Loading...
HomeMy WebLinkAboutItem 08 Date: Item No. KNOB HILL NORTH PRELIMINARY PLAT Proposed Action Staff recommends adoption of the following motion: Move to approve a resolution approving the Knob Hill North preliminary plat. Overview KJ Walk, Inc. has submitted a preliminary plat application for 36 single family lots and 42 detached townhome lots on 30 acres of land located west of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9). At its May 7, 2020 meeting, the Planning Commission held a public hearing to consider the preliminary plat. There was no public comment. The Planning Commission unanimously recommended approval of the application. The Parks, Recreation, and Natural Resources Committee unanimously recommended approval of the preliminary plat at their May 6, 2020 meeting. Primary Issue to Consider What is the timeline for the construction of 179th Street (future CSAH 9) to provide a connection between Flagstaff Avenue and Pilot Knob Road (CSAH 31)? After City Council approval of the Knob Hill North preliminary plat, the Developer intends to begin grading the site, which will include fill from the 179th Street right of way. Construction of 179th Street will occur this summer, with paving expected to take place this fall. The ultimate plan for 179th Street is for the street to continue east and connect to State Highway 3. Supporting Information • Preliminary plat resolution • May 7, 2020 Draft Planning Commission meeting minutes • May 6, 2020 Draft Parks, Recreation and Natural Resources Committee meeting minutes • April 30, 2020 Planning report • April 29, 2020 Engineering report Financial Impact: $ n/a Budgeted: Y☐ N☐ Source: Related Documents: (CIP, ERP, etc.): Subdivision and Zoning Ordinances Envision Lakeville Community Values: A Home for All Ages and Stages of Life Report Completed by: Kris Jenson, Associate Planner May 18, 2020 CITY OF LAKEVILLE DAKOTA COUNTY, MINNESOTA RESOLUTION NO. 20-_____ RESOLUTION APPROVING THE PRELIMINARY PLAT OF KNOB HILL NORTH WHEREAS, KJ Walk, Inc. has requested approval of the preliminary plat of 36 single family lots and 42 detached townhome lots to be known as KNOB HILL NORTH, legally described as follows: Outlot E, KNOB HILL OF LAKEVILLE WHEREAS, the Planning Commission held a public hearing at their May 7, 2020 meeting, preceded by notice as required by the Subdivision Ordinance; and WHEREAS, the Planning Commission unanimously recommended approval of the preliminary plat; and WHEREAS, the preliminary plat is acceptable to the City; NOW THEREFORE BE IT RESOLVED by the Lakeville City Council: KNOB HILL NORTH preliminary plat is approved subject to the following conditions: 1. Implementation of the recommendations listed in the April 30, 2020 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The developer shall construct five foot wide concrete sidewalks along one side of all streets, except the cul-de-sac. 4. Outlots A and B shall be deeded to the City with the final plat. 5. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting 179th Street must install sod to the trail and a $1,000 per lot security will be required with the building permit. 6. A fence permit is required prior to the installation of the proposed privacy fence along the north plat boundary. The fence located on Lot 49, Block 1 must be maintained by the HOA. The placement of the fence on Lots 1-16, Block 1 should be done such that future homeowners will have to ability to replace or remove the fence on their lot without affecting the fence on adjacent lots. 2 7. If a subdivision monument sign is proposed for the development, it must be maintenance free and located on private property. A sign permit is required prior to installation of the sign. ADOPTED by the Lakeville City Council this 18th day of May 2020. CITY OF LAKEVILLE Douglas P. Anderson, Mayor ATTEST: _______________________ Charlene Friedges, City Clerk Drafted By: City of Lakeville 20195 Holyoke Avenue Lakeville, MN 55044 Planning Commission Meeting Minutes, May 7, 2020 Page 7 5. Any roof-mounted mechanical equipment shall be screened from view of public right-of-way by an adequate parapet or other similar structure as required by the Zoning Ordinance. 6. Snow storage shall not take place in required parking spaces. If there is not adequate space to store snow on site, snow must be hauled from the site. 7. Site lighting fixtures shall be consistent with the existing fixtures on the property. The exterior site and building lighting plan shall be revised to identify proposed exterior lighting not to exceed one foot-candle at the property line. 8. The building permit plans and site plans must include outdoor trash enclosure details that comply with Zoning Ordinance requirements. The trash enclosures shall match the exterior material sof the principal buildings and shall include maintenance free gates. 9, The developer shall verify with the Federal Aviation Administration (FAA) prior to commencing building construction to determine if a permit is required for any crane of similar construction equipment on the property. 10. The stipulations of CUP 14-06 shall remain in full force and effect. Ayes: Majorowicz, Lillehei, Kaluza, Witte, Drotning, Zimmer, Swenson Nays: 0 8. Knob Hill North Chair Kaluza opened the public hearing to consider the application of KJ Walk, Inc. for a preliminary plat of 36 single family residential lots and 42 detached townhome lots to be known as Knob Hill North, located west of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9). Warren Israelson, owner of KJ Walk, presented a brief overview of their request. He indicated that this plat is an extension of what they started last year. There are 34 homes already going up in the previous plat. He stated that the townhomes will be slab on grade and the single family homes will be full basement walkouts. Associate Planner Kris Jenson presented the planning report. Ms. Jenson stated that Knob Hill North will consist of 36 single family lots and 42 detached townhome lots on one parcel, Outlot E, Knob Hill of Lakeville. She indicated that the parcel is currently zoned RM-1, Medium Density Residential District. The Zoning Map update proposes to rezone the portion of the preliminary plat that is west of Eventide Way to RS-4, Single Family Residential District. The detached townhome lots will remain zoned RM-1. All of the single family lots meet the lot area and width requirements of the RS-4 District. The proposed house pads for Knob Hill North indicated that all 36 single family lots have adequate building pad areas that meet setback requirements for principal structures. The proposed townhome lots have sufficient area to accommodate detached units. The minimum lot area exceeds the minimum lot area per unit requirements of the RM- Planning Commission Meeting Minutes, May 7, 2020 Page 8 1 District. The proposed building pads indicated that all 42 detached townhomes have adequate building pad areas that meet setback requirements. Ms. Jenson explained the exterior material requirements, which are listed in the April 30, 2020 planning report, along with the floor area, garage area and landscaping requirements. There are two outlots in the Knob Hill North preliminary plat. Outlot A will be used for future park space and Outlot B which consists of a stormwater management basin, will be deeded to the City with the final plat. Ms. Jenson indicated that Knob Hill North will be developed in two phases. The detached townhomes will be the first phase and the single family lots will be the second phase of development. Ms. Jenson reviewed the proposed streets with the Knob Hill North preliminary plat. Detailed information is outlined in the Engineering Division memo dated April 29, 2020. All streets meet the minimum width and design requirements of the Subdivision Ordinance. Ms. Jenson explained the residential buffer yard requirements for two of the single family home lots that abut 179th Street. Ms. Jenson indicated that the developer is proposing to erect a six-foot tall white vinyl privacy fence along the north plat boundary, at the rear of Lots 1-16, Block 16 and the north boundary of Lot 49, Block 1. Planning Department and Engineering staff recommends approval of the Knob Hill North preliminary plat, subject to the seven stipulations listed in the April 30, 2020 planning report. Chair Kaluza opened the hearing to the public for comment. There were no comments from the audience. Motion was made by Majorowicz, seconded by Witte to close the public hearing at 6:58 p.m. Ayes: Lillehei, Kaluza, Witte, Drotning, Zimmer, Swenson, Majorowicz Nays: 0 Chair Kaluza asked for comments from the Planning Commission. Discussion points included: • Commissioner Swenson stated that this plat fits in with what was done in previous years in this area. He indicated how pleased he was to see new homes being constructed and progressing out there. It’s another piece of the puzzle. He is in support of this project. Planning Commission Meeting Minutes, May 7, 2020 Page 9 • Commissioner Drotning agreed. He stated that it is fun to see the work that was done previously and see it continue. Extending 179th Street will be good for everyone. Motion was made by Lillehei, seconded by Drotning to recommend to City Council approval of the Knob Hill North preliminary plat of 36 single family residential lots and 42 detached townhome lots located west of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9): 1. Implementation of the recommendations listed in the April 29, 2020 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The developer shall construct five foot wide concrete sidewalks along one sid of all streets, except the cul-de-sac. 4. Outlots A and B shall be deeded to the City with the final plat. 5. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting 179th Street must install sod to the trail and a $1,000 per lot security will be required with the building permit. 6. A fence permit is required prior to the installation of the proposed privacy fence along the north plat boundary. The fence located on Lot 49, Block 1 must be maintained by the HOA. The placement of the fence on Lots 1-16, Block 1 should be done such that future homeowners will have the ability to replace or remove the fence on their lot without affecting the fence on adjacent lots. 7. If a subdivision monument sign is proposed for the development, it must be maintenance free and located on private property. A sign permit is required prior to installation of the sign. Ayes: Lillehei, Kaluza, Witte, Drotning, Zimmer, Swenson, Majorowicz Nays: 0 9. Launch Park 2nd Addition Chair Kaluza opened the public hearing to consider the application of Airlake Development, Inc. for a preliminary plat of one industrial lot and two outlots to be known as Launch Park 2nd Addition located east of Cedar Avenue (CSAH 23) and north of 222nd Street. Dan Regan from Airlake Development, Inc. presented a brief overview of their request. He indicated that Jim Connelly from APPRO Development and Brian Wurdeman from Kimley Horn were also present to answer any questions the Planning Commission. Mr. Regan stated that this second phase of Launch Park is a continuation of Launch Park industrial park conceptually planned as part of the AUAR approved in 2018 which will include a 150,000 square foot institutional quality building with a small office component in it, dock functionality and vehicle parking for the tenants that will occupy this building. Because this plat is in the watershed district, he indicted that they are Parks, Recreation & Natural Resources Committee Meeting Minutes, May 6, 2020 Page 2 Parks, Recreation & Natural Resources Committee Meeting Minutes, May 6, 2020 Page 3 1 | Page City of Lakeville Planning Department Memorandum To: Planning Commission From: Kris Jenson, Associate Planner Date: April 30, 2020 Subject: Packet Material for the May 7, 2020 Planning Commission Meeting Agenda Item: Knob Hill North preliminary plat Action Deadline: May 28, 2020 BACKGROUND KJ Walk, Inc. has applied for a preliminary plat to allow the development of 36 single family lots and 42 detached townhome lots on approximately 30 acres to be known as Knob Hill North. The Knob Hill North preliminary plat is located west of Pilot Knob Road (CSAH 31) and north of 179th Street (future CSAH 9). The Knob Hill North preliminary plat plans have been distributed to Engineering Division and Parks and Recreation Department staff, and the Parks, Recreation and Natural Resources Committee. EXHIBITS A – Aerial Photo Map B – Zoning Map C - Cover Sheet/Phasing Plan D – Preliminary Plat West E – Preliminary Plat East F – Preliminary townhome site plan G – Preliminary Grading (Overall) H – Preliminary Grading West I – Preliminary Grading East J – Erosion Control West K – Erosion Control East L – Landscape Plan M – Preliminary Utilities West N – Preliminary Utilities East O - Plat Commission Letter 2 | Page PLANNING ANALYSIS PRELIMINARY PLAT Existing Conditions. The development site consists of one parcel, Outlot E, Knob Hill of Lakeville. The site has been used for agriculture (Exhibit A). Consistency with the Comprehensive Plan. The Knob Hill North property is located in Planning District 3 of the 2040 Comprehensive Plan. Planning District 3 guides the subject property for low/medium density residential where city sewer is available. MUSA. The Knob Hill North preliminary plat area is located within the current MUSA. Zoning. The parcel is currently zoned RM-1, Medium Density Residential District. The Zoning Map update proposes to rezone the portion of the preliminary plat that is west of Eventide Way to RS-4, Single Family Residential District. The detached townhome lots will remain zoned RM-1. (Exhibit B) Adjacent Land Uses. Adjacent land uses and zoning are as follows: North – Country View Manufactured Home Park (RSMH District) East – Pilot Knob Road, Single Family Homes (RM-1 District) South – 179th Street (Future CSAH 9), Single Family Homes (RS-4 District) West – Single Family Homes (RS-3 District) Consistency with the Capital Improvement Plan (CIP). City streets, sanitary sewer and water improvements for the area of Knob Hill North will be financed and constructed by the developer. The development costs associated with the Knob Hill North development are not programmed in the 2020–2024 CIP. Premature Subdivision Criteria. A preliminary plat may be deemed premature if any of the criteria listed in Chapter 10-2-4-1 of the Subdivision Ordinance exist. Eligible criteria pertain to a lack of adequate: drainage, water, streets, sanitary sewer, and public service capacity (police and fire protection). The other pertinent criteria pertain to inconsistencies with the City Comprehensive Land Use and Capital Improvement Plans (discussed above). Staff review of the Knob Hill North preliminary plat against these criteria finds that it is not a premature subdivision. Density/Average Lot Size. The Knob Hill North preliminary plat consists of 36 single family lots and 42 detached townhome lots on 29.8 acres. This results in a gross overall density of 2.62 units per acre. Excluding the future park and stormwater ponding outlots, the net density is 3.14 units per acre. SINGLE FAMILY LOT REQUIREMENTS Lots/Blocks. The following minimum single-family lot size requirements of the RS-4, Single Family Residential District pertain to the Knob Hill North preliminary plat: Lot Area (Interior) Lot Area (Corner) Lot Width (Interior) Lot Width (Corner) Lot Width (Abutting 179th St) RS-4 8,400 s.f. 10,200 s.f. 70 feet 85 feet 95 feet 3 | Page Single family lot sizes within the Knob Hill North preliminary plat range from 8,400 square feet to 15,953 square feet in area. All of the single family lots meet the lot area and width requirements of the RS-4 District. Setbacks. The following minimum requirements for single family building setbacks in the RS-4 District pertain to the Knob Hill North preliminary plat: Front Yard Side Yard (Interior) Side Yard (Corner) Side Yard (buffer) Rear Yard RS-4 20 feet (house) 25 feet (garage) 7 feet 20 feet 30 feet 30 feet The proposed house pads shown on the Knob Hill North grading, drainage and erosion control plan indicate that all 36 single-family lots have adequate building pad areas that meet setback requirements for principal structures. DETACHED TOWNHOME DEVELOPMENT STANDARDS Lot Requirements. The proposed unit lots shown on the Knob Hill North preliminary plat have sufficient area to accommodate detached units. A homeowner’s association will be required to be established for ownership and maintenance of Lot 49, Block 1 and Lot 12, Block 4. The RM-1 District requires at least 5,000 square feet per unit. The Knob Hill North preliminary plat has an average of 10,494 square feet per unit for the detached townhomes area, which exceeds the minimum lot area per unit requirements of the RM-1 District. Setbacks. The following minimum requirements for detached townhome building setbacks in the RM-1 District pertain to the Knob Hill North preliminary plat: Base Lot Between Buildings (Detached Units) Front Yard (to ROW) RM-1 30 feet 14 feet 20 feet (front) 25 feet (garage) The proposed building pads shown on the Knob Hill North grading, drainage and erosion control plan indicate that all 42 detached townhomes have adequate building pad areas that meet setback requirements. Exterior Materials. Each townhouse unit must meet the requirements of Section 11- 58-21.C.4, which requires that a minimum of 25% of the area of each elevation of the unit must have an exterior finish of brick, stucco, and/or natural or artificial stone. Except for brick, stucco, and/or natural or artificial stone, no single elevation may have 4 | Page more than 75% of one type of finish or have more than 60% of all elevations of one type of finish. The City has deemed the use of cement fiberboard material as satisfying the minimum masonry material requirement and is therefore also allowed to exceed the maximum area limit for non-masonry materials. Floor Area. The developer must submit dimensioned floor plans for the detached townhome units to verify compliance with the minimum requirements for above grade floor area established by Section 11-17-13.D of the Zoning Ordinance. Garage Area. The detached townhome units are proposed to be slab on grade so the minimum area of each garage must be at least 540 square feet. Each garage must have a minimum interior width of 20 feet. Landscaping. Landscaping plans for required foundation plantings around the detached townhome units will be required with the final plat. The Developer must also provide information to demonstrate conformance with the requirements of Section 11-58-21.K. Outlots. There are two outlots totaling 6.84 acres in the Knob Hill North preliminary plat. The use of the proposed outlots will be as follows: Outlot A – 4.52 acre outlot for future park space. Outlot B – 2.32 acre outlot consisting of a stormwater management basin that will be deeded to the City with the final plat. Phasing. Knob Hill North is proposed to be developed in two phases. The detached townhome units will be the first phase of development with the single family lots being the second phase of development. The expected phasing plan is shown on Exhibit C. Streets. The following is a summary of streets proposed with the Knob Hill North preliminary plat. Additional detailed information is outlined in the Engineering Division memorandum dated April 29, 2020. Pilot Knob Road (CSAH 31) – Pilot Knob Road is east of and adjacent to the property and is classified as a minor arterial in the Comprehensive Transportation Plan. Right of way for Pilot Knob Road adjacent to the plat was dedicated with the Knob Hill of Lakeville plat. No additional right of way is required. 179th Street (future CSAH 9) – 179th Street is a two-lane minor arterial street constructed from Eventide Way to Pilot Knob Road. Right of way for the portion west of Eventide Way to the west was dedicated with the Knob Hill of Lakeville plat and no additional right of way is required to be dedicated. 178th Street – 178th Street will be a residential street constructed within a 60-foot right- of-way and a 32 foot wide street. The street will connect with the existing 178th Street at the west plat boundary and end at 179th Street. A five foot wide concrete sidewalk will be constructed along one side of the street. Everest Avenue – Everest Avenue will be a residential street constructed within a 60- foot-wide right-of-way and a 32 foot wide street with a five foot wide concrete 5 | Page sidewalk along the south side of the street, between 178th Street and Euclid Avenue. East of Euclid Avenue, Everest Avenue will end in a permanent cul-de-sac. Euclid Avenue – Euclid Avenue will be a residential street constructed within a 60 foot wide right-of-way and a 32 foot wide street with a five foot wide concrete sidewalk along the west side of the street. It will provide a right-in right-out access to 179th Street. Evershed Way – Evershed Way will be a residential street constructed within a 60 foot wide right-of-way and a 32 foot wide street with a five foot wide concrete sidewalk along the east side of the street. It will provide a right-in right-out access to 179th Street. All streets meet the minimum width and design requirements of the Subdivision Ordinance. Sidewalks/Trails. The developer will construct five-foot-wide concrete sidewalks along one side of all streets in the development, except the cul de sac. The City’s 2015 Parks, Trail and Open Space Plan identifies bituminous trails along 179th Street and plans for 10 foot wide trails to be constructed on both sides of 179th Street were approved with the Knob Hill of Lakeville final plat. Grading, Drainage, Erosion Control, and Utilities. Proposed grading, drainage, erosion control, and utilities for the Knob Hill North preliminary plat is shown on the grading, drainage and erosion control and utility plans. All existing and new local utilities shall be placed underground. Grading, drainage, erosion control, and utilities details are outlined in the April 29, 2020 engineering report prepared by Logan Vlasaty, Civil Engineer and Mac Cafferty, Environmental Resources Manager. The Engineering Division recommends approval of the preliminary plat. Tree Preservation. There are no significant trees located within the Knob Hill North preliminary plat boundary. Wetlands. There are no wetlands within the Knob Hill North preliminary plat boundary. Residential Buffer Yard Requirements. Two single family home lots abut 179th Street and require increased buffer yard lot widths and side yard setbacks in the Knob Hill North preliminary plat. 179th Street is classified as a future minor arterial in the Comprehensive Transportation Plan. The buffer yard screening must provide an effective minimal visual screen to a height of 10 feet. The landscape plan includes the installation of 13 coniferous and overstory trees on a two foot berm along the 179th Street buffer yard areas. (Exhibit L) The lots abutting 179th Street must install sod to the trail. A $1,000/lot security will be required with the building permit. Lot 49, Block 1 and Lot 12, Block 4, adjacent to Pilot Knob Road and 179th Street, include the planting of 100 coniferous and overstory trees on a two-foot berm to provide a landscape buffer to the detached townhome units. Fencing. The Developer is proposing to erect a six-foot tall white vinyl privacy fence along the north plat boundary, at the rear of Lots 1-16, Block 16 and the north 6 | Page boundary of Lot 49, Block 1. A fence permit is required prior to the installation of the fence. The fence located on Lot 49, Block 1 must be maintained by the HOA. The placement of the fence on Lots 1-16, Block 1 should be done such that future homeowners will have to ability to replace or remove the fence on their property without affecting the fence on adjacent parcels. Park Dedication. Park dedication will be satisfied through land dedication and a cash contribution. The Autumn Meadows Third Addition plat dedicated 2.87 acres of land for park purposes north of 179th Street, along its east plat boundary. The Knob Hill North preliminary plat provides a 4.52 acre outlot along its west plat boundary, to be deeded to the city for park purposes. If there is any additional park dedication requirement after Outlot A is deeded to the City, it will be satisfied by cash contribution. The Parks, Recreation and Natural Resources Committee will review the preliminary plat at their May 6, 2020 meeting. Their comments will be forwarded to the Planning Commission at the public hearing. Signs. No subdivision identification monument signs are proposed with the Knob Hill North preliminary plat. According to the developer, if a subdivision identification monument sign is planned it will be a maintenance-free boulder and will be located on private property. Plat Commission. The Dakota County Plat Commission reviewed and approved the preliminary plat at their February 4, 2020 meeting. The Plat Commission letter is included as Exhibit O. RECOMMENDATION Planning Department staff recommends approval of the Knob Hill North preliminary plat, subject to the following stipulations: 1. Implementation of the recommendations listed in the April 29, 2020 engineering report. 2. Park dedication shall be satisfied with a combination of land dedication and cash contribution paid with the final plat for each development phase. 3. The developer shall construct five foot wide concrete sidewalks along one side of all streets, except the cul-de-sac. 4. Outlots A and B shall be deeded to the City with the final plat. 5. Buffer yard landscaping shall be installed according to the approved landscape plan. A security for the buffer yard landscaping shall be submitted with the final plat. The lots abutting 179th Street must install sod to the trail and a $1,000 per lot security will be required with the building permit. 6. A fence permit is required prior to the installation of the proposed privacy fence along the north plat boundary. The fence located on Lot 49, Block 1 must be maintained by the HOA. The placement of the fence on Lots 1-16, Block 1 should be done such that future homeowners will have to ability to replace or remove the fence on their lot without affecting the fence on adjacent lots. 7 | Page 7. If a subdivision monument sign is proposed for the development, it must be maintenance free and located on private property. A sign permit is required prior to installation of the sign. ± Knob Hill North Preliminary Plat area PILOTKNOBROAD(CSAH31)CITY OF FARMINGTON 180TH ST 177TH ST177TH ST 1 7 9 T H S T 1 78TH ST FIREBIRD CT E V E N I N G L N UPPER 179TH ST City of LakevilleLocation MapKnob Hill NorthPreliminary PlatEXHIBIT A !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! ± RSMH RS-4* RM-1 RM-1 P/OS City of LakevilleZoning Map Knob Hill North Preliminary PlatEXHIBIT BPILOT KNOB RD (CSAH 31)1 7 9 T H S T (F U T U R E C S A H 9 ) Kn ob H ill North plat area RS-4 RS-4 RS-3 RS-3 RM-1 RM-1 * This area is currently zoned RM-1 but is proposed to be rezoned to RS-4 with the Zoning Map update. For ReviewApril 22, 2020I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate:01/07/19Revision:OriginalRegistration #: 51362SHEET 1 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg0100 200 300OWNER / DEVELOPER / DESIGNER:KJ Walk, Inc.Luke Israelson, PEReg #: 513626001 Egan Drive, Suite 100Savage, MN 55378(952) 226-3200luke@kjwalk.comwarren@kjwalk.comKNOB HILL NORTHSHEET INDEX1 Cover2-3 Preliminary Plat4 Site Plan5-7 Preliminary Grading8-9 Erosion Control10 SWPPP11 Landscaping12-13 Preliminary Utilities LAST SAVED: April 22, 2020Lakeville, MNLOT DATA:Single Family (36 lots)70' wide / 8400 SFDetached Town Home (42 lots)40' wide / 2800 SF50' wide / 3500 SF14' separation between lotsDETACHED TOWNHOME SETBACKSROW Setback20' House25' GarageBase lot Setback30' House20' Patio/Deck179TH and Pilot Knob Setback50' House30' Patio/DeckPHASE 1PHASE 2Preliminary Plat SetCoverLegendExisting watermainProposed watermainExisting sanitaryProposed sanitaryExisting stormProposed stormExisting hydrantProposed hydrantExisting gate valveProposed gate valveExisting manholeProposed manholeProposed catchbasinSilt fence5' SidewalkBituminous pathExisting treeGOPHER STATE ONE CALL: 651.454.0002 - CALL 48 HRS BEFORE EXCAVATIONContactsDeveloper/ KJ Walk, Inc.Luke IsraelsonEngineer/ 6001 Egan Drive, Ste 100 952.826.9068Contractor Savage, MN 55378CityCity of LakevilleZachary Johnson20195 Holyoke Avenue 952.985.4400Lakeville, MN 55044Charter 16900 Cedar Ave. South Tyler NelsonCommunications Rosemount, MN 55068 651.318.8975Dakota Electric 4300 220th Street West Rick SiebenalerFarmington, MN 55024 651.463.6373Frontier 14450 Burnhaven Drive James LancasterCommunications Burnsville, MN 55306 952.435.4661MN Energy 2665 145th Street West Alan BraithResources Corp. PO Box 455651.322.8932Rosemount, MN 5506802/11/19 Revised01/28/20 Revised04/15/2020 Revised04/22/2020 Revised Street NamesEXHIBIT C I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 2 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetPreliminary Plat (West)5'7'10'30'25'10'ROWTYPICAL LOTSETBACKS AND EASEMENTSROW20'HOUSE SETBACK GARAGE SETBACK20'10'10'30'25'10'20'HOUSE SETBACK GARAGE SETBACK ROWSITE DATATOTAL SITE AREA29.807 AC.NUMBER OF SINGLE FAMILY LOTS36 LOTSNUMBER OF DETACHED TOWNHOME LOTS 42 LOTSLOT AREA18.065 AC.RIGHT OF WAY AREA (LOCAL STREET)4.900 AC.OUTLOT AREA (OUTLOT A-B)6.842 AC.UNIT DENSITYGROSS2.62 UNITS PER AC.NET4.32 UNITS PER AC.SINGLE FAMILY LOT REQUIREMENTS (RS-4)MIN. LOT AREA - INTERIOR LOTS8,400 S.F.MIN. LOT WIDTH AT SETBACK - INTERIOR LOTS 70 FEETMIN. LOT AREA - CORNER LOTS10,200 S.F.MIN. LOT WIDTH AT SETBACK - CORNER LOTS 85 FEETMIN. LOT WIDTH AT SETBACK - CORNERLOTS ABUTTING 179TH ST W. 110 FEETMIN. LOT DEPTH - LOTSABUTTING 179TH ST W. 150 FEETDETACHED TOWNHOME MINIMUM SETBACKS (RM-1)ROW SETBACKS20' HOUSE25' GARAGEBASE LOT SETBACKS30' HOUSE20' PATIO/DECK179TH AND PILOT KNOB SETBACKS50' HOUSE30' PATIO/DECK LAST SAVED: April 22, 2020Lakeville, MNROWTYPICAL DETACHED TOWNHOME LOTSETBACKS AND EASEMENTSROW20'10'10'30'25'10'ROW14'20'DECK/PATIOSETBACKD&U EASEMENTBUILDING SETBACK5'7'01/07/19 OriginalRevised02/11/1950'70'40'70'01/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT D I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 3 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetPreliminary Plat (East) LAST SAVED: April 22, 2020Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 RevisedLegendOpen Space04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT E I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 4 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetSite Plan LAST SAVED: April 22, 2020Lakeville, MN01/07/19 OriginalRevised02/11/19D&U EASEMENTBUILDING SETBACKROWTYPICAL DETACHED TOWNHOME LOTSETBACKS AND EASEMENTSROW20'10'10'30'25'10'ROW14'20'DECK/PATIOSETBACK50'70'40'70'01/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT F I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 5 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwgPreliminary Plat SetPreliminary Grading LAST SAVED: April 22, 20200100 200 300Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHBIIT G I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 6 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwgPreliminary Plat SetPreliminary Grading (NW) LAST SAVED: April 22, 2020050100 150Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT H I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 7 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwgPreliminary Plat SetPreliminary Grading (NE) LAST SAVED: April 22, 2020050100 150Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT I I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 8 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetErosion Control (West)Silt Fence to be installed along perimeter ofconstruction area prior to the start of work.CB & DROP IN INLET PROTECTORSSEED & BLANKETLEGENDRIP RAPSILT FENCENOTES:MAXIMUM ALLOWABLE SLOPE 3:1PONDS MAY BE USED AS TEMPORARY SEDIMENTATIONBASINS DURING CONSTRUCTION, IF A POND IS USED AS ATEMP. SED. BASIN IT MUST BE CLEANED OUT PRIOR TOBEING PUT INTO SERVICE.DRAINAGE TO THE TEMPORARY SEDIMENTATION BASINSMUST BE MAINTAINED THROUGHOUT THE CONSTRUCTIONPROCESS.- MN DOT MIX 250(70LBS/AC) USED IN RIGHT OF WAY- MN DOT MIX 325(84LBS/AC) USED ON PONDS BELOW HWL- MN DOT MIX 328(88LBS/AC) USED ON PONDS ABOVE HWLSTOCKPILES TO BE STABILIZED IF NOT UTILIZED FOR MORETHAN 7 DAYS. LAST SAVED: April 22, 2020Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHBIIT J I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 9 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetErosion Control (East)Silt Fence to be installed along perimeter ofconstruction area prior to the start of work.CB & DROP IN INLET PROTECTORSSEED & BLANKETLEGENDRIP RAPSILT FENCE LAST SAVED: April 22, 2020NOTES:MAXIMUM ALLOWABLE SLOPE 3:1PONDS MAY BE USED AS TEMPORARY SEDIMENTATIONBASINS DURING CONSTRUCTION, IF A POND IS USED AS ATEMP. SED. BASIN IT MUST BE CLEANED OUT PRIOR TOBEING PUT INTO SERVICE.DRAINAGE TO THE TEMPORARY SEDIMENTATION BASINSMUST BE MAINTAINED THROUGHOUT THE CONSTRUCTIONPROCESS.- MN DOT MIX 250(70LBS/AC) USED IN RIGHT OF WAY- MN DOT MIX 325(84LBS/AC) USED ON PONDS BELOW HWL- MN DOT MIX 328(88LBS/AC) USED ON PONDS ABOVE HWLSTOCKPILES TO BE STABILIZED IF NOT UTILIZED FOR MORETHAN 7 DAYS.Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT K I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 11 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwgPreliminary Plat SetLandscaping Plan0100 200 300 LAST SAVED: April 22, 20206' WHITE VINYL PRIVACY FENCE ON NORTH PROPERTY LINE6' WHITE VINYL PRIVACY FENCE ON NORTH PROPERTY LINELakeville, MNSpruce TreesLEGENDNOTES:* TREES MINIMUM 5' FROM PROPERTY LINE* TREES STAGGERED WITH 15' SPACING 1/3 TREE HEIGHT ROOT CROWN ATFINISH GRADE,OR 1-2" ABOVE GRADEFINISH GRADETILLED OR BROKEN UPSOIL MIN 12" DEEP2" SETTLED LAYER OF MULCH2X WIDTH OF ROOTBALLTREE HEIGHT IS MEASUREDFROM THE TOP OF THE ROOTBALL TO THE BOTTOM OFTHE LEADERID#COMMON NAMESIZE#BHS BLACK HILLS SPUCE 8'-0" 61ATARBORVITAE"TECHNY"8'-0" 53ALTAMARACK"AMERICAN LARCH"8'-0" 12RB RIVER BIRCH2 1/2"21ASBAUTUMN SPLENDERBUCKEY2 1/2"3SWO SWAMP WHITE OAK2 1/2"4HB HACKBERRY2 1/2"3HL HONEY LOCUST2 1/2"5KCEKENTUCKYCOFFEETREE"ESPRESSO"2 1/2"6TOTAL1681/3 TREE HEIGHT ROOT CROWN ATFINISH GRADE,OR 1-2" ABOVE GRADEFINISH GRADETILLED OR BROKEN UPSOIL MIN 12" DEEP2" SETTLED LAYER OF MULCH2X WIDTH OF ROOTBALLDeciduous Trees4-BHS3-AT4-BHS3-AT4-BHS3-AT2-BHS1-AT1-HL1- KCE1-HL4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT4-BHS3-AT2-BHS1-AT1-BHS1-AT1-KCE1-ASB1-ASB1-ASB2-BHS1-AT2-BHS1-AT1-KCE1-HL1-KCE1-HL1-KCE1-HL1-KCELOW GROWPRAIRIE GRASS6' WHITE VINYL PRIVACY FENCETREE5:1 SLOPE MAX5:1 SLOPE MAX6" - 50% BLACK TURF GROWING MEDIUMNATURAL SAND01/07/19 OriginalRevised02/11/1901/28/20 RevisedPrivacy FenceTREE3-AL3-AL3-AL3-AL3-AT3-AT3-AT4-SWO3-RB3-RB1-HB3-RB3-RB3-RB1-HB3-RB3-RB1-HB1'PROPERTY LINECONCRETEPOST FOOTING(12" DIA.)04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT L I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 12 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetPreliminary Utilities (West) LAST SAVED: April 22, 2020Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT M I hereby certify that this plan was prepared by me,or under my direct supervision, and that I am aduly registered engineer under the laws of theState of Minnesota.Luke Warren Israelson6001 Egan Drive, Ste 100, Savage, MN 55378Phone: 952.226.3200 Web: www.kjwalk.comDate: Revision:Registration #: 51362SHEET 13 of 13Date: 4/22/2020FILE PATH: G:\My Drive\Work Files\Lakeville Projects\Knob Hill\Engineering\CAD\DWGs\KHN SFDTH.dwg060120 180Preliminary Plat SetPreliminary Utilities (East)Lakeville, MN01/07/19 OriginalRevised02/11/1901/28/20 Revised04/15/2020 RevisedFor ReviewApril 22, 202004/22/2020 Revised Street NamesEXHIBIT N Dakota County Surveyor’s Office Western Service Center  14955 Galaxie Avenue  Apple Valley, MN 55124 952.891-7087  Fax 952.891-7127  www.co.dakota.mn.us February 6, 2019 City of Lakeville 20195 Holyoke Ave. Lakeville, MN 55044 Re: KNOB HILL NORTH The Dakota County Plat Commission met on February 4, 2019, to consider the preliminary plat of the above referenced plat. The plat is adjacent to County State Aid Highway 31 (Pilot Knob Rd.) and future County Road 179th St. W., and is therefore subject to the Dakota County Contiguous Plat Ordinance. This is a replat of OUTLOT E, KNOB HILL OF LAKEVILLE. Restricted access symbols should be shown along all of CSAH 31 (shown as Lot 54 on the proposed plat). Restricted access should be shown along all of 179th Street (future County Road) except for the three access openings as shown on the proposed plat. A quit claim deed to Dakota County for restricted is required to be recorded with the plat mylars. The Plat Commission has approved the preliminary plat provided that the described conditions are met, and reviewed the final plat and recommends approval to the County Board of Commissioners provided that the described conditions are met. Traffic volumes on CASH 31 are 28,000 ADT and are anticipated to be 39,000 ADT by the year 2030. These traffic volumes indicate that current Minnesota noise standards for residential units could be exceeded for the proposed plat. Residential developments along County highways commonly result in noise complaints. In order for noise levels from the highway to meet acceptable levels for adjacent residential units, substantial building setbacks, buffer areas, and other noise mitigation elements should be incorporated into this development. No work shall commence in the County right of way until a permit is obtained from the County Transportation Department and no permit will be issued until the plat has been filed with the County Recorder’s Office. The Plat Commission does not review or approve the actual engineering design of proposed accesses or other improvements to be made in the right of way. Nothing herein is intended to restrict or limit Dakota County’s rights with regards to Dakota County rights of way or property. The Plat Commission highly recommends early contact with the Transportation Department to discuss the permitting process which reviews the design and may require construction of highway improvements, including, but not limited to, turn lanes, drainage features, limitations on intersecting street widths, medians, etc. Please contact Butch McConnell regarding permitting questions at (952) 891-7115 or Todd Tollefson regarding Plat Commission or Plat Ordinance questions at (952) 891-7070. Sincerely, Todd B. Tollefson EXHIBIT O Secretary, Plat Commission c: City of Lakeville Public Works – Engineering Division Memorandum To: Kris Jenson, Associate Planner From: Logan Vlasaty, Civil Engineer McKenzie L. Cafferty, Environmental Resources Manager John Hennen, Parks and Recreation Director Copy: Zach Johnson, City Engineer Jerilyn Erickson, Finance Director Gene Abbott, Building Official Daryl Morey, Planning Director Date: April 29, 2020 Subject: Knob Hill North • Preliminary Plat Review • Preliminary Grading and Drainage Plan Review • Preliminary Erosion Control Plan Review • Preliminary Utility Plan Review BBAACCKKGGRROOUUNNDD KJ Walk, Inc. has submitted a preliminary plat named Knob Hill North. The proposed subdivision is located west of and adjacent to Pilot Knob Road (CSAH 31), north of and adjacent to 179th Street (future CSAH 9). The parent parcel consists of Outlot E, Knob Hill of Lakeville zoned RM-1 Medium Density Residential. The preliminary plat consists of thirty-six (36) single family lots and forty-two (42) detached town home lots, within four (4) blocks, and two (2) outlots on 29.8 acres. The outlots created with the preliminary plat shall have the following use: Outlot A: Park area; to be deeded to the City (4.52 acres) Outlot B: Stormwater management basin; to be deeded to the City (2.32 acres) The proposed development will be completed by: Developer: KJ Walk, Inc. Engineer/Surveyor: KJ Walk, Inc. KKNNOOBB HHIILLLL NNOORRTTHH –– PPRREELLIIMMIINNAARRYY PPLLAATT AAPPRRIILL 2299,, 22002200 PPAAGGEE 22 OOFF 77 SSIITTEE CCOONNDDIITTIIOONNSS The Knob Hill North site consists of undeveloped agricultural land with some encroachments along the northern property line. The land generally slopes west to east and drains into the North Creek branch of the Vermillion River Watershed. The Developer has commenced grading of the site as part of the construction of 179th Street. SSTTRREEEETT AANNDD SSUUBBDDIIVVIISSIIOONN LLAAYYOOUUTT Pilot Knob Road (CSAH 31) Knob Hill North is located west of and adjacent to Pilot Knob Road, a minor arterial County highway, as identified in the City’s Transportation Plan. Pilot Knob Road adjacent to the site is a four-lane divided urban roadway. The current Dakota County Plat Review Needs Map indicates a half right-of-way requirement of 100-feet and designates it as a future six-lane divided urban roadway over its entire length adjacent to the plat. The expansion of Pilot Knob Road to a six-lane roadway is not identified in the City’s or County’s current Capital Improvement Plans. The Developer dedicated 100-feet of west half right-of-way for Pilot Knob Road adjacent to the parent parcel with the Knob Hill of Lakeville final plat. The Developer is responsible for any improvements to Pilot Knob Road, as required by Dakota County. 179th Street (Future CSAH 9) Knob Hill North is located north of and adjacent to 179th Street (future CSAH 9), a minor arterial highway, as identified in the City’s Transportation Plan. 179th Street is designated as a future County Road, as identified by the Dakota County East-West Corridor Preservation Study completed in 2006. The current Dakota County Plat Review Needs Map indicates a 120-foot wide right-of-way requirement and designates this roadway as a two-lane divided roadway over its entire length adjacent to the plat. The Developer dedicated the necessary right-of- way with the Knob Hill of Lakeville final plat. 179th Street is designed as a two-lane divided urban roadway with 10-foot wide bituminous trails along both sides of the road, and is consistent with Dakota County’s standards, access locations, and spacing requirements. 179th Street will provide a full access for the development at Pilot Knob Road. Right and left turn lanes will be provided at the roadway connections within the plat, as required by Dakota County. The alignment and design for 179th Street was reviewed and approved by the Dakota County Transportation Department. The City will maintain 179th Street until jurisdiction is transferred to Dakota County. The Knob Hill of Lakeville Development Contract requires the construction and extension of 179th Street from Fieldcrest Avenue to Pilot Knob Road by November 30, 2020. 179th St is being constructed from Pilot Knob Road to Eventide Way with the development of the Knob Hill of Lakeville plat. KKNNOOBB HHIILLLL NNOORRTTHH –– PPRREELLIIMMIINNAARRYY PPLLAATT AAPPRRIILL 2299,, 22002200 PPAAGGEE 33 OOFF 77 178th Street Development of Knob Hill North includes the extension of 178th Street, a local roadway. 178th Street is designed as a 32-foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the south side of the street. 178th Street will provide a full access to 179th Street. The Developer is dedicating 60-feet of right-of-way along the entire length of 178th Street. Evershed Way Development of Knob Hill North includes the extension of Evershed Way, a local roadway. Evershed Way is designed as a 32-foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the east side of the street. Evershed Way will provide a right-in-right out access to 179th Street and terminate with a T intersection at 178th Street. The Developer is dedicating 60-feet of right-of-way along the entire length of Evershed Way. Everest Avenue Development of Knob Hill North includes the construction of Everest Avenue, a local roadway. Everest Avenue is designed as a 32-foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the south side of the street from 178th Street to Euclid Avenue. Everest Avenue will terminate to the west with a T intersection at 178th Street and to the east with a permanent cul-de-sac. The Developer is dedicating 60-feet of right-of-way along the entire length of Everest Avenue. Euclid Avenue Development of Knob Hill North includes the construction of Euclid Avenue, a local roadway. Euclid Avenue is designed as a 32-foot wide, two-lane urban roadway with a 5-foot wide concrete sidewalk along the west side of the street. Euclid Avenue will provide a right-in-right out access to 179th Street and terminate with a T intersection at Everest Avenue. The Developer is dedicating 60-feet of right-of-way along the entire length of Euclid Avenue. CCOONNSSTTRRUUCCTTIIOONN AACCCCEESSSS Construction traffic access and egress for grading, utility and street construction shall be from a single rock construction entrance at 178th Street from 179th Street, west of Pilot Knob Road. No construction access shall be allowed from the existing streets to the south within the City of Farmington or from the existing streets to the west within the City of Lakeville. PPAARRKKSS,, TTRRAAIILLSS AANNDD SSIIDDEEWWAALLKKSS Development of Knob Hill North includes the construction of public trails and sidewalks. Five- foot wide concrete sidewalks, with pedestrian curb ramps will be installed along one side of all local streets, except for the cul-de-sac portion of Everest Avenue. A bituminous trail will be constructed along both sides of 179th Street with the Knob Hill of Lakeville development. The Park Dedication requirement has not been collected on the parent parcel and will be satisfied through land dedication that shall be dedicated with the final plat. KKNNOOBB HHIILLLL NNOORRTTHH –– PPRREELLIIMMIINNAARRYY PPLLAATT AAPPRRIILL 2299,, 22002200 PPAAGGEE 44 OOFF 77 The density of Knob Hill North preliminary plat is 2.6 units/acre (78 proposed lots/29.8 acres). The land dedication requirement for subdivisions with a density less than 3.0 lots/acre is 12%. The land dedication and cash contribution requirements are estimated as follows: Gross Area of Knob Hill North 29.8 Acres Total Buildable Area 29.8 Acres Land Dedication Requirement (12%) 3.6 Acres The Developer will dedicate 4.52 acres in Outlot A to the City for park land. This exceeds the 3.6 acres park dedication requirement. The Developer shall receive a credit to its final plat cash fees for the park dedication that exceeds to land dedication requirements that will be based on the rate in effect at the time of final plat. UUTTIILLIITTIIEESS SSAANNIITTAARRYY SSEEWWEERR Knob Hill North is located within subdistrict NC-20030 of the North Creek sanitary sewer district, as identified in the City’s Comprehensive Sewer Plan. Wastewater will be conveyed to the MCES Elko/New Market Interceptor and continue to the Empire Wastewater Treatment Facility. Development of Knob Hill North includes the extension of public sanitary sewer. 8-inch sanitary sewer will be constructed within the subdivision and connect to an existing sewer stub to the north of 179th Street to provide sanitary sewer service to the development. The Sanitary Sewer Availability Charge has not been collected on the parent parcel and will be required with the final plat. The fee will be based on the current rate in effect at the time of final plat approval. WWAATTEERRMMAAIINN Development of Knob Hill North includes the extension of public watermain. 8-inch watermain will be extended within the development to provide water service to the subdivision. Existing watermain stubs are present at the west, south, and east borders of the plat. The Lateral Watermain Access Charge is due for the portion of 12-inch watermain within Pilot Knob Road right-of-way and shall be paid with the final plat. The Lateral Watermain Access Charge will be based on the rate in effect at the time of final plat approval. OOVVEERRHHEEAADD LLIINNEESS There are no overhead utility lines located on the existing parcel. KKNNOOBB HHIILLLL NNOORRTTHH –– PPRREELLIIMMIINNAARRYY PPLLAATT AAPPRRIILL 2299,, 22002200 PPAAGGEE 55 OOFF 77 DDRRAAIINNAAGGEE AANNDD GGRRAADDIINNGG Knob Hill North is primarily located within subdistrict NC-4 of the North Creek stormwater district, as well as subdistrict FO-1 of the Farmington stormwater district as identified in the City’s Water Resources Management Plan. Development of Knob Hill North includes the construction of one City owned and maintained stormwater management basins to collect and treat the stormwater runoff generated from the site. The basin will be located within Outlot B and will provide water quality treatment and rate control of the stormwater runoff generated from the subdivision. The stormwater management basin design is consistent with City requirements. Development of Knob Hill North includes the construction of one privately owned landscaped drainage swale that will require a City and Developer maintenance agreement with the final plat. The final grading plan shall identify all fill lots in which the building footings will be placed on fill material. The grading specifications shall also indicate that all embankments meet FHA/HUD 79G specifications. The Developer shall certify to the City that all lots with footings placed on fill material are appropriately constructed. Building permits will not be issued until a soils report and an as-built certified grading plan have been submitted and approved by City staff. Knob Hill North contains more than one acre of site disturbance. A National Pollution Discharge Elimination System General Stormwater Permit for construction activity is required from the Minnesota Pollution Control Agency for areas exceeding one acre being disturbed by grading. A copy of the Notice of Stormwater Permit Coverage must be submitted to the City upon receipt from the MPCA. SSTTOORRMM SSEEWWEERR Development of Knob Hill North includes the construction of public storm sewer systems. Storm sewer will be installed within the subdivision to collect and convey stormwater runoff generated from within the public right-of-way and lots to the public stormwater management basin located within Outlot B. The Trunk Storm Sewer Area Charge has not been collected on the parent parcel and must be collected with the Knob Hill North final plat. The Developer will receive a credit to the Trunk Storm Sewer Area Charge for deeding Outlot B to the City, consistent with City policy. Final locations and sizes of all storm sewer facilities will be reviewed by City staff with the final construction plans. KKNNOOBB HHIILLLL NNOORRTTHH –– PPRREELLIIMMIINNAARRYY PPLLAATT AAPPRRIILL 2299,, 22002200 PPAAGGEE 66 OOFF 77 RREESSIIDDEENNTTIIAALL BBUUFFFFEERR YYAARRDD RREEQQUUIIRREEMMEENNTTSS 179th Street and Pilot Knob Road are minor arterial County roadways as identified in the City’s Transportation Plan. A buffer yard screen containing a combination of earth berms, plantings, or privacy fencing of sufficient density to provide a minimum visual screen shall be provided adjacent to 179th Street and Pilot Knob Road. FEMA FLOODPLAIN ANALYSIS Knob Hill North is shown on the Flood Insurance Rate Map (FIRM) as Zone X by the Federal Emergency Management Agency (FEMA). Based on this designation, there are no areas in the plat located within a Special Flood Hazard Area (SFHA), as determined by FEMA. WWEETTLLAANNDDSS Jacobson Environmental conducted a site investigation on April 28, 2017. Eight areas within the Knob Hill of Lakeville plat were investigated, including the area that is Knob Hill North. No wetlands were identified within the project boundaries. The Notice of Application was sent out 6/27/2017. No comments were received during the comment period. Based on the information provided in the report dated 5/11/2017 and site visit, the wetland delineation for the area has been determined to be acceptable for use in implementing the Wetland Conservation Act. TTRREEEE PPRREESSEERRVVAATTIIOONN A tree preservation plan was submitted and approved with the Knob Hill of Lakeville development. The plan proposed to save 15 trees, none of which were in the Knob Hill North preliminary plat boundaries. No tree preservation plan is needed for the Knob Hill North preliminary plat. EERROOSSIIOONN CCOONNTTRROOLL The developer is responsible for obtaining a MPCA Construction Permit for the site as well as developing a SWPPP for the site prior to construction. The permit requires that all erosion and sediment BMPS be clearly outlined in a site’s SWPPP. Changes made throughout construction should be documented in the SWPPP. The rear swale along the north property line must be stabilized with erosion control blanket once graded and storm sewer is installed. Additional erosion control measures may be required during construction as deemed necessary by City staff. Any additional measures required shall be installed and maintained by the developer. KKNNOOBB HHIILLLL NNOORRTTHH –– PPRREELLIIMMIINNAARRYY PPLLAATT AAPPRRIILL 2299,, 22002200 PPAAGGEE 77 OOFF 77 RREECCOOMMMMEENNDDAATTIIOONN Engineering recommends approval of the Knob Hill North preliminary plat, grading and drainage plan, erosion control plan, and utility plan.