Loading...
HomeMy WebLinkAbout17359 Eagleview Dr SurveyENGINEERING REVIEWEDDate:__________________04/30/2020corlowsky*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION