Loading...
HomeMy WebLinkAbout8027 180th Street SurveyZoning = RS-4 ENGINEERING REVIEWED Date:__________________04/30/2020 corlowsky *Draintile connection required. *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.