HomeMy WebLinkAboutSURVEYSCITY OF LAKEVILLE
CERTIFICATION OF GRADING AND
FINAL PLACEMENT OF IRON MONUMENTS
Building Pennit # 186577
Legal Description Lot 9 Block 3
RECEIVED
By Joey Pesik at 9:19 am, Jul 12, 2021
Subdivision CEDAR CROSSINGS 2ND ADDITION
Address 20659 Gosford Wav
I hereby certify that on the 21 st day of June, 2021 an inspection of this property was
conducted by me or under my direct supervision and that the as -built grades, elevations
and drainage patterns of the site and building are in conformance with the grading plan
approved by the City Engineer or amendments previously approved by the City Engineer
In addition, all property corner monuments are in place as of this date
I hereby certify that this survey plan or report was prepared by me or under my direct
supervision and that I am a duly Licensed Land Surveyor under the laws of the State of
Minnesota
Signature
Print Name
Date
EETT
Marcus F Hamnton
6/21/2021
MN License # 47481
NOTE: ATTACH A COPY OF THE CERTIFICATE OF SURVEY SHOWING ALL AS -
BUILT GRADES. ELEVATIONS AND DRAINAGE PATTERNS
Approved subdivision grading plans should be obtained from the property owner or
developer General questions relating to the building permit should be directed to the
Building Inspections Department at 952-985-4440 Questions relating to grading should
be directed to the Engineenng Department at 952-985-4500
Prior to release of the Grading Security, this document shall be filed with:
City of Lakeville
Engineering Department
20195 Holyoke Avenue
Lakeville, MN 55044
11x17
SCALE IN FEET
9 3p'
60'
•
x
tc
x900.0
(930.0)
x[900.0]
I nT 0 r)
L-U I L L
EOF/HP
(982.9)
[983.0] ;
Denotes set spike
Denotes set iron monument
Denotes found iron monument
Denotes found scribed "x"
Denotes set hub
Denotes proposed drainage
Denotes top of curb
Denotes existing elevation
Denotes proposed elevation
Denotes as -built elevation
C.00.
CATCH BASIN
-- -TOP OF RIM
ELEV.=[981.2]
S84°37' 51 "w 106[920
r981.E
982.6] -
`� c
o0
cp
.J
c.o.
(982 )
[s82.s] (982.8)
(981.4 ' o
RE _ -- �; o
[983.01 f g8_ , i 5
UTILITY _--' '
DRAINAGE &
EASEMENT PER PLAT in
1001
"cs
tS\
st-N a
LOT) 9
`985.0
`g85.1j x
tP A�0 985 3)
CP
8
.9)
N
C)1
N
> W POO
[984.7]
(j! ASEWO)
m EXIS'ONG
03
to
co
I1 �J
�5 W.
[9 784] o
SERV. 956.51
987.61
WAY
PROPERTY DESCRIPTION
Lot 9, Block 3, CEDAR CROSSINGS 2ND ADDITION, Dakota County, Minnesota
PROPERTY ADDRESS
20659 Gosford Way, Lakeville, Minnesota
NOTES
1. Bearings are based on the recorded plat.
2. Building dimensions shown are for horizontal and vertical placement of
structure only. See architectural plans for building and foundation
dimensions.
3. No specific soils investigation has been completed on this lot by James
R. Hill, Inc. the suitability of soils to support the specific house proposed
is not the responsibility ofJames R. Hill, Inc. or the surveyor.
4. No specific title search for existence or non-existence of recorded or
un-recorded easements has been conducted by the surveyor as a part
of this survey. Only easements per the recorded plat are shown.
5. Proposed grades shown were taken from the grading &/or
development plan prepared by James R. Hill, Inc.
6. Grading plan date/revision date: July 13, 2018
7. Plan No. 3030-C'CAMERON'
BENCHMARK
Top nut of hydrant located at Lots 5 and 6, Block 4 = 980.55
FLOOR ELEVATIONS
Garage Floor @ Front
Garage Top of Foundation
House Top of Foundation
Lowest Floor
Proposed
= 989.1
= 989.5
= 989.5
= 986.3
HARD COVER CALCULATIONS
Lot
House/Garage
Porch
Driveway
Sidewalk
Patio
Total Impervious
Asbuilt
= 989.1
= 989.5
= 989.5
= 986.3
= 11,854 sq. ft.
= 2,469 sq. ft.
= 114 sq. ft.
= 691 sq. ft.
= 71 sq. ft.
= 18 sq. ft.
= 3,363 sq. ft. or 28.37% of lot
DRIVEWAY TOTAL - 994 S.F.
SURVEYOR'S CERTIFICATE
I hereby certify that this survey, plan or report was prepared by me or under
my direct supervision and that I am a duly Licensed Land Surveyor under the
laws of the State of Minnesota. That this survey does not purport to show all
improvements, easements or encroachments, to the property except as
shown thereon.
Signed this 28th day of October, 2020
Ma us F. aH mpton, M
C/)
CC
>-
w
CC
CC
w
w
CD
w
CC
w
0
CC
U
v
a)
E
.R•K
LLJ
C)
I
Q
rr
I 4 v
• hM
U
0
CO
Lu
IJ� J
a
DRAWN BY
SHP/LT
DATE
10/28/2020
REVISIONS
0
cu
zE
�
o
�C)
N
0
A 11/13/2n slaza-h
1 iJ?11?1 nr'ieAe-�iill
CAD FILE
401369 dwg
PROJECT NO.
401369
SHEET 1 OF 1