 15,000 to 20,000 vehicle trips per day between Dodd
Boulevard and Cedar Avenue (CSAH 23). 215 th Street will undergo construction
improvements starting in 2020 and concluding in 2022 and will include a four-lane
divided urban roadway between Interstate 35 and Cedar Avenue. No additional right-
of-way is needed from the proposed FedEx Lakeville 2nd Addition preliminary and final
plat.
Due to federal regulations pertaining to the widening of federal aid roads adjacent to
residential properties such as those adjacent to the north side 215th Street, the road
improvement project will include construction of a 20 foot tall sound wall parallel to
the residential portion of 215th Street and the adjacent single family homes. The sound
wall will also provide an effective visual screen between the single family homes and
the FedEx property.
Dodd Boulevard (CSAH 9) is under the jurisdiction of Dakota County and abuts the west
side of the preliminary and final plat. Dodd Boulevard is classified as a low density
minor arterial roadway as identified in the Comprehensive Transportation Plan. All
required right-of-way dedication and turn lane improvements were completed with
the FedEx Lakeville final plat in 2015.
Humboldt Road. The Transportation Plan identifies Humboldt Road as a minor
collector roadway link between 220th Street to the south and 215th Street (CSAH 70) to
the north. Humboldt Road was constructed in 2008 with the First Park Lakeville plat
and extended to 215th Street in 2015 with the first phase FedEx development. The
Humboldt Road intersection at 215th Street will be temporarily closed during the 215th
Street improvement project. All access to FedEx and Dick’s Sanitation during the road
improvement project will be from Dodd Boulevard at 217th Street to Humboldt Road.
217th Street. 217th Street is an extension of Humboldt Road and is also classified as a
minor collector road between Dodd Boulevard and Humboldt Road.
The Dakota County Plat Commission reviewed the preliminary plat at their March 18,
2020 meeting. The Plat Commission approved the preliminary plat at that meeting. A
copy of the March 18, 2020 letter from the Plat Commission is attached as Exhibit M.
d. Grading, Drainage, Erosion Control and Utilities. City sewer and water currently
serves the FedEx property and is available and adequate to serve the proposed FedEx
phase two development. All required utilities and public improvements were funded
by FedEx with the development of the site in 2015.
5
Grading and utility plans have been submitted with the FedEx Lakeville 2nd Addition
preliminary and final plat. Grading, drainage, erosion control, and utility issues are
addressed in the engineering report prepared by Alex Jordan, Assistant City Engineer
and Mac Cafferty, Environmental Resources Manager. The engineering report is dated
April 25, 2020 and is attached for your information. The Engineering Division
recommends approval of the FedEx Lakeville 2nd Addition preliminary and final plat and
easement vacation.
e. Wetlands. There are no wetlands within the FedEx Lakeville 2nd Addition preliminary
and final plat.
f. Tree Preservation. There are no sign ificant trees to be affected by the development
of the FedEx Lakeville 2nd Addition preliminary and final plat.
g. Park Dedication, Trails and Sidewalks. The City’s Comprehensive Parks, Trails, and
Open Space Plan does not identify any future park needs in the area of the preliminary
and final plat. Park dedication cash fees in lieu of land dedication is required with the
final plat of FedEx 2nd Lakeville Addition, specifically over that area of Outlot A, FedEx
Lakeville. The cash in lieu of land dedication is $4,558.00 per acre totaling $58,661.46.
A trail will be constructed along 215th Street (CSAH 70) as part of the 2020-22 road
improvements. No interior public trails or sidewalks are being constructed with this
plat consistent with the original First Park Lakeville and FedEx Lakeville plats.
h. Airlake Airport. Airlake Airport is considered a reliever airport under the
management of the Metropolitan Airports Commission (MAC). The FedEx property lies
at the end of Safety Zone B of Airlake Airport. FedEx, Dick’s Sanitation and other
industrial buildings and properties within the First Park Lakeville plat are permitted
uses within Safety Zone B. The developer should communicate with the Federal
Aviation Administration (FAA) to determine if a permit is required for use of any cranes
during construction of the second phase FedEx development.
SITE PLAN ANALYSIS
Building Setbacks. The building setback requirements of the I-1 District are being met
with the proposed site plan for phase two construction:
Min. Required Setbacks FedEx Buildings (Lot 1, Block 1)
Front Yard --------40 feet Dock Bldg - 13 6 ft to north property line
Shop Bldg - 163 feet
Fuel Island –100 feet
Rear and Side Yards ---30 feet Maintenance Shop Building – 200+ feet
6
Landscaping/Screening. The landscape plan for Lot 1 of the original FedEx Lakeville
preliminary plat included the planting of nearly 700 trees and tall growing shrubs in
addition to various landscape materials when the site was developed in 2015.
The plans for FedEx Lakeville 2nd Addition do not include a landscape plan for that area
now located between 215th Street and the stormwater basins within existing Outlot A,
FedEx Lakeville. Setzer Properties is drafting a landscaping and screening plan to
increase the amount of landscape materials along 215th Street which will include an
extension of the raised earth berm consistent with the screening design approved and
installed with the first phase in 2015.
It is possible the revised landscape plan will be available prior to the May 7, 2020
Planning Commission meeting; however, a stipulation will be recommended that the
landscape plan be submitted for staff review prior to City Council consideration of the
preliminary and final plat. Landscaping will be designed to maximize screening of the
FedEx property while also accommodating the restrictive maximum height and setback
standards set by Great River Energy for the 115kV electric transmission power line
easement along 215th Street and partly on the FedEx property. A financial security shall
be submitted to guarantee installation of the landscaping.
Access. Access to the site will remain at its present location at 217th Street.
Parking. The FedEx buildings currently include an office, warehouse and a maintenance
shop with a combined building area of 93,600 square feet. A total of 178 parking spaces
were constructed with the first phase, exceeding the minimum 122 parking spaces as
required by the Zoning Ordinance. The second phase will require a total of 83 additional
parking spaces for a minimum required total of 205 spaces. Employee parking is located at
the southwest corner of the property. Required parking is based on the following formula:
Required and Proposed Parking
Total Building Square Footage -- 181,855 square feet
Warehouse – 155,545 sf 140 spaces
Maintenance Shop – 18,080 sf 28 spaces
Existing Office – 8,200 sf 37 spaces
Employee Parking Required 205 spaces
Employee Parking Proposed 386 spaces
The proposed parking lot design, parking spaces and drive aisle dimensions meet the
requirements of the Zoning Ordinance. Parking aisles will be 24 feet in width and
parking stall dimensions will be 9 feet in width and 20 feet in length. All required
parking spaces will be in place for the first and second phase buildings.
Circulation. The driveways and interior layout provide adequate width and turning
radii to accommodate truck turning movements and emergency vehicle access.
7
Outdoor Storage. There will be no outdoor storage on the FedEx property other than
the parking of trucks, trailers and delivery vans in various stages of continuous motion
of loading, unloading, awaiting delivery of freight for distribution to other locations or
waiting for repair, consistent with the existing site operations. Semi-trucks or trailers
will not use parking spaces designed for employees or visitors.
Fuel Depot. The existing fuel depot facility with an overhead canopy and underground
fuel storage located 120 feet north and east of the maintenance shop, will be expanded
as noted on the site plan and building sectional views. The fuel facility will provide fuel
for FedEx vehicles. All building and fire code permits shall be obtained prior to
installation.
Signage. No additional signage is proposed.
Site Lighting. A photometric and overall lighting plan has been submitted but does
not identify foot-candle measurements at the property line in accordance with Zoning
Ordinance requirements. The proposed new lighting fixtures must be consistent with
the site lighting installed with the first phase. These are downcast LED fixtures designed
to prevent excessive glare and excess light from leaving the property. Lights on the
dock building or other buildings will illuminate the exterior of the dock facility. These
types of light fixtures must be downcast to minimize visibility of the light source from
the property line.
Trash Enclosures. All trash containers not stored inside a building must be located in
screened enclosures constructed in compliance with Section 11-18-11 of the Zoning
Ordinance. All outdoor trash enclosures must be designed to a minimum of 6 feet in
height with a maintenance free screening gate and constructed of materials that match
the architecture of the principal building. Recyclable material and recycling
compactors are not required to be screened. The building permit plans and site plans
must include any trash enclosure details that comply with Zoning Ordinance
requirements.
Snow Storage. There is adequate space on site to accommodate snow storage. Snow
storage cannot take place in required automobile parking spaces.
Building Design/Architecture. The proposed maintenance building expansion will be
constructed of exterior materials matching the existing maintenance building.
Conditional Use Permit 14-06 was approved in conjunction with the FedEx Lakeville
plat that allowed temporary prefinished metal wall panels on the north and east facing
end walls of the transload dock building until such time the phase two expansion is
proposed. A stipulation is recommended that the Phase Two building plans be revised
so that the exterior north and east end walls of the transload dock building comply
with Section 11-18 of the Zoning Ordinance prior to City Council consideration of the
preliminary and final plat.
8
Mechanical Equipment. No roof top mechanical equipment is identified. Any
additional roof top mechanical equipment must be identified on the building plans
submitted for building permit. Any roof-top mechanical equipment shall be screened
from view of public right-of-way by an adequate parapet or other similar structure as
required by the Zoning Ordinance.
RECOMMENDATION
Planning Department staff recommends approval of the FedEx Lakeville 2nd Addition
preliminary and final plat and easement vacation subject to the following stipulations:
1. Implementation of the recommendations listed in the April 25, 2020
engineering report.
2. The site and buildings shall be developed in compliance with the plans as
approved by the City Council and in accordance with Zoning Ordinance
requirements.
3. The building exterior plans for the north and east facing end walls of the
transload dock building shall be amended to comply with the minimum exterior
material requirements of the Zoning Ordinance prior to City Council
consideration of the preliminary and final plat.
4. A landscape plan shall be submitted for staff review prior to City Council
consideration of the preliminary and final plat.
5. Any roof-mounted mechanical equipment shall be screened from view of public
right-of-way by an adequate parapet or other similar structure as required by
the Zoning Ordinance.
6. Snow storage shall not take place in required parking spaces. If there is not
adequate space to store snow on site, snow must be hauled from the site.
7. Site lighting fixtures shall be consistent with the existing fixtures on the
property. The exterior site and building lighting plan shall be revised to identify
proposed exterior lighting not to exceed one foot-candle at the property line.
8. The building permit plans and site plans must include outdoor trash enclosure
details that comply with Zoning Ordinance requirements. The trash enclosures
shall match the exterior materials of the principal buildings and shall include
maintenance free gates.
9
9. The developer shall verify with the Federal Aviation Administration (FAA) prior
to commencing building construction to determine if a permit is required for
any crane of similar construction equipment on the property.
10. The stipulations of CUP 14-06 shall remain in full force and effect.
RM-1 P/OS
PUD
I-1
RS-2
PUD
P/OS
I-1
RST-2
I-1
I-2
RS-2
RS-2RS-3
RS-3OP
45679
45679
456770 456770
DODD BLVDIDAHOAVE215TH ST W
212TH ST W
H YTR A ILCIRINDEPENDENCEAVEHYACINTHAVE217T H STW IBIS AVEINSEL LNH YA LITEDRH
YTRAILC IR
220T H ST W HUMBOLDTRDILAVIS TA WAY
Ü
FEDEX LAKEVILLE 2ND ADDITION
EXHIBIT A
FEDEX LAKEVILLE 2ND ADDITION
Property Information
March 3, 2020
0 875 1,750437.5 ft
0 270 540135 m
1:9,600
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
EXHIBIT B
EXHIBIT C
EXHIBIT D
EXHIBIT E
EXHBIIT F
DODD BLVD
217TH STREET W215TH STREET WHUMBOLDT ROAD
Know what'sbelow.before you dig.CallREXHIBIT G
DODD BLVD
217TH STREET W215TH STREET WHUMBOLDT ROAD
FEDEX FREIGHT EXPANSIONKnow what'sbelow.before you dig.CallR
217TH STREET WESTDODD BOULEVARDKnow what'sbelow.before you dig.CallREXHIBIT H
DODD BLVD
217TH STREET W215TH STREET WHUMBOLDT ROAD
Know what'sbelow.before you dig.CallREXHIBIT I
Know what'sbelow.before you dig.CallR217TH STREET WEST
Know what'sbelow.before you dig.CallR217TH STREET WEST
Know what'sbelow.before you dig.CallR217TH STREET WESTDODD BOULEVARD
EXHIBIT J
EXHIBIT K
EXHIBIT L
i r r 2 3 �s
I I I I I I I
[ p [ ;;::i [ ;;::i [ ;::i I [ ;;::i I ' ' ' . . . . .
�
� -rb--I I I I I I I I I I I I ' ii I II I I ,I ,I I I I I ,I I
� � w � � � � � � _@! �� �' ' ' '� �, ' ' ' f ' f� I I I I I I I I I I I I I I I , , , ',
............... • ...... .......... ............... .................. .... ........ ........ -j_ .IIL •••••
I
23 11 26 1 17 8 17 1
I I
13 I ' . . . I I ' r i [
�
I I I I II ,I ,I I ,I I I ,I' '' ' �, ' I ' ' I I I ' ' I ' I ' I
.......... ,T .............. •••••••••••••••• J ................. • .................
r r
I I
[ p I ' . . . . I I I I I I II I I ,I ,I I' ' ' ' '� I I I ' ' I I
. ... '·················' . .......
UJ I UJ z z
I I
-1---' -'
u u�I� :E I :E
'· ' I I II I
� '§ I '�
-
,.J
ELEVATION KEYED NOTES
THESE NOTES ONLY APPLY TO 11,E BUILDING ELEVATIONS AS SHOWN 11,JS SHEET.
0 KEY NOTE SYMBOL
1.OVERHEAD COILING SHEET DOORS. SEE FXF SPECIFICATIONS II. DOOR SCHEDULE· COLORWHITE.
2.MECHANICALLY SEAMED METAL ROOF ON STRUCTURAL PURLINS, SUPPLIED BY PEMBMANUFACTURER II. INSTALLED BY G.C.
3.CONTINUOUS "J" TRIM AT BOTTOM OF METAL WALL PANELS· COLOR TO MATCH WALLPANEL COLOR.
4.3/16" THICK x 2'-5 1/2" W. x 10'-2" L. STEEL PLATE BETWEEN OVERHEAD COILING DOORSWELDED TO MIN 12 GA DOOR POST WITH 2" FILLET WELDS@ 24" CENTERS PER PEMB MANUFACTURER. BOTTOM OF PLATE TO BE FLUSH W/OCX.K CHANNEL.
5.DOCK SHELTERS @ ALL COILING DOOR LOCATIONS PER FXF SPEOFICATIONS.
6.EDGE OF DOCK LEVELERS II. BUMPERS WELDED TO CONTINUOUS STEEL CHANNEL(CHANNEL TO BE COLOR 2). PAINT ALL WELDS. REFER TO DETAIL G SHEET AD6.2 II. FXFSPECIFICATIONS .
7.EXISTING BUILDING TO REMAIN -NO WORK THIS AREA UNLESS NOTED OTHERWISE.I------------------------------------I------------------------------------1---•----------------------------------------------------------------------------------------
,
-------------------------------
:
--
1�
--
:
-
:
------
�;
-----
�
--------------------------------,--
8.EXTERIOR OVERHEAD DOCK DOOR NUMBER -SEE DETAIL K SHEET AD6.0. COORDINATENUMBER SYSTEM I.D WITH FXF PROJECT MANAGER.
lf'i:=1---113
9 19
22
I ----�---..J... ----___ :::::J
25 10 18
WEST ELEVATION (POD C)
3/32" = 1'-0"
$ EAVE HE!_GHT =
15'-3 9/16" --
16]-----<e�=I
F.F.E.
(EAST DOCK EXPANSION)
21 20
13J---C::=i=\\
18
12
9.FIELD COLOR AS SELECTED BY FXF.
10.CONCRETE FOOTING PER FOUNDATION DRAWINGS .
....... _ EXISTING BUILDING _ ....J...... _ BUILDING EXPANSION _ ......11.GIJTTER& PROPOSED LOCATION OF DOWNSPOlJTS TO BE CONNECTED TO BELOW GRADESTORM DRAIN SYSTEM. COORDINATE ALL LOCATIONS W/ FXF PROJECT MANAGER II. PEMBDRAWINGS.
EAVE HEIGHT = $
---15'·3 9/16"
F.F.E.
UJIUJ z z
:::::i 1 :::::l I I u u �I� :E :E
. ' . ...
=!I I!:
� I i � I '
i
[;;::J
.'
cl: I!:i I I I
.
:ll I!:
I I I I
2 3
=!I ' ' ' '
23 11 26
=!I I!::!
I I I I
1
13f--U;J
Ill!!
.
=!I I!::! ' '' '
17 8 17
. .
I • NI
=!I ll:
I I I I
.
:ll
I I
20 13
'
PARTIAL SOUTH ELEVATION
3/32" � 1 '-0" (EAST DOCK EXPANSION)
22 23
Ep
11 I 21
'
I I I
D
13 16 1
D
.
I!: i '
r
. I I,I I
:! I!: i I I I
""
UJIUJ z z
:::::i 1 :::::l I I ulu � � :EI :E
'
12.EXTERIOR 6" DIA. SCH. 40 STEEL PIPE BOLLARDS FILLED SOLID W/ CONCRETE. PROVIDEPROTECTIVE PVC SLEEVE W/ STANDARD DUTY INTEGRAL YELLOW OOME CAP · SEE DETAILG OR GG SHEET AD6.0.
13.LIGHT FIXTURE PER ELECTRICAL DRAWINGS.
14.EXISTING TRASH COMPACTOR TO REMAIN.
15.48" X 48" METAL CANOPY PER PEMB MANUFACTURER -MAINTAIN 9'-6" CLEAR UNDERCANOPY.
16.48" X 48" METAL CANOPY PER DETAIL B SHEET ADS.S.
17.PEMB MANUFACTURER DOOR JAMB POSTS SHALL BE CONTINUOUS TO EAVE STRUT BOTH
SIDES OF ALI_ DOORS.
18.METAL STAIR, HANDRAIL II. GUARDRAIL PER FLOOR PLAN.
19.NO EDGE OF OCX.K CHANNEL REQUIRED AT POD OR END WALLS.
20.CONCRETE WALL PANELS PER WALL PANEL DRAWINGS.
21.CONCRETE WALL PANEL JOINT PER WALL PANEL DRAWINGS -CONFIRM JOINT LOCATIONSW/WALL PANEL DRAWINGS.
22.HORIZONTAL RUSTICATION JOINT PER WALL PANEL DRAWINGS -TYPICAL AS SHOWN.
23.CONTINUOUS LOW PROFILE RIDGE CAP BY PEMB MANUFACTURER.
•
�.,
,_24.PASSAGE DOOR II. FRAME PER FLOOR PLANS II. DOOR SCHEDULE.
r __ · -------------__ -_. ___ .. __ � ____ -__ � ____ .. __ � _________ -_qJ)f
.-�
11 ]�l=:i:l===t1:Lr!.Up,"----· ___ � ___ -_· ___ • . ....; __...! 25. CONCRETE STEM WALL PER FOUNDATION DRAWINGS -RUBBED CONCRETE FINISH.JJI· 26.METAL WALL PANEL ATTACHED TO HORIZONTAL WALL GIRTS PER PEMB MANUFACTURER.I I I --------------------------1--------�-----------:51---1------------------➔----------------------1---------1-------�----1.---------•i---i---1-----1-----.-�-1--------------t---l ----------I------1-----1------I
1 r
6 11 1 5 25 10 4 9 19 25 10 12 18 24 18 24 12
PARTIAL SOUTH ELEVATION
3/32" = 1 '-0" (EAST DOCK EXPANSION)
2 3 23 11 26 r 1 1
13f--U;J
EAST ELEVATION (POD C) PARTIAL SOUTH ELEVATION
3/32" = l'-0" (EAST DOCK EXPANSION)
13f----c::=RI
$ EAVE HEIGHT@
BLDG = 16'-8 1/2" -r---
��HEIGHT@ _j �NOPY = 16'-6"
12 18
13 r
I _._ ___________ _�------------
3/32" = 1 '-0" (EAST DOCK EXPANSION)
E
26 23 2 r
1 D
18
,i=e=---j13
�
0
z
0 POD A H POD B
L------7� ---
��
IIA B C D I E F I
18 12
OFFICE
EAST ELEVATION .... I lfJ POD C EXISTING DOCK ! DOCK EXPANSION ...KEY PLAN
3/32" = l'-0" (EAST DOCK EXPANSION) NTS
WILLIAM R THOMAS JR
48748
ARCHITECT
PO BOX 23755 STANLEY, KANSAS 66283
PH 913.742.4081
Lil Lil
�
@ w z z
_J
_J
z r l/)
�ETZER
P�OPE�TIES
DESIGNER:
DRAWN BY: WRT
JOB NO.: 20190701
DATE: 12-12-19
PROJECT REVISIONS
12-12-19
FOR COORDINATION
cc
0:: 0 UJ
N z
UJ 0 IL UJ
EXHIBIT M
EXHIBIT N
t 'T1
Receipt:# 374496
COND $46.00
Return to
CAMPBELL KNUTSON P A.
1380 CORPORATE CTR CUR
317
EAGAN MN 55121
Reserved for Dakota County Recording Information)
3065032
1111111 VIII VIII VIII VIII VIII VIII IIII IIII
Recorded on: 51712015 8:58 AM
By TMB, Deputy
office of the County Recorder
Dakota County, Minnesota
Joel T Beckman, County Recorder
CITY OF LAKEVILLE '/ L to
DAKOTA COUNTY, MINNESOTA
CONDITIONAL USE PERMIT NO. 14-o6
1. Permit. Subject to the terms and conditions set forth herein, the City of Lakeville
approves a Conditional Use Permit to allow an exception to the exterior building material
provisions in the 1-1, Limited Industrial District for the construction of a Fed Ex Freight
facility.
2. Propertx. The permit is for the following described property is located in the City of
Lakeville, Dakota County, Minnesota and is legally described as follows:
Lot 1, Block 1, FEDEX LAKEVILLE
3. Conditions. The permit is issued subject to the following conditions:
a) Implementation of the recommendations listed in the September 12, 2014
engineering report.
b) Implementation of the recommendations of the Parks, Recreation and Natural
Resources Committee.
c) Implementation of the recommendations of the Dakota County Plat Commission.
d) The site and buildings shall be developed in compliance with the plans as approved
by the City Council and in accordance with Zoning Ordinance requirements.
e) The insulated metal panels on the future expansion walls of the warehouse trans -
load building shall be considered temporary until such time that the building is
expanded whereby the permanent walls shall meet the requirements of the
Zoning Ordinance at the time of construction.
EXHIBIT O
f) The developer shall remove the electric power transmission line pole from the
Humboldt Road and 215th Street (CSAH 70) intersection right-of-way prior to or in
conjunction with the Humboldt Road intersection and turn -lane construction.
g) Building exterior materials shall be integral colored masonry only unless
otherwise allowed by the conditional use permit. Painted building exteriors are
not permitted.
h) Any roof -mounted mechanical equipment shall be screened from view of public
right-of-way by an adequate parapet or other similar structure as required by the
Zoning Ordinance.
i) A written cost estimate for the landscape materials and installation shall be
submitted with the final plat. The landscape escrow shall be submitted prior to
release of the final plat mylars. All landscaped areas shall be irrigated with in -
ground irrigation as noted on the landscape plan. Any dead landscaping shall be
promptly replaced to maintain the integrity of the screening and landscape plan
approved by the City Council. Landscaping shall not be planted in street
boulevards. Landscaping greater than 3 feet in height shall not be placed within
the site visibility triangle as described in Zoning Ordinance Chapter 11-16-15.
j) Outlot B shall be deeded to the City with the final plat.
k) All signs shall comply with the Zoning Ordinance requirements for the 1-1 District.
A sign permit shall be issued by the Planning Department prior to the installation
of any signs.
1) The chain-link security fence shall be installed on the building side of the
landscaping away from the public right-of-way. Barbed wire or concertina wire
fencing is not permitted.
m) Snow storage shall not take place in required parking spaces. If there is not
adequate space to store snow on site, snow must be hauled from the site.
n) Site and building lighting shall be installed consistent with the approved lighting
plan and in compliance with Zoning Ordinance requirements.
o) The building permit plans and site plans must include outdoor trash enclosure
details that comply with Zoning Ordinance requirements. The trash enclosures
shall match the exterior materials of the principal buildings and shall include
maintenance free gates.
p) The maintenance wash bay shall be connected to City sanitary sewer.
2
ti 0416
q) A Sanitary Sewer Unit determination shall be submitted to the City in compliance
with Metropolitan Council Environmental Services requirements prior to the
issuance of a building permit.
r) The fuel depot must meet building and fire code requirements.
s) The developer shall contact the Federal Aviation Administration (FAA) at least 45
days prior to commencing building construction to determine if a permit is
required for any crane of similar construction equipment on the property.
4. Termination of Permit. The City may revoke the conditional use permit following
a public hearing for violation of the terms of the permit.
5. Lapse. If within one year of the issuance of this conditional use permit work
has not commenced, this permit shall lapse.
6. Criminal Penalty. Violation of the terms of this conditional use permit is a
criminal misdemeanor.
Dated: October 6, 2014
CITY OF LAKEVILLE
BY:
Matt Jttle, Mayor
BY: 1'44LIA;
Charlene Friedges, City erk
The following instrument was acknowledged before me this 61 day of October, 2014
by Matt Little, Mayor and by Charlene Friedges, City Clerk of the City of Lakeville, a
Minnesota municipal corporation, on behalf of the corporation.
PENNY BREVIG
NOTARY PUBLIC • MINNESOTA
My Commission Expires Jan. 31, 2015
DRAFTED BY:
City of Lakeville
20195 Holyoke Avenue
Lakeville, MN 55044
3
Notary P lic
Dakota County Surveyor’s Office
Western Service Center 14955 Galaxie Avenue Apple Valley, MN 55124
952.891 -7087 Fax 952.891 -7127 www.co.dakota.mn.us
March 23, 2020
City of Lakeville
20195 Holyoke Ave.
Lakeville, MN 55044
Re: FEDEX LAKEVILLE 2ND ADDITION
The Dakota County Plat Commission met on March 18, 2020, to consider the Preliminary Plat of the
above referenced plat. The plat is adjacent to CSAH 9 (Dodd Boulevard) and CSAH 70 (215th Street) and
is therefore subject to the Dakota County Contiguous Plat Ordinance.
The proposed site includes building additions to the existing FedEx buildings, which is a replat of Lot 1
and Outlot A, FEDEX LAKEVILLE. The right of way needs and the access restriction along CSAH 9 and
CSAH 70 have been met.
The Plat Commission has approved the preliminary and final plat and will recommend approval to the
County Board of Commissioners.
Traffic volumes on CSAH 9 and CSAH 70 are 6,000 and 13,000 ADT, respectively, and are anticipated to
be 11,000 and 20,000 ADT by the year 2030.
No work shall commence in the County right of way until a permit is obtained from the County
Transportation Department and no permit will be issued until the plat has been filed with the County
Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of
proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to
restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat
Commission highly recommends early contact with the Transportation Department to discuss the
permitting process which reviews the design and may require construction of highway improvements,
including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths,
medians, etc. Please contact Gordon McConnell regarding permitting questions at (952) 891-7115 or
Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070.
Sincerely,
Todd B. Tollefson
Secretary, Plat Commission
c: EXHIBIT P
City of Lakeville
Public Works – Engineering Division
Memorandum
To: Frank Dempsey, Associate Planner
From: Alex Jordan, Assistant City Engineer
McKenzie L. Cafferty, Environmental Resources Manager
John Hennen, Parks and Recreation Director
Copy: Zach Johnson, City Engineer
Jerilyn Erickson, Finance Director
Gene Abbott, Building Official
David Olson, Community and Economic Development Director
Daryl Morey, Planning Director
Date: April 25, 2020
Subject: FedEx Lakeville 2nd Addition
• Easement Vacation Review
• Preliminary Plat Review
• Final Plat Review
• Site Plan Review
• Grading and Erosion Control Plan Review
• Utility Plan Review
• Tree Preservation Plan
BBAACCKKGGRROOUUNNDD
Setzer Properties SMN has submitted a preliminary and final plat application named FedEx
Lakeville 2nd Addition. This is the second phase of the FedEx Lakeville preliminary plat that
was approved by the City Council at their October 6, 2014 meeting. FedEx has also submitted
site plans for expansion of the transload warehouse building, expansion of the vehicle
maintenance building, and expansion of the motor fuel facility and canopy on Lot 1, Block 1,
FedEx Lakeville 2nd Addition. The proposed development is located east of and adjacent to
Dodd Boulevard (CSAH 9), south of and adjacent to 215th Street (CSAH 70), north of and
adjacent to 217th Street and west of and adjacent to Humboldt Road. The parent parcels are
Outlot A and Lot 1, Block 1, FedEx Lakeville zoned I-1, Limited Industrial District.
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 22 OOFF 88
The final plat consists of one lot within one block.
The proposed development will be completed by:
Developer: Setzer Properties SMN
Engineer/Surveyor: Advanced Engineering Concepts, LLC/E.G. Rud & Sons, Inc.
SSIITTEE CCOONNDDIITTIIOONNSS
The site contains an existing FedEx office, warehouse, maintenance building, fuel station and
parking areas on Lot 1, Block 1, Fe dEx Lakeville. A series of privately owned and maintained
stormwater management and infiltration basins are located on Outlot A, FedEx Lakeville.
EEAASSEEMMEENNTT VVAACCAATTIIOONN
The parent parcels contain existing drainage and utility easements that will be vacated with
the final plat:
• All of the drainage and utility easements originally dedicated upon Lot 1, Block 1 and
Outlot A, FedEx Lakeville.
The following easement will remain on the parent parcels:
• 10-ft wide Trail, Drainage, Utility and Wall Easement on the north 10 feet of Lot 1, Block
1 and Outlot A, FedEx Lakeville per Document No 3065034.
The FedEx Lakeville 2nd Addition final plat must include the dedication of the necessary
easements to replace the underlying easements.
SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT
Dodd Boulevard (CSAH 9)
FedEx Lakeville 2nd Addition is located east of and adjacent to Dodd Boulevard, a minor arterial
County roadway as identified in the City’s Comprehensive Transportation Plan. Dodd
Boulevard adjacent to the site is constructed as a two-lane undivided rural roadway including
turn lanes at intersections.
Dakota County controls the right-of-way requirements and access locations along Dodd
Boulevard. No improvements are proposed along Dodd Boulevard. The right-of-way
requirements for Dodd Boulevard were satisfied with the FedEx Lakeville find plat.
215th Street (CSAH 70)
FedEx Lakeville 2nd Addition is located south of and adjacent to 215th Street, a principal arterial
County roadway as identified in the City’s Comprehensive Transportation Plan.
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 33 OOFF 88
Dakota County controls the right-of-way requirements and access locations along CSAH 70.
CSAH 70 adjacent to the development is constructed as a two-lane rural section roadway. The
City and County are reconstructing CSAH 70 adjacent to the plat as a four-lane divided urban
roadway (City Project 20-05). Construction is programmed to begin in June, 2020 and be
completed by June, 2022. The Developer granted to the County a 10-foot wide Trail,
Drainage, Utility and Wall Easement along the north boundary of the parent parcels with the
FedEx Lakeville final plat. This easement must remain with the final plat improvements to
facilitate the trail construction adjacent to the site with City Project 20-05.
217th Street
FedEx Lakeville 2nd Addition is located north of and adjacent to 217th Street, a minor collector
roadway as identified in the City’s Transportation Plan. 217th Street is constructed as a rural
section roadway to promote infiltration and stormwater treatment. 217th Street has an 80-foot
right-of-way with a 40-foot wide paved section and two-foot gravel shoulders. There are
dedicated right and left turn lanes at the intersection with Dodd Boulevard. 217th Street
provides access to the southern portion of First Park Lakeville and the FedEx site.
Humboldt Road
FedEx Lakeville 2nd Addition is located west of and adjacent to Humboldt Road, a minor collector
roadway as identified in the City’s Transportation Plan. Humboldt Road is constructed as a
rural section roadway to promote infiltration and stormwater treatment. Humboldt Road has
an 80-foot right-of-way with a 40-foot wide paved section and two-foot gravel shoulders.
Humboldt Road provides access to CSAH 70 for the FedEx site.
City Project 20-05 includes intersection modifications at the Humboldt Road and CSAH 70
intersection. The modifications include construction of center medians that will restrict access
onto CSAH 70 to right turns only (¾ directional access). Right and left turn movements will
still be maintained on CSAH 70 to Humboldt Road with the access modifications.
During the construction of the CSAH 70 improvements, access from Humboldt Road to CSAH
70 may be closed to construct the improvements to the south side of the roadway (identified
as Stage 2 in the project documents). Access to Dodd Boulevard from 217th Street will be
maintained at all times.
The Developer is required to coordinate all construction access for the FedEx site with Dakota
County’s contractor for the CSAH 70 improvement project.
CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS
Construction traffic access and egress for grading, utility, street and building construction for
FedEx Lakeville 2nd Addition is restricted to 217th Street via Dodd Boulevard.
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 44 OOFF 88
PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS
The Park Dedication fee has not been collected on Outlot A, FedEx Lakeville and must be paid
with the final plat. The Park Dedication Fee is calculated as follows:
12.87 acres x $4,558.00 = $58,661.46
Outlot A, FedEx Lakeville Area 2020 Park Dedication Rate Park Dedication Required
A 10-foot wide bituminous trail will be constructed along the south side of CSAH 70 with City
Project 20-05 adjacent to the parent parcels.
UUTTIILLIITTIIEESS
SSAANNIITTAARRYY SSEEWWEERR::
FedEx Lakeville 2nd Addition is located within sub-district SC-10160 of the South Creek
sanitary sewer district as identified in the City’s Comprehensive Sewer Plan. The wastewater
from the proposed site will be conveyed by City-owned sanitary sewer to the Farmington
interceptor and then to the Empire Wastewater Treatment Plant. The existing City-owned
downstream facilities are adequate to convey the wastewater generated by the proposed
development.
Development of the site includes extension of a privately owned and maintained sanitary sewer
service for the proposed building expansion.
The Sanitary Sewer Availability Charge has not been collected on Outlot A, FedEx Lakeville
and must be paid with the building permit, following the current MCES SAC unit
determination rate.
WWAATTEERRMMAAIINN::
8-inch privately owned and maintained watermain will be extended through the site from
existing private watermain to provide a looped system for the development.
No connections to the City’s public utility system are proposed with the development
improvements.
OOVVEERRHHEEAADD LLIINNEESS
Great River Energy (GRE) has an existing electric transmission line along CSAH 70. Impacts to
this facility are not anticipated or required with the development improvements.
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 55 OOFF 88
DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG
FedEx Lakeville 2nd Addition lies within sub-districts SC-067B (area in the northern section of
the site), SC-067A (the southern area of the site) of the South Creek District of the City’s
Comprehensive Water and Natural Resources Management Plan.
The existing stormwater management system for the parent parcels consists of wet
sedimentation and infiltration basins that are interconnected by an equalizer storm sewer.
The stormwater management system discharges north into the CSAH 70 storm sewer system
and is conveyed to South Creek.
The building and parking lot expansion will include the removal of the existing stormwater
management basins that will be replaced by a series of underground stormwater infiltration
chambers. A detailed hydrologic and hydraulic design and analysis must be prepared by the
Developer, submitted to the City for review and approval prior to City Council consideration
of the final plat.
The proposed underground chamber system will discharge to the southeast to a proposed
culvert and drainage swale that will be constructed with the CSAH 70 improvement project.
The downstream storm sewer and drainage improvements are proposed to be completed
with Phase 1 of the CSAH 70 Improvements in 2020. The Developer shall not modify the
outlet structure to discharge site runoff to this area until the City and County improvements
are completed, and the Developer has received written authorization from the City Engineer.
The Developer shall grant the City a temporary construction easement for the installation of
the downstream storm sewer with the final plat.
A National Pollution Discharge Elimination System General Stormwater Permit for
construction activity is required by the Minnesota Pollution Control Agency for areas
exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit
Coverage must be submitted to the City upon receipt from the MPCA.
SSTTOORRMM SSEEWWEERR
Development of FedEx Lakeville 2nd Addition includes the construction of a privately owned
and maintained storm sewer system.
The privately-owned and maintained storm sewer will be located within Lot 1, Block 1, FedEx
Lakeville 2nd Addition and will collect and convey stormwater runoff generated from within
the development to the underground chamber system and outlet to the City’s culvert under
Humboldt Road.
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 66 OOFF 88
The Trunk Storm Sewer Area Charge has not been collected on Outlot A, FedEx Lakeville and
shall be paid with the final plat and is calculated as follows:
560,423.00 s.f. x $0.250/s.f. = $140,105.75
Outlot A, FedEx Lakeville Area 2020 Industrial Area
Charge
Total
Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final
construction plans.
FFEEMMAA FFLLOOOODDPPLLAAIINN AANNAALLYYSSIISS
FedEx Lakeville 2nd Addition is shown on the Flood Insurance Rate Map (FIRM) as Zone X by
the Federal Emergency Management Agency (FEMA). Based on this designation, there are no
areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA.
WWEETTLLAANNDDSS
No wetlands have been identified in this development.
TTRREEEE PPRREESSEERRVVAATTIIOONN
No significant trees have been identified in this development.
EERROOSSIIOONN CCOONNTTRROOLL
The Developer is responsible for meeting all the requirements of the MPCA Construction
Permit. Additional erosion control measures may be required during construction as deemed
necessary by City staff. Any additional measures required shall be installed and maintained
by the Developer.
SECURITIES
The Developer shall provide a Letter of Credit as security for the Developer-installed
improvements relating to FedEx Lakeville 2nd Addition. Construction costs are based upon
estimates submitted by the Developer’s engineer on April 2, 2020.
CONSTRUCTION COSTS
Grading and Earthwork $ 1,724,000.00
Stormwater Chamber System 2,715,000.00
Erosion Control and Restoration 40,500.00
SUBTOTAL - CONSTRUCTION COSTS $ 4,479,500.00
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 77 OOFF 88
OTHER COSTS
Developer’s Design (3.0%) $ 134,385.00
Developer’s Construction Survey (2.5%) 111,987.50
City’s Legal Expense (0.5%) 22,397.50
City Construction Observation (5.0%) 223,975.00
Developer’s Record Drawing (0.5%) 22,397.50
Landscaping To be calculated with Final Plat
Lot Corners/Iron Monuments 100.00
SUBTOTAL - OTHER COSTS $515,242.50
TOTAL PROJECT SECURITY $ 4,994,724.50
The Developer shall post a security to ensure the final placement of iron monuments at
property corners with the final plat. The security is $100.00 per lot and outlot for a total of
$100.00. The City shall hold this security until the Developer’s Land Surveyor certifies that all
irons have been placed following site grading, street and utility construction.
CCAASSHH FFEEEESS
A cash fee for one-year of streetlight operating expenses for Lot 1, Block 1, FedEx Lakeville 2nd
Addition shall be paid with the final plat. The streetlight operating fee is based on industrial
development so as to provide a more comparable rate to the anticipated usage. The cash fee
is calculated as follows:
1489.43 f.f. x $0.2832/f.f./qtr. x 4 qtrs. = $1,687.23
217th Street and
Humboldt Avenue Frontage along
Outlot A, FedEx Lakeville
Streetlight Operating Fee Total
A cash fee for one-year of surface water management expenses for Lot 1, Block 1 shall be paid
with the final plat and is calculated as follows:
12.87 acres X 4.2 REU x $16.54/unit/qtr. x 4 qtrs. = $3,576.21
Area of Outlot A, FedEx Lakeville Residential Equivalent
Utility Factor
Surface Water Management Fee Total
A cash fee for the preparation of record construction drawings and for upgrading the City
base map shall be paid at the time of final plat approval and is calculated as follows:
1
x $90.00/unit
= $90.00
Lots/Outlots City Base Map Updating Fee Total
The Developer shall submit the final plat and construction drawings in an electronic format.
The electronic format shall be in either .dwg (AutoCAD) or .dxf format.
FFEEDDEEXX LLAAKKEEVVIILLLL EE 22NNDD AADDDDIITTII OONN –– PPRREELLIIMMIINNAARRYY AANNDD FFIINNAALL PPLLAATT
AAPPRRIILL 2255,, 22002200
PPAAGGEE 88 OOFF 88
The Developer shall also pay a cash fee for City Engineering Administration. The fee for City
Engineering Administration will be based on three percent (3.00%) of the estimated
construction cost, or $134,385.00.
CASH REQUIREMENTS
Park Dedication Fee $ 58,661.46
Trunk Storm Sewer Area Charge 140,105.75
Sanitary Sewer Availability Charge TBC w/ Building Permit
Streetlight Operating Fee 1,687.23
Environmental Resources Management Fee 3,576.21
City Base Map Updating Fee 90.00
City Engineering Administration (3.00%) 134,385.00
CASH REQUIREMENTS
$338,505.65
RREECCOOMMMMEENNDDAATTIIOONN
Engineering recommends approval of the FedEx Lakeville 2nd Addition easement vacation,
preliminary plat, final plat, grading plan, utility plan, erosion control plan, tree preservation
plan, and site plan subject to the requirements and stipulations of this report.