HomeMy WebLinkAbout17993 Equinox Ave SurveySILTSILT SILT SILT SILT SILTSILTSILTSILTSILTSILTSILTSILTThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and
accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.
*Maintain 6" between bottom of siding and sod.*No structures in easements.
ENGINEERING REVIEWED
Date:__________________05/27/2020 lvlasaty
EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION
Zoning = RM-1
FY - 20' House, 25' Garage
SY - 7' Interior, 20' Corner
RY - 30'
SY Buffer - 50'
RY Buffer - 50'