HomeMy WebLinkAboutItem 06.m• • • ☒☐ DocuSign Envelope lD: E3108656-6800-4DD3-898E-A97SS6ES8686 AGREEMENT BETWEEN OWNER AND GONTRACTOR FOR CONSTRUCTION CONTRACT THIS AGREEMENT is by and between SAK Construction, LLC Citv of Lakeville ("Owne/') and ("Contractor''). Owner and Contractor hereby agree as follows: ARTICLE 1 - WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:2020 lnflow and lnfiltration lmprovement Project, City project No. 20-22. ARTICLE2-THEPROJECT 2'O1 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: CIPP fining of approximately L2,42L feet of 8" VCP and CIPP lining of approximately 1,209 feet of 9" VCP. ARTICLE 3 - ENGINEER 3.01 The Project has been designed by the city of Lakevilte citv Enoineer. ARTICLE 4- CONTRACT TIMES 4.01 Time of the Essence A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. 4.02 Contract Times: Dafes A. The Work will be substantially completed on or before September 2,2020, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. B. The Work will be final completed on or before October 2,2020. 4.03 Liquidated Damages A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with the Contract. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, insteid of requiring any such proof, Owner and Contractor agree that as liquidated Cam-ges for delay (but not as a penalty); 1. The liquidated damages shall be in accordance with Table 1807-1 Schedule of Liquidated Damages for all stated completion dates, as well as any intermediate completion dates. 2. Failure to complete wear course paving and open the roadway to traffic consistent with completion dates outlined in the GeneralConditions. 3. Failure to provide temporary stabilization and appropriate erosion/sediment control. 2O2O INFLOW AND INFI LTRATION TMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.20.22 AGREEMENT PAGE { DocuSign Envelope lD: E3108656-6B00-4DD3€98E-A97556E58686 4. Liquidated damages will be cumulative, and shall be collected for each portion of the project under construction in which the specified parameters have not been met ARTICLE 5- CONTRACT PRICE 5.01 Owner shall pay Contractor for completion of the Work in accordance with the Contract Documents the amounts that follow, subject to adjustment under the Contract: A. For all Unit Price Work, an amount equal to the sum of the extended prices (established for each separately identified item of Unit Price Work by multiplying the unit price times the actual quantity of that item). The Contractor's Bid, attached hereto as an exhibit, provides the basis for the extended prices for the Unit Price Work. The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by Engineer. Total of all Extended Prices for Unit Price Work (subject to final adjustment based on actual quantities) $31 1 .81 6.00. ARTICLE 6- PAYMENT PROCEDURES 6.01 6.02 6.03 Submiftal and Processing of Payments A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by Engineer as provided in the General Conditions. Progress Payments; Retain age A. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment on or about the third Monday of each month during performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such Applications for Payment have been submifted in a timely manner and othenrise meet the requirements of the Contract. All such payments will be measured by the Schedule of Values established as provided in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract. 1. Prior to Substantial Completion, progress payments will be made in an amount equal to the percentage indicated below but, in each case, less the aggregate of payments previously made and less such amounts as Owner may withhold, including but not limited to liquidated damages, in accordance with the Contract a. 95 percent of Work completed (with the balance being retainage). lf the Work has been 50 percent completed as determined by Engineer, and if the character and progress of the Work have been satisfactory to Owner and Engineer, then as long as the character and progress of the Work remain satisfactory to Owner and Engineer, there will be no additional retainage; and b. 95 percent of cost of materials and equipment not incorporated in the Work (with the balance being retainage). B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to Contractor to 100 percent of the Work completed, less such amounts set off by Owner pursuant to Paragraph 15.01 .E of the General Conditions, and less 200 percent of Engineer's estimate of the value of Work to be completed or corrected as shown on the punch list of items to be completed or corrected prior to final payment. FinalPayment A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of the General Conditions, Owner shall pay the remainder of the Contract Price as recommended by Engineeras provided in said Paragraph 15.06. 2O2O INFLOW AND INFILTRATION IMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.2O.22 AGREEMENT PAGE 2 DocuSign Envelope lD: E31 086564B00-4DD3-898E-A97556E58686 ARTICLE 7 - INTEREST 7.01 All amounts not paid when due shall bear interest at the rate of 5 percent per annum. ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS 8.01 ln order to induce the Owner to enter into this Contract, Contractor makes the following representations: A. Contractor has examined and carefully studied the Contract Documents, and any data and reference idents identified in the Contract Documents. B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work. D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings, and (2) reports and drawings relating to Hazardous Environmental Gonditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, especially with respect to Technical Data in such reports and drawings. E. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Site-related reports and drawings identified in the Contract Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor and (3) Contracto/s safety precautions and programs. F. Based on the information and observations refened to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions the Contract. G. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor. l. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. J. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Gontract Documents. K. Unless othenrise specified in the Contract Documents, the Contractor shall, upon receipt of the executed Contract Documents, submit in writing to the Owner the names ol the Subcontractors proposed for the work. Subcontractors may not be changed except at the request or the with the consent of the Owner. L. The Contract Documents shall not be construed as creating any contractual relationship between the Owner and any subcontractor. 2O2O INFLOW AND INFI LTRATION IMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.2O.22 AGREEMENT PAGE 3 DocuSign Envelope lD: E31 08656-6800.4DD3-898E-A97556E58686 ARTICLE 9 - CONTRACT DOCUMENTS 9.01 Contents A. The Contract Documents consist of the following: 1. This Agreement (pages 1 to 7 , inclusive). 2. Performance bond (pages 1 to;!_, inclusive).(Performance and Payment Bonds section 3. Payment bond (pages 1 to _L, inclusive).(Performance and Payment Bonds section) 4. General Conditions (pages 1 to _L, inclusive). 5. Supplementary Conditions (pages 1 to _L!!_, inclusive). 6. Specifications as listed in the table of contents of the Project Manual. 7. Drawings (not aftached but incorporated by reference) consisting of 11 sheets with each sheet bearing the following general title : As-builts or maos , dated 8. Addenda (numbers 1 to inclusive). 9. Exhibits to this Agreement (enumerated as follows): a. Contractor's Bid (pages 1 to -Q_, inclusive). b. Non-Collusion Affidavit (pages 1 to 1, inclusive) c. Responsible Gontractor Verification and Certification Form (pages 1 to 2, inclusive) 10. The following which may be delivered or issued on or after the Effective Date of the Contract and are not attached hereto: a. Notice to Proceed. b. Work Change Directives. c. Change Orders. d. Field Orders. B. The documents listed in Paragraph 9.01.A are attached to this Agreement (except as expressly noted othenrise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as provided in the General Conditions. ARTICLE 1O - MISCELLANEOUS 10.01 Terms A. Terms used in this Agreement will have the meanings stated in the General Conditions and the Supplementary Conditions. 10.02 Assignment of Contract A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, money that may become due and money that is due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. 2O2O INFLOW AND INFILTRATION IMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.20.22 AGREEMENT PAGE.f DocuSign Envelope lD: E31 08656-6B00-4DD3-898E-A97556E58686 Successors andAssigns A. Owner and Contractor each binds itself, its successors, assigns, and legal representatives to the other party hereto, its successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents. Severability A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision. C o ntractor's Ce rtif ication s A. The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this Contract. This Contract may be terminated by the Owner at any time upon discovery by the Owner that the prime contractor or subcontractor has submifted a false statement under oath verifying compliance with any of the minimum criteria set forth in the Statute. B. The provisions of MINN. STAT. 471.425, subdivision 4a. are imposed as a requirement of this Contract. 1. Each contract of a municipality must require the prime contractor to pay any subcontractor within ten days of the prime contractor's receipt of payment from the municipality for undisputed services provided by the subcontractor. The contract must require the prime contractor to pay interest of 1-112 percent per month or any part of a month to the subcontractor on any undisputed amount not paid on time to the subcontractor. The minimum monthly interest penalty payment for an unpaid balance of $100 or more is $10. For an unpaid balance of less than $100, the prime contractor shall pay the actual penalty due to the subcontractor. A Subcontractor who prevails in a civil action to collect interest penalties from a prime contractor must be awarded its costs and disbursements, including attorney's fees, incurred in bringing the action. lndemnity A. The Contractor agrees to indemnify and hold the City harmless from any claim made by third parties as a result of the services performed by it. ln addition, the Contractor shall reimburse the City for any cost of reasonable attorney's fees it may incur as a result of any such claims. 2O2O INFLOW AND INFILTRATION IMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.2O.22 AGREEMENT PAGE 5 10.03 10.04 10.05 10.06 10.07 Other Provisions A. Owner stipulates that if the General Conditions that are made a part of this Contract are based on EJCDC@ C-7OO, Standard General Conditions for the Construction Contract, published by the Engineers Joint Contract Documents Committeeo, and if Owner is the party that has furnished said General Conditions, then Owner has plainly shown all modifications to the standard wording of such published document to the Contractor, through a process such as highlighting or 'track changes" (redline/strikeout), or in the Supplementary Conditions. B. Any provision or part of the Contract Documents held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provisions. DocuSign Envelope lD: E3108656SB00-4DD3-898E-A97556E58686 10.08 Software License. A. lf the equipment provided by the Contractor pursuant to this Contract contains software, including that which the manufacturer may have embedded into the hardware as an integral part of the equipment, the Contractor shall pay all software licensing fees. The Contractor shall also pay for all software updating fees for a period of one year following cutover. The Contractor shall have no obligation to pay for such fees thereafter. Nothing in the software license or licensing agreement shall obligate the City to pay any additional fees as a condition for continuing to use the software. 10.09 Patented devices, materials and processes. A. lf the Contract requires, or the Contractor desires, the use of any design, device, material or process covered by letters, patent or copyright, trademark or trade name, the Contractor shall provide for such use by suitable legal agreement with the patentee or owner and a copy of said agreement shall be filed with the Owner. lf no such agreement is made or filed as noted, the Contractor shall indemnifo and hold harmless the Owner from any and all claims for infringement by reason of the use of any such patented designed, device, material or process, or any trademark or trade name or copyright in connection with the Project agreed to be performed under the Contract, and shall indemnify and defend the Owner for any costs, liability, expenses and attorney's fees that result from any such infringement. 10.10 Assignment. A. Neither party may assign, sublet, or transfer any interest or obligation in this Contract without the prior written consent of the other party, and then only upon such terms and conditions as both parties may agree to and set forth in writing. 10.11 Permits and Licenses; Rights-of-Way and Easements. A. The Contractor shall give all notices necessary and incidental to the construction and completion of the Project. The City will obtain all necessary rights-of-way and easements. The Contractor shall not be entitled to any additional compensation for any construction delay resulting from the City's not timely obtaining rights-of-way or easements. 2O2O INFLOW AND TNFILTRATION IMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.20.22 AGREEMENT PAGE 6 DocuSign Envelope lD: E31 0B656-6800-4DD3-898E-A97556E58686 lN WITNESS WHEREOF, Owner and Contractor have signed this Agreement. This Agreement will be effective on 6,11 (which is the Effective Date of the Contract). Note that the Effective Date of the Contract should match the dates of any construction bonds, if possible. The bonds shall not be dated earlier than the efective date of the Contract. OWNER:CONTRACTOR: SAK Construction, LLC By: Dcusigned by: By: Title: vi ce Presi dent (lf Contractor is a corporation, a partnership, or a ioint venture, attach evidence of authority to sign.) Attest:?n^ J, [Y),t^ 0 Title: Address for giving notices: 864 Hoff Road Title: Aftest: Title: Address for giving notices O'Fallon. MO 63356 License No.: (where applicable) (lf Owner is a corporation, attach evidence of authority fo srgn. If Owner is a public body, aftach evidence of authority to sign and resolution or other documents authorizing execution of this Agreement.) 2O2O INFLOW AND INFILTRATION IMPROVEMENT PROJECT CITY IMPROVEMENT PROJECT NO.20.22 AGREEMENT PAGE 7 City of Lakeville 2020 Inflow and Infiltration Improvement Project Project Number 20-22 Owner: City of Lakeville Project Manager: Steve Grossman Sealed bid opening was completed via Amazon Chime due to the COVID-19 pandemic. Contractor Count:5 Bid Date:6/4/2020 Bid Time: 10:30 a.m. Local Time Read By Steve Grossman Recorded By Char Freidges Bidder's List Initial Contractor Verification incl. Subcontractor List 7aContractor Verification of Compliance 7bBid Proposal 7cAffidavit and Info Required of bidders 8Addendum 1 AcknowledgedBid Bond (5%)Contractor HydroKlean X X X X X X Granite inliner X X X X X X Insituform Technologies USA, LLC X X X X X X SAK Construction, LLC X X X X X Visu-Sewer, Inc.X X X X X X Grand Total Bid $316,362.40 $458,578.00 $340,232.90 $311,816.00 $396,303.50