Loading...
HomeMy WebLinkAbout17366 Eastwood Ave SurveyZoning = RM-1EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.ENGINEERING REVIEWEDDate: 01/16/2020 rmcdonald*Draintile connection required.*Maintain 6" between siding & sod*No structures in easements