HomeMy WebLinkAbout8027 200th St SurveyZoning = RS-3
*Maintain 6" between bottom of siding and sod.*No structures in easements.
EROSION CONTROLMUST BE INSTALLED
BEFORE EXCAVATION
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with the
landscape inspection.
ENGINEERING REVIEWED
Date:__________________05/29/2020 corlowsky