Loading...
HomeMy WebLinkAbout19574 Hibbing Way-SURVEYZoning = RS-3 The curb box, drain tile cleanout, and catch basin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements. ENGINEERING REVIEWED Date:__________________06/30/2020 corlowsky