Loading...
HomeMy WebLinkAbout17993 Equinox Ave SurveySILTSILT SILT SILT SILT SILTSILTSILTSILTSILTSILTSILTSILTThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected and accepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Maintain 6" between bottom of siding and sod.*No structures in easements. ENGINEERING REVIEWED Date:__________________05/27/2020 lvlasaty EROSION CONTROL MUST BE INSTALLED BEFORE EXCAVATION Zoning = RM-1 FY - 20' House, 25' Garage SY - 7' Interior, 20' Corner RY - 30' SY Buffer - 50' RY Buffer - 50'