HomeMy WebLinkAbout8027 180th Street SurveyZoning = RS-4
ENGINEERING REVIEWED
Date:__________________04/30/2020 corlowsky
*Draintile connection required.
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout, and catch
basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.