HomeMy WebLinkAbout18002 Gresford Lane SurveyPhone (214) 473-4640 2740 North Dallas Parkway, Suite 280Toll Free (888) 937-5150 Plano, TX 75093
ENGINEERING REVIEWED
Date:__________________03/31/2020 lritchie
The curb box, drain tile cleanout and catch basin(if applicable) must be inspected and acceptedbefore As-built escrow monies will be released. All structures must be flush with the sod. Thiswill be scheduled with the landscape inspection.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
*Maintain 6" between siding & sod
*No structures in easements