HomeMy WebLinkAboutItem 08Page 1 City of Lakeville    Memorandum  To: Mayor and City Council  From: Justin Miller, City Administrator   Jerilyn Erickson, Finance Director   Paul Oehme, Public Works Director   Zach Johnson, City Engineer   John Hennen, Parks & Recreation Director  Date: July 27, 2020  Subject: Draft 2021‐2025 Capital Improvement Program (CIP)   The Capital Improvement Program is comprised of the following components:    1) Transportation  2) Utility  3) Parks and Recreation  4) Environmental Resources  5) Facilities  6) Equipment  7) Technology    Today, we will be discussing the first four components of the draft 2021‐2025 CIP.  The remaining three  components will be presented at the August 24, 2020 workshop in conjunction with the preliminary 2021  budget.    A financial analysis of the impact of the projects on the various funding sources, debt balances, and tax levy  has not yet been completed.    Included with this report are the project descriptions, locations, revenues and expenditures. On attachments  1 and 2, project status is defined as one of the following‐   R‐ Recurring annual projects. The costs may have changed from the prior year CIP due to revised  estimates, as well as an additional year of costs added to the CIP.   IP‐ In progress. The projects were included in a prior year CIP. The costs and funding sources may  have been revised due to more accurate estimates since the prior CIP.    N‐ Projects that are new to the CIP this year.    Facilities, Equipment, and Technology data are not currently shown in the below charts and schedules.     Staff is seeking direction from the Council regarding the prioritization of the projects.    Page 2 Program Summary   The majority of capital investments are in transportation for the next five years.  The total budgeted  capital expenditures by category are shown below. The projects are financed from diverse revenues  sources.  A summary is shown below. Details are shown on subsequent pages.                          Total Cost Type: 2021 2022 2023 2024 2025 2021-2025 Transportation 12,655,350 18,560,099 11,014,161 15,220,868 10,280,519 67,730,997 Utility/Environmental Resources 7,322,709 6,806,702 6,257,254 5,040,221 3,682,888 29,109,774 Parks 4,242,517 12,081,465 4,906,425 18,006,650 6,231,900 45,468,957 24,220,576 37,448,266 22,177,840 38,267,739 20,195,307 142,309,728 Project Cost Summary Page 3           Below are some highlights of changes in the 2021‐2025 CIP. All projects are discussed in more detail in  the narrative following the Projects & Funding Sources by Category and the Projects by Funding Source  sections.     Transportation Projects  Significant changes in the 2021‐2025 CIP include increased costs allocated to pavement maintenance  projects in the pavement management fund, reduced project scope (mill and overlay in lieu of  reconstruction) in the annual street reconstruction projects, and revised cost estimates for the  City/County projects.     Total Funding Source 2021 2022 2023 2024 2025 2021-2025 General Fund 189,200 197,200 206,300 207,000 205,000 1,004,700 Escrow - 600,000 - - 5,600 605,600 Property Taxes & Fund Balance 2,142,500 2,365,857 2,435,768 2,507,777 2,581,946 12,033,848 G.O. Bonds -Property Tax Levy 8,825,397 9,825,049 5,905,486 5,603,453 4,885,593 35,044,978 G.O. Bonds - Special Assessments 30,000 3,329,209 - - - 3,359,209 Municipal State Aid/ MSA bonds 120,000 895,984 2,672,907 3,642,894 2,956,592 10,288,377 Dakota County 1,337,453 1,394,000 250,000 1,342,771 (524,000) 3,800,224 Water Trunk Fund 1,212,134 528,000 315,000 1,840,000 265,000 4,160,134 Stormwater Infrastructure Fund 1,234,530 1,409,000 205,000 492,986 433,560 3,775,076 Sanitary Sewer Trunk Fund 410,269 75,000 75,000 75,000 75,000 710,269 Park Dedication Fund / Bonds 2,645,592 10,566,000 3,671,250 16,568,910 5,176,200 38,627,952 Park Improvement Fund 923,000 760,500 265,000 352,000 290,000 2,590,500 Tax Increment Fund 200,000 200,000 - - - 400,000 Trail Improvement Fund 484,725 507,765 513,875 725,771 560,700 2,792,836 Utility- Water 2,413,326 3,084,702 3,807,254 949,135 914,828 11,169,245 Utility- Sanitary Sewer 941,098 911,000 1,205,000 1,015,000 1,320,000 5,392,098 Utility- Environmental Resources 875,000 600,000 635,000 660,000 670,000 3,440,000 Utility- Street Light 21,352 199,000 - 8,100 4,500 232,952 Other- Grants/Donations 215,000 - 15,000 2,276,942 374,788 2,881,730 24,220,576 37,448,266 22,177,840 38,267,739 20,195,307 142,309,728 Funding Source Summary Page 4 Staff is recommending a significant increase in the scope of the pavement maintenance projects (XX‐01)  in 2021‐2025 as compared to the historical amounts. This fund is currently financed by approximately  $1.1M in tax levy annually, and the current projects would necessitate funding (tax levy, bonding or other  funding) of approximately $2.1M to $2.3M annually. This amount will be reviewed in the context of the  overall tax levy as staff continues to finalize the 2021 budget, which will be presented to the council in  August.    City/County projects  The City’s cost share is based on the County highway cost participation policy. City‐led projects include  total costs and revenues from other entities; County‐led projects only include the City’s share of the  costs.     There are several projects in the current CIP where the County has agreed to advance the City’s share of  funding so the City may not need to issue bonds for the project, but instead will use a future year’s  allotment from Municipal State Aid to repay the County advance. These projects are listed below. For  City‐led projects, the payment to the County in the year of advance repayment is shown as a cost in the  Municipal State Aid fund, and a negative “Dakota County” amount.    Project # Project description Project  led by  City or  County   Construction  year(s)  Advance  repayment  year(s)  Total  estimated  advance  amount  20‐05 County Rd 70 Expansion  project  County 2020/2021 2022/2024 $3,993,696  20‐08 179th St (Future CSAH 9)    Cedar Ave/CSAH 23 ‐  Flagstaff Ave  City 2020 2023 $2,552,907  20‐10 185th St (Future CSAH 60)    Highview Ave ‐ Hamburg Ave  City 2021 2024 $185,198  21‐06 209th St (Kenrick Ave ‐ West  of Kensington Blvd)  City 2021 N/A N/A  22‐03 210th Street and Dodd Blvd  (CSAH 9) Roundabout  City 2022 2025 $524,000  23‐04 179th St (Future CSAH 9)    Hayes Ave ‐ Cedar Ave (CSAH  23)  Dodd Blvd (CSAH 9)    Gerdine Path ‐ Dodd Lane  County 2022 2025 $2,070,460  24‐04 185th St (Future CSAH 60)    Dodd Blvd/CSAH 9 ‐  Highview Ave  County 2024 2027 $578,592               Total estimated advance amount (2021‐2025): $9,904,853    Bonds for street reconstruction projects    The estimated costs for bond‐supported projects currently included in the CIP for the 2021 project year  would result in bonds of approximately $8.855 million, of which $8.825 million would be supported by  the tax levy. This would necessitate an increase in the 2022 tax levy for principal and interest payments  in the amount of $1.008M.   Page 5     OCI  The chart below reflects the City’s continued commitment to maintaining and improving the City’s street  network. The City’s local street and collector/arterial roadway rehabilitation/reconstruction continue,  with priorities placed on street segments that provide the best overall public value and benefit to the  City’s overall OCI. The City’s OCI target is 75. The OCI figures in the chart below represent the OCI at the  time the project is programmed into the CIP (prior to the improvement project).            Staff intends to do soil testing studies for the 2021‐2025 street reconstruction and collector rehabilitation  projects upon approval of the CIP, in order to better refine project cost estimates.    Pay as you go on Street Improvement projects  Staff estimates that between $155K‐$330K is needed annually to fund costs related to the following  year’s XX‐02 street improvement project (design and engineering expenses incurred in advance of  construction). For example, $155,482 is included in year 2022 in order to fund costs of the 2023 street  improvement project in advance of receiving bond proceeds in 2023. The 2021 cost for the 2022 street  improvement project is anticipated to be covered by fund balance and/or the bond proceeds. Funding  sources for the year‐ahead costs of the 2023‐2025 street improvement projects assume this level of  dedicated tax levy funding. If Council prefers an alternative methodology, bond funding may need to be  increased or alternative funding identified to cover these costs.       Year Local Streets (mile) OCI (project) Collector Roads (mile) OCI (project) Est. Project Cost 2007 2.85 1.89 1,665,920$        2008 1.30 0.14 765,935$           2009 2010 2011 2.32 0.28 2,820,000$        2012 5.88 1.72 8,636,000$        2013 4.50 1.33 8,508,000$        2014 6.06 18 1.85 18 10,236,050$      2015 7.76 40 2.18 53 24,897,675$      2016 8.27 42 0.71 48 13,349,795$      2017 8.86 32 2.57 50 13,276,728$      2018 8.24 33 2.80 33 11,842,759$      2019 8.83 36 0.80 39 10,394,221$      2020 11.10 35 2.03 30 13,805,388$      2021 10.14 48 1.60 27 7,181,863$        2022 6.53 27 3.47 41 13,754,258$      2023 4.74 55 2.40 51 5,905,487$        2024 4.74 55 1.97 50 5,603,454$        2025 4.74 55 3.92 63 5,260,382$        No Project No Project Page 6 Park Projects   Consistent with the 2020‐2024 CIP, the 2021‐2025 CIP includes significant costs for Avonlea Community  Park, Antlers Community Park and East Community Park projects. All three of these park projects are  planned to be funded using bonds, pending further discussion on a park referendum.    Consistent with the previous CIP, the 2021‐2025 CIP includes significant costs for maintenance costs of  park parking lots, which are planned to be funded by the Park Improvement Fund. This would require a  significant increase in the tax levy to the Park Improvement Fund starting in 2021.     Utility Projects   The construction of the next new well (#23) is programmed in 2024. The Michaud Park water tower and  CMF water tower are programmed for repainting in 2022 and 2023, respectively. The 2021‐2025 CIP also  includes the costs to convert to a fixed‐base water meter system.    Council Direction  Staff is seeking direction regarding the prioritization of the projects.    Attachments:  1) Projects & Funding Sources by Category  2) Projects by Funding Source  3) Project Narratives  4) City plan flowchart  5) Project Map  TotalCIP #ProjectFunding Source Project Type Status* 2021 2022 2023 2024 2025 2021‐2025STREET PROJECTSXX‐01 Pavement Management ‐ MaintenanceMaintenance RTaxes2,142,500          2,210,375          2,280,286          2,352,295          2,426,464          11,411,920          Municipal State Aid120,000             120,000             120,000             120,000             120,000             600,000                Water Operating Fund100,000             100,000             100,000             100,000             100,000             500,000                Sanitary Sewer Operating Fund100,000             100,000             100,000             100,000             100,000             500,000                2,462,500          2,530,375          2,600,286          2,672,295          2,746,464          13,011,920          XX‐02Street Reconstruction ‐ Note 1Reconstruction/Maintenance RProperty Tax Levy‐ next year project costs (ex‐ 2022 project costs in 2021)‐                      155,482             155,482             155,482             155,482             621,928                G.O. Improvement Bonds ‐ Taxes5,701,667          3,997,355          3,109,643          3,109,643          3,109,643          19,027,951          G.O. Improvement Bonds ‐ Sp. Assess.‐                      2,664,903           ‐                       ‐                       ‐                      2,664,903             Water Operating Fund1,004,343          983,702             469,754             469,754             469,754             3,397,307             Sanitary Sewer Operating Fund250,000             250,000             250,000             250,000             250,000             1,250,000             Stormwater Infrastructure Fund105,000             105,000             105,000             105,000             105,000             525,000                7,061,010          8,156,442          4,089,879          4,089,879          4,089,879          27,487,089          20‐05County Road 70 Expansion Project ‐ Note 1Expansion IPMunicipal State Aid‐                      656,000              ‐                      3,337,696           ‐                      3,993,696             Stormwater Infrastructure Fund860,014              ‐                       ‐                       ‐                       ‐                      860,014                Water Trunk Fund947,134              ‐                       ‐                       ‐                       ‐                      947,134                Sanitary Sewer Trunk Fund335,269              ‐                       ‐                       ‐                       ‐                      335,269                Park Dedication Fund226,892              ‐                       ‐                       ‐                       ‐                      226,892                Street Light Operating Fund15,952                 ‐                       ‐                       ‐                       ‐                      15,952                  Water Operating Fund365,652              ‐                       ‐                       ‐                       ‐                      365,652                Sanitary Sewer Operating Fund26,098                 ‐                       ‐                       ‐                       ‐                      26,098                  2,777,011          656,000              ‐                      3,337,696           ‐                      6,770,707             20‐08 179th St/Future CSAH 9 & Flagstaff Ave RoundaboutRoundabout IP179th St (Cedar Ave/CSAH 23‐ Flagstaff Ave)‐ Note 2Collector Rehabilitation IPMunicipal State Aid (repay County advance from 2020)‐                       ‐                      2,552,907           ‐                       ‐                      2,552,907             ‐                       ‐                      2,552,907           ‐                       ‐                      2,552,907             20‐09 Kenrick Ave Extension (181st St to Canadian Pacific Railroad)Extension IPTax Increment Fund‐                      200,000              ‐                       ‐                       ‐                      200,000                ‐                      200,000              ‐                       ‐                       ‐                      200,000                20‐10 185th St/Future CSAH 60 (Highview Ave‐ Hamburg Ave)Extension IPMunicipal State Aid‐                       ‐                       ‐                      185,198              ‐                      185,198                Dakota County447,301              ‐                       ‐                      (185,198)             ‐                      262,103                Street Light Operating Fund5,400                   ‐                       ‐                       ‐                       ‐                      5,400                    Park Dedication Fund49,700                 ‐                       ‐                       ‐                       ‐                      49,700                  Stormwater Infrastructure Fund19,516                 ‐                       ‐                       ‐                       ‐                      19,516                  521,917              ‐                       ‐                       ‐                       ‐                      521,917                21‐03 Highview Ave (175th St ‐ 160th St), Note 1Mill and Overlay IPProperty Tax Levy1,783,309           ‐                       ‐                       ‐                       ‐                      1,783,309             Special Assessments30,000                 ‐                       ‐                       ‐                       ‐                      30,000                  Water Operating Fund181,331              ‐                       ‐                       ‐                       ‐                      181,331                Sanitary Sewer Operating Fund90,000                 ‐                       ‐                       ‐                       ‐                      90,000                  2,084,640           ‐                       ‐                       ‐                       ‐                      2,084,640             21‐06 209th St (Kenrick Ave‐ West of Kensington Blvd)Extension IPDakota County890,152              ‐                       ‐                       ‐                       ‐                      890,152                Tax Increment Fund (Fairfield)200,000              ‐                       ‐                       ‐                       ‐                      200,000                1,090,152           ‐                       ‐                       ‐                       ‐                      1,090,152             City of Lakeville, MinnesotaCapital Improvements PlanProjects & Funding Sources by Category2021‐2025Page 7 TotalCIP #ProjectFunding Source Project Type Status* 2021 2022 2023 2024 2025 2021‐202522‐03210th Street Reconstruction ‐ Note 1Collector Rehabilitation IPProperty Tax Levy Roundabout 1,340,421          5,827,694           ‐                       ‐                       ‐                      7,168,115             Municipal State Aid‐                       ‐                       ‐                       ‐                      524,000             524,000                Special Assessments‐                      664,306              ‐                       ‐                       ‐                      664,306                Dakota County‐                      1,344,000           ‐                       ‐                      (524,000)            820,000                Escrow‐                      600,000              ‐                       ‐                       ‐                      600,000                Water Operating Fund‐                      429,000              ‐                       ‐                       ‐                      429,000                Sanitary Sewer Operating Fund‐                      56,000                 ‐                       ‐                       ‐                      56,000                  Street Light Operating Fund‐                      199,000              ‐                       ‐                       ‐                      199,000                Stormwater Infrastructure Fund‐                      1,204,000           ‐                       ‐                       ‐                      1,204,000             Water Trunk Fund‐                      113,000              ‐                       ‐                       ‐                      113,000                Park Dedication Fund‐                      843,000              ‐                       ‐                       ‐                      843,000                1,340,421          11,280,000         ‐                       ‐                       ‐                      12,620,421          23‐03 Ipava Ave (Kenwood Tr ‐ 185th St),Mill and Overlay IP192nd St (Kenwood Tr ‐ Dodd Blvd)‐Note 1Mill and OverlayProperty Tax Levy‐                       ‐                      2,795,843           ‐                       ‐                      2,795,843             Special Assessments‐                       ‐                       ‐                       ‐                       ‐                       ‐                         Water Operating Fund‐                       ‐                      360,000              ‐                       ‐                      360,000                Sanitary Sewer Operating Fund‐                       ‐                      290,000              ‐                       ‐                      290,000                ‐                       ‐                      3,445,843           ‐                       ‐                      3,445,843             23‐04 179th St/Future CSAH 9 (Hayes Ave ‐ Cedar Ave)Collector Rehabilitation IPDodd Boulevard/CSAH 9 (Gerdine Path ‐ Dodd Lane) ‐ Note 1Municipal State Aid‐                       ‐                       ‐                       ‐                      1,734,000          1,734,000             Dakota County‐                       ‐                       ‐                       ‐                         Escrow‐                       ‐                       ‐                       ‐                      5,600                  5,600                    Park Dedication Fund‐                       ‐                       ‐                       ‐                      97,800                97,800                  Stormwater Infrastructure Fund‐                       ‐                       ‐                       ‐                      228,560             228,560                Street Light Operating Fund‐                       ‐                       ‐                       ‐                      4,500                  4,500                    ‐                       ‐                       ‐                       ‐                      2,070,460          2,070,460             24‐03 Kenyon Ave (185th St‐ 178th St), Mill and Overlay IP205th St (W. City limit ‐ Interstate 35)‐ Note 1Mill and OverlayProperty Tax Levy‐                       ‐                       ‐                      2,493,810           ‐                      2,493,810             Water Operating Fund‐                       ‐                       ‐                      249,381              ‐                      249,381                Sanitary Sewer Operating Fund‐                       ‐                       ‐                      100,000              ‐                      100,000                ‐                       ‐                       ‐                      2,843,191           ‐                      2,843,191             24‐04 185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave)Extension with roundabout IPMunicipal State Aid‐                      119,984              ‐                       ‐                      578,592             698,576                Grant (Met Council Regional Solicitation)‐                       ‐                       ‐                      2,276,942           ‐                      2,276,942             Dakota County‐                       ‐                       ‐                      1,375,000           ‐                      1,375,000             Water Trunk Fund‐                       ‐                       ‐                      425,000              ‐                      425,000                Park Dedication Fund‐                       ‐                       ‐                      123,160              ‐                      123,160                Street Light Operating Fund‐                       ‐                       ‐                      8,100                   ‐                      8,100                    Stormwater Infrastructure Fund‐                       ‐                       ‐                      287,986              ‐                      287,986                ‐                      119,984              ‐                      4,496,188          578,592             5,194,764             25‐03 190th St (Ipava Ave ‐ Dodd Blvd)Mill and Overlay N175th St (Kenwood Tr ‐ Ipava Ave)Mill and OverlayJudicial Rd (205th St ‐ 185th St) ‐ Note 1Mill and OverlayProperty Tax Levy‐                       ‐                       ‐                       ‐                      1,775,950          1,775,950             Other cost share arrangement‐ Credit River Township (Judicial Rd)‐                       ‐                       ‐                       ‐                      374,788             374,788                Water Operating Fund‐                       ‐                       ‐                       ‐                      215,074             215,074                Sanitary Sewer Operating Fund‐                       ‐                       ‐                       ‐                      190,000             190,000                ‐                       ‐                       ‐                       ‐                      2,555,812          2,555,812             Total Transportation Projects* 17,337,651       22,942,801       12,688,915       17,439,249       12,041,207       82,449,823          *(Includes utility replacements done with street reconstruction projects)Page 8 TotalCIP #ProjectFunding Source Project Type Status* 2021 2022 2023 2024 2025 2021‐2025UTILITY PROJECTSU‐1 Sanitary Sewer Trunk ImprovementsSanitary Sewer Trunk Fund ‐ FeesR 75,000                75,000                75,000                75,000                75,000                375,000                U‐2 Sanitary Sewer Lift Station RehabilitationSanitary Sewer Operating Fund ‐ User Fees R‐                      30,000                40,000                40,000                205,000             315,000                XX‐02/XX‐01 Sanitary Sewer Rehabilitation Sanitary Sewer Operating Fund ‐ User Fees (included above with transportation projects) R‐                       ‐                       ‐                       ‐                       ‐                       ‐                         U‐3 Sanitary Sewer Inflow/Infiltration MaintenanceSanitary Sewer Operating Fund ‐ User Fees R 475,000             475,000             525,000             525,000             575,000             2,575,000             XX‐02/XX‐01 Watermain ReplacementWater Operating Fund ‐ User Fees (included above with street reconstruction projects) R‐                       ‐                       ‐                       ‐                       ‐                       ‐                         Water Operating Fund ‐ User Fees (included above with pavement management projects)‐                       ‐                       ‐                       ‐                       ‐                       ‐                         Water Operating Fund ‐ User Fees (watermain replacement between well #2 & well #4) N 200,000              ‐                       ‐                       ‐                       ‐                      200,000                U‐4Well ConstructionWater Trunk Fund ‐ FeesIP‐                       ‐                      50,000                1,000,000           ‐                      1,050,000             U‐5Watermain Trunk ExtensionsWater Trunk Fund ‐ FeesR 265,000             265,000             265,000             265,000             265,000             1,325,000             U‐6Water Distribution FeaturesWater Trunk Fund ‐ FeesR‐                      150,000              ‐                      150,000              ‐                      300,000                U‐7Well and Pump RehabilitationWater Operating Fund ‐ User FeesR 240,000             240,000             160,000             80,000                80,000                800,000                U‐8Tower and Reservoir MaintenanceWater Operating Fund ‐ User FeesR‐                      1,000,000          825,000              ‐                       ‐                      1,825,000             U‐9Water meter replacementWater Operating Fund ‐ User FeesR 322,000             332,000             1,892,500          50,000                50,000                2,646,500             ‐                      ‐                      ‐                      ‐                      ‐                     Total Utility Projects* 1,577,000$       2,567,000$       3,832,500          2,185,000          1,250,000$       11,411,500          *(Excludes utility replacements done with street reconstruction projects)ENVIRONMENTAL RESOURCES PROJECTSER‐1Lake ManagementREnvironmental Resources ‐ User Fees (water quality assessment) 50,000                50,000                55,000                55,000                60,000                270,000                Environmental Resources ‐ User Fees (water quality treatment) 15,000                15,000                20,000                20,000                25,000                95,000                  65,000                65,000                75,000                75,000                85,000                365,000                ER‐2 Maintenance ‐ Natural Resources and Storm Water InfrastructureREnvironmental Resources ‐ User Fees (storm water infrastructure) 125,000             125,000             150,000             150,000             150,000             700,000                125,000             125,000             150,000             150,000             150,000             700,000                ER‐3Storm Water Basin RehabilitationREnvironmental Resources ‐ User Fees150,000             150,000             150,000             150,000             150,000             750,000                150,000             150,000             150,000             150,000             150,000             750,000                ER‐4Storm Water Conveyance System ExpansionStormwater Infrastructure Fund ‐ Fees R 100,000             100,000             100,000             100,000             100,000             500,000                100,000             100,000             100,000             100,000             100,000             500,000                ER‐5Water Quality BMPsREnvironmental Resources ‐ User Fees75,000                75,000                75,000                75,000                75,000                375,000                75,000                75,000                75,000                75,000                75,000                375,000                ER‐6Forestry (Ash tree injection/removal, reforestation parks/public spaces)REnvironmental Resources ‐ User Fees (Ash tree injection) 50,000                50,000                50,000                50,000                50,000                250,000                Environmental Resources ‐ User Fees (Ash tree removal) 70,000                70,000                70,000                70,000                70,000                350,000                Environmental Resources ‐ User Fees (Reforestation)25,000                25,000                25,000                25,000                25,000                125,000                145,000             145,000             145,000             145,000             145,000             725,000                ER‐7Urban Restoration‐ Public System InitiativesREnvironmental Resources ‐ User Fees10,000                10,000                10,000                10,000                10,000                50,000                  10,000                10,000                10,000                10,000                10,000                50,000                  ER‐8Water Conservation‐ Public System ImprovementsREnvironmental Resources ‐ User Fees30,000                30,000                30,000                30,000                30,000                150,000                30,000                30,000                30,000                30,000                30,000                150,000                Page 9 TotalCIP #ProjectFunding Source Project Type Status* 2021 2022 2023 2024 2025 2021‐2025XX‐02 Storm Water Infrastructure (new)RStormwater Infrastructure Fund ‐ Fees‐                       ‐                       ‐                       ‐                       ‐                       ‐                         (Included above with XX‐02 transportation projects‐ street reconstruction)‐                       ‐                       ‐                       ‐                       ‐                       ‐                         20‐13 Ritter Farm Park‐ Pollinator Habitat RestorationIPOther grant‐                       ‐                      15,000                 ‐                       ‐                      15,000                  ‐                       ‐                      15,000                 ‐                       ‐                      15,000                  20‐14 Middle Creek Restoration (at Highview Ave)IPEnvironmental Resources ‐ User Fees50,000                 ‐                       ‐                       ‐                       ‐                      50,000                  Other grant185,000              ‐                       ‐                       ‐                       ‐                      185,000                Other grant‐ Vermillion River Watershed JPO30,000                 ‐                       ‐                       ‐                       ‐                      30,000                  265,000              ‐                       ‐                       ‐                       ‐                      265,000                20‐45 165th St Drainage System UpdateIPStormwater Infrastructure Fund ‐ Fees225,000              ‐                       ‐                       ‐                       ‐                      225,000                225,000              ‐                       ‐                       ‐                       ‐                      225,000                21‐07 James Jensen Park‐ Urban RestorationIPEnvironmental Resources ‐ User Fees‐                       ‐                       ‐                      25,000                25,000                50,000                  ‐                       ‐                       ‐                      25,000                25,000                50,000                  21‐XX Jurel Pond Improvements at CR 50IPStormwater Infrastructure Fund ‐ Fees150,000              ‐                       ‐                       ‐                       ‐                      150,000                150,000              ‐                       ‐                       ‐                       ‐                      150,000                Total Environmental Resources Projects 1,340,000$       700,000$           750,000$           760,000$           770,000$           4,320,000$          P‐1Parks Major MaintenanceGeneral FundRGeneral Maintenance38,400                44,400                44,600                45,900                46,000                219,300                Buildings/Shelters/Grounds43,300                66,800                63,800                79,700                51,000                304,600                Court Reconstruction/Resurfacing51,000                27,500                43,900                27,400                27,000                176,800                Field Improvements/Maintenance39,500                34,500                30,000                30,000                30,000                164,000                Open space improvement and maintenance17,000                24,000                24,000                24,000                51,000                140,000                189,200             197,200             206,300             207,000             205,000             1,004,700             P‐2Park Development ‐ Adminstrative ProjectsRPark Dedication Fund ‐ Fees (future park projects)15,000                15,000                20,000                20,000                20,000                90,000                  Park Dedication Fund ‐ Fees (comm./industrial park fee analysis)‐                       ‐                       ‐                       ‐                      15,000                15,000                  Park Dedication Fund ‐ Fees (parks, trails, and open spaces plan)‐                       ‐                       ‐                       ‐                      100,000             100,000                15,000                15,000                20,000                20,000                135,000             205,000                P‐3Park Development ‐ Developer CreditsRPark Dedication Fund435,000             435,000             435,000             435,000             435,000             2,175,000             435,000             435,000             435,000             435,000             435,000             2,175,000             P‐4 Future Park Land AcquisitionRPark Dedication Fund ‐ Fees100,000             100,000             250,000             100,000             1,500,000          2,050,000             100,000             100,000             250,000             100,000             1,500,000          2,050,000             P‐5Trail Improvements (Various Trails)RTrail Improvement Fund484,725             507,765             513,875             725,771             560,700             2,792,836             Dakota County (various projects)‐                       ‐                       ‐                      152,969              ‐                      152,969                Park Dedication Fund (trail connectivity‐ general)100,000             50,000                100,000             100,000             100,000             450,000                Park Dedication Fund (other new trails) 175th St Trail (Dodd Blvd to tunnel in Cherryview park)‐                      50,000                 ‐                       ‐                       ‐                      50,000                  Park Dedication Fund (new trail lighting)85,000                 ‐                       ‐                       ‐                       ‐                      85,000                  669,725             607,765             613,875             978,740             660,700             3,530,805             P‐6Park Improvements  (Various Parks)RPark Improvement Fund‐ playground replacement175,000             267,500             175,000             170,000             255,000             1,042,500             Park Improvement Fund‐ park parking lot improvements 648,000             443,000             35,000                92,000                35,000                1,253,000             Park Improvement Fund‐ other100,000             50,000                55,000                90,000                 ‐                      295,000                923,000             760,500             265,000             352,000             290,000             2,590,500             Page 10 TotalCIP #ProjectFunding Source Project Type Status* 2021 2022 2023 2024 2025 2021‐2025P‐7Avonlea  Community Park ‐ Note 1IPPark Dedication Fund ‐ Fees (design/construction admin.)‐                       ‐                      651,250             447,500              ‐                      1,098,750             Park Dedication Fund ‐ Fees (construction)‐                       ‐                       ‐                      14,081,250         ‐                      14,081,250          ‐                       ‐                      651,250             14,528,750         ‐                      15,180,000          P‐8 Pinnacle Reserve at Avonlea Park and GreenwayIPPark Dedication Fund ‐ Fees (planning/design)‐                       ‐                      70,000                40,000                 ‐                      110,000                Park Dedication Fund ‐ Fees (construction)‐                       ‐                       ‐                      750,000              ‐                      750,000                ‐                       ‐                      70,000                790,000              ‐                      860,000                P‐9Antlers Community Park ‐ Note 1IPPark Dedication Fund ‐ Fees (planning/design)570,000             380,000              ‐                       ‐                       ‐                      950,000                Park Dedication Fund ‐ Fees (construction)‐                      7,265,000           ‐                       ‐                       ‐                      7,265,000             570,000             7,645,000           ‐                       ‐                       ‐                      8,215,000             P‐10 Cedar Crossing ParkIPPark Dedication Fund ‐ Fees (planning/design)25,000                 ‐                       ‐                       ‐                       ‐                      25,000                  Park Dedication Fund ‐ Fees (construction)650,000              ‐                       ‐                       ‐                       ‐                      650,000                675,000              ‐                       ‐                       ‐                       ‐                      675,000                P‐11 Knob Hill ParkIPPark Dedication Fund ‐ Fees (master plan)‐                      13,000                 ‐                       ‐                       ‐                      13,000                  Park Dedication Fund ‐ Fees (planning/design)‐                      45,000                30,000                 ‐                       ‐                      75,000                  Park Dedication Fund ‐ Fees (construction)‐                       ‐                      650,000              ‐                       ‐                      650,000                ‐                      58,000                680,000              ‐                       ‐                      738,000                P‐12 Ritter Farm Park ELCIPPark Dedication Fund ‐ Fees (planning/design)‐                      75,000                75,000                 ‐                       ‐                      150,000                Park Dedication Fund ‐ Fees (cabin improvements)‐                      1,100,000           ‐                       ‐                      1,100,000             Park Dedication Fund ‐ Fees (ELC building demolition)‐                       ‐                      30,000                 ‐                       ‐                      30,000                  ‐                      75,000                1,205,000           ‐                       ‐                      1,280,000             P‐13 Casperson Park ImprovementsIPPark Dedication Fund ‐ Fees (Outdoor performance stage) 65,000                650,000              ‐                       ‐                       ‐                      715,000                Park Dedication Fund ‐ Fees (Soccer parking lot fencing)‐                      15,000                 ‐                       ‐                       ‐                      15,000                  65,000                665,000              ‐                       ‐                       ‐                      730,000                P‐14 North Creek Greenway Park IPPark Dedication Fund ‐ Fees (planning/design/master plan) 59,000                20,000                 ‐                       ‐                       ‐                      79,000                  Park Dedication Fund ‐ Fees (construction)‐                      500,000              ‐                       ‐                       ‐                      500,000                59,000                520,000              ‐                       ‐                       ‐                      579,000                P‐15 Aronson Park ImprovementsIPPark Dedication Fund ‐ Fees (shelters)‐                       ‐                      150,000              ‐                       ‐                      150,000                Park Dedication Fund ‐ Fees (safety fencing 3, third baseline, fiberglass 150') 80,000                 ‐                       ‐                       ‐                       ‐                      80,000                  80,000                 ‐                      150,000              ‐                       ‐                      230,000                P‐16 Lake Marion Greenway/Ritter Farm TrailIPDakota County‐                      50,000                250,000              ‐                       ‐                      300,000                Park Dedication Fund ‐ Fees‐                      25,000                100,000              ‐                       ‐                      125,000                ‐                      75,000                350,000              ‐                       ‐                      425,000                Page 11 TotalCIP #ProjectFunding Source Project Type Status* 2021 2022 2023 2024 2025 2021‐2025P‐17East Community Park ‐ Note 1IPPark Dedication Fund ‐ Fees (planning/design)‐                       ‐                       ‐                      228,000             152,000             380,000                Park Dedication Fund ‐ Fees (construction)‐                       ‐                       ‐                       ‐                      2,173,400          2,173,400             ‐                       ‐                       ‐                      228,000             2,325,400          2,553,400             P‐18 Knollwood Circle ParkNPark Dedication Fund ‐ Fees (planning/design)‐                       ‐                      10,000                10,000                 ‐                      20,000                  Park Dedication Fund ‐ Fees (construction)‐                       ‐                       ‐                      175,000              ‐                      175,000                ‐                       ‐                      10,000                185,000              ‐                      195,000                P‐19 Park East of Cedar/North of 181stIPPark Dedication Fund ‐ Fees (planning/design/master plan)‐                       ‐                       ‐                      59,000                20,000                79,000                  Park Dedication Fund ‐ Fees (construction)‐                       ‐                       ‐                       ‐                      500,000             500,000                ‐                       ‐                       ‐                      59,000                520,000             579,000                P‐20 Spyglass ParkIPPark Dedication Fund ‐ Fees (planning/design/master plan)‐                       ‐                       ‐                       ‐                      63,000                63,000                  ‐                       ‐                       ‐                       ‐                      63,000                63,000                  P‐21 Other projectsN/IPPark Dedication Fund ‐ Fees‐The Preserve Play Pods5,000                  85,000                 ‐                       ‐                       ‐                      90,000                  Park Dedication Fund ‐ Fees‐Bunker Hill Pickleball Court 180,000              ‐                       ‐                       ‐                       ‐                      180,000                185,000             85,000                 ‐                       ‐                       ‐                      270,000                Total Parks Projects 3,965,925$       11,238,465$     4,906,425$       17,883,490$     6,134,100$       44,128,405$        TOTAL‐ ALL PROJECTS 24,220,576$     37,448,266$     22,177,840$     38,267,739$     20,195,307$     142,309,728$      PRIOR YEAR CIP (2020‐2024) 29,373,306$      24,429,456$      38,674,346        25,563,367        Currently excludes Equipment, CHANGE (5,152,730)$      13,018,810$      (16,496,506)      12,704,372        Facilities and Technology costs*Status KeyRThese are recurring annual projects. The costs may have changed slightly from the prior year CIP due to revised estimates, and a subsequent year added to the CIP.IP These projects were included in a prior year CIP. The costs and funding sources may have been revised due to more accurate estimates since the prior CIP.NThese projects are new to the CIP this year. Note 1‐ The majority of this project is anticipated to be funded with bonds. Note 2‐ This project is being substantially completed during 2020, and is included in the 2021‐2025 CIP only to reflect the related future repayment of an advance to Dakota County in 2023.Note 3‐These new trail and trail lighting costs are planned to be incurred in conjunction with a larger roadway project included in the transportation section of the 2021‐2025 CIP. Page 12 TotalCIP #Financing / ProjectStatus* 2021 2022 2023 2024 2025 2021‐2025Escrow22‐03 210th St Reconstruction IP‐                           600,000                   ‐                            ‐                        ‐                       600,000               23‐04179th St/Future CSAH 9 (Hayes Ave ‐ Cedar Ave) / Dodd Boulevard/CSAH 9 (Gerdine Path ‐ Dodd Lane)IP‐                            ‐                            ‐                            ‐                       5,600                  5,600                    Total Escrows‐                           600,000                   ‐                            ‐                       5,600                  605,600               G.O. Improvement Bonds ‐ Special AssessmentsXX‐02 Street Reconstruction R‐                           2,664,903                ‐                            ‐                        ‐                       2,664,903            21‐03 Highview Ave (175th St ‐ 160th St) IP 30,000                     ‐                            ‐                            ‐                        ‐                       30,000                  22‐03 210th St Reconstruction IP‐                           664,306                   ‐                            ‐                        ‐                       664,306               ‐                            ‐                            ‐                            ‐                        ‐                        ‐                        Total G.O. Improvement Bonds ‐ Special Assessments 30,000                    3,329,209                ‐                            ‐                        ‐                       3,359,209            G.O. Improvement Bonds ‐Property Tax LevyXX‐02 Street Reconstruction (current year project costs) R 5,701,667               3,997,355               3,109,643               3,109,643           3,109,643           19,027,951          21‐03 Highview Ave (175th St ‐ 160th St) IP 1,783,309                ‐                            ‐                            ‐                        ‐                       1,783,309            22‐03 210th St Reconstruction IP 1,340,421               5,827,694                ‐                            ‐                        ‐                       7,168,115            23‐03 Ipava Ave (Kenwood Tr‐185th St), 192nd St (Kenwood Tr‐ Dodd Blvd) IP‐                            ‐                           2,795,843                ‐                        ‐                       2,795,843            24‐03 Kenyon Ave (185th St‐178th St), 205th St (W.City limit‐Interstate 35) IP‐                            ‐                            ‐                           2,493,810            ‐                       2,493,810            25‐03190th St (Ipava Ave‐Dodd Blvd), 175th St (Kenwood Tr‐Ipava Ave), Judicial Rd (205th St‐185th St) N‐                            ‐                            ‐                            ‐                       1,775,950           1,775,950            ‐                            ‐                            ‐                            ‐                        ‐                        ‐                        Total G.O. Improvement Bonds ‐ Taxes 8,825,397               9,825,049               5,905,486               5,603,453           4,885,593           35,044,978          G.O. Improvement Bonds‐ Total 8,855,397              13,154,258            5,905,486              5,603,453          4,885,593          38,404,187         City of Lakeville, MinnesotaCapital Improvements PlanProjects by Funding Source2021‐2025Page 13 TotalCIP #Financing / ProjectStatus* 2021 2022 2023 2024 2025 2021‐2025Municipal State Aid/Municpal State Aid BondsXX‐01Pavement Management ‐ MaintenanceR 120,000                  120,000                  120,000                  120,000              120,000              600,000               20‐05County Road 70 Expansion Project ‐ Note 1 (bonds)IP‐                           656,000                  ‐                           3,337,696            ‐                       3,993,696            20‐08 179th St & Flagstaff Ave Roundabout IP‐                            ‐                           2,552,907                ‐                        ‐                       2,552,907            20‐10 185th St/Future CSAH 60 (Highview Ave‐ Street 7) IP‐                            ‐                            ‐                           185,198               ‐                       185,198               22‐03 210th St Reconstruction IP‐                            ‐                            ‐                            ‐                       524,000              524,000               23‐04179th St/Future CSAH 9 (Hayes Ave ‐ Cedar Ave) / Dodd Blvd/CSAH 9 (Gerdine Path ‐ Dodd Lane)IP‐                            ‐                            ‐                            ‐                       1,734,000           1,734,000            24‐04185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave) ‐ Note 1 (bonds)IP‐                           119,984                   ‐                            ‐                       578,592              698,576               Total Municipal State Aid 120,000                  895,984                  2,672,907               3,642,894           2,956,592           10,288,377          Property Taxes and Fund Balance ReservesXX‐02 Street Reconstruction R‐                           155,482                  155,482                  155,482              155,482              621,928               XX‐01 Pavement Management ‐ Maintenance R 2,142,500               2,210,375               2,280,286               2,352,295           2,426,464           11,411,920          Total Property Taxes and Fund Balance Reserves 2,142,500               2,365,857               2,435,768               2,507,777           2,581,946           12,033,848          Tax Increment Fund20‐09 Kenrick Ave Extension (181st St to Canadian Pacific Railroad) N‐                           200,000                   ‐                            ‐                        ‐                       200,000               21‐06 209th St (Kenrick Ave‐ Kensington Blvd) N 200,000                   ‐                            ‐                            ‐                        ‐                       200,000               Total Property Taxes and Fund Balance Reserves 200,000                  200,000                   ‐                            ‐                        ‐                       400,000               Dakota County (Transportation projects only)20‐10 185th St/Future CSAH 60 (Highview Ave‐ Street 7) IP447,301                   ‐                            ‐                           (185,198)             ‐                       262,103               21‐06 209th St (Kenrick Ave‐ Kensington Blvd) N 890,152                   ‐                            ‐                            ‐                        ‐                       890,152               22‐03 210th St Reconstruction IP‐                           1,344,000                ‐                            ‐                       (524,000)             820,000               24‐04185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave) ‐ Note 1 (bonds)‐                            ‐                            ‐                           1,375,000            ‐                       1,375,000            Total Dakota County (transportation contributions) 1,337,453               1,344,000                ‐                           1,189,802           (524,000)             3,347,255            Other25‐03Other grant‐ Judicial Rd (Credit River Township)N‐                            ‐                            ‐                            ‐                       374,788              374,788               24‐04Other grant‐185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave)IP‐                            ‐                            ‐                           2,276,942            ‐                       2,276,942             Total Other ‐                            ‐                            ‐                           2,276,942           374,788              2,651,730              Total Transportation Projects 12,655,350            18,560,099            11,014,161            15,220,868        10,280,519        67,730,997         Page 14 TotalCIP #Financing / ProjectStatus* 2021 2022 2023 2024 2025 2021‐2025Water Trunk Fund ‐ Fees20‐05County Road 70 Expansion ProjectIP 947,134                   ‐                            ‐                            ‐                        ‐                       947,134               22‐03 210th St Reconstruction IP‐                           113,000                   ‐                            ‐                        ‐                       113,000               24‐04185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave) ‐ Note 1 (bonds)IP‐                            ‐                            ‐                           425,000               ‐                       425,000               U‐4Well ConstructionR‐                            ‐                           50,000                    1,000,000            ‐                       1,050,000            U‐5Watermain Trunk ExtensionsR 265,000                  265,000                  265,000                  265,000              265,000              1,325,000            U‐6Water Distribution FeaturesN‐                           150,000                   ‐                           150,000               ‐                       300,000               Total 1,212,134               528,000                  315,000                  1,840,000           265,000              4,160,134             Total Water Trunk Fund 1,212,134               528,000                  315,000                  1,840,000           265,000              4,160,134            Water Operating Fund ‐ FeesU‐9Water Meter ReplacementR322,000                  332,000                  1,892,500               50,000                50,000                2,646,500            XX‐02Watermain Replacement/Repair (XX‐02 Street Reconstruction project)R1,004,343               983,702                  469,754                  469,754              469,754              3,397,307            XX‐01Watermain Replacement/Repair (XX‐01 misc street repairs project)N 100,000                  100,000                  100,000                  100,000              100,000              500,000               XX‐02Watermain Replacement/Repair (between Well #2 and well #4)R 200,000                   ‐                            ‐                            ‐                        ‐                       200,000               20‐05County Road 70 Expansion ProjectIP 365,652                   ‐                            ‐                            ‐                        ‐                       365,652               21‐03 Highview Ave (175th St ‐ 160th St) IP 181,331                   ‐                            ‐                            ‐                        ‐                       181,331               22‐03 210th St Reconstruction IP‐                           429,000                   ‐                            ‐                        ‐                       429,000               23‐03 Ipava Ave (Kenwood Tr‐185th St), 192nd St (Kenwood Tr‐ Dodd Blvd) IP‐                            ‐                           360,000                   ‐                        ‐                       360,000               24‐03 Kenyon Ave (185th St‐178th St), 205th St (W.City limit‐Interstate 35) IP‐                            ‐                            ‐                           249,381               ‐                       249,381               25‐03190th St (Ipava Ave‐Dodd Blvd), 175th St (Kenwood Tr‐Ipava Ave), Judicial Rd (205th St‐185th St) N‐                            ‐                            ‐                            ‐                       215,074              215,074               U‐7Well and Pump RehabilitationR240,000                  240,000                  160,000                  80,000                80,000                800,000               U‐8Tower and Reservoir MaintenanceR‐                           1,000,000               825,000                   ‐                        ‐                       1,825,000             Total Water Operating Fund 2,413,326               3,084,702               3,807,254               949,135              914,828              11,169,245          Total Water System 3,625,460               3,612,702               4,122,254               2,789,135           1,179,828           15,329,379          Sanitary Sewer Trunk Fund ‐ Fees20‐05County Road 70 Expansion ProjectIP 335,269                   ‐                            ‐                            ‐                        ‐                       335,269               U‐1Sanitary Sewer Trunk ExtensionsR 75,000                    75,000                    75,000                    75,000                75,000                375,000                Total Sanitary Sewer Trunk Fund 410,269$                75,000$                  75,000$                  75,000$              75,000$              710,269$             Sanitary Sewer Operating Fund ‐ User FeesU‐3Sanitary Sewer Inflow/Infiltration RepairsR475,000                  475,000                  525,000                  525,000              575,000              2,575,000            U‐2Sanitary Sewer Lift Station RehabilitationR‐                           30,000                    40,000                    40,000                205,000              315,000               XX‐01Sanitary Sewer Rehabilitation  (XX‐01 misc street repairs project)N 100,000                  100,000                  100,000                  100,000              100,000              500,000               XX‐02Sanitary Sewer Rehabilitation (XX‐02 Street Reconstruction project)R 250,000                  250,000                  250,000                  250,000              250,000              1,250,000            20‐05County Road 70 Expansion ProjectIP 26,098                     ‐                            ‐                            ‐                        ‐                       26,098                  21‐03 Highview Ave (175th St ‐ 160th St) IP 90,000                     ‐                            ‐                            ‐                        ‐                       90,000                  22‐03 210th St Reconstruction IP‐                           56,000                     ‐                            ‐                        ‐                       56,000                  24‐03 Kenyon Ave (185th St‐178th St), 205th St (W.City limit‐Interstate 35) N‐                            ‐                            ‐                           100,000               ‐                       100,000               25‐03190th St (Ipava Ave‐Dodd Blvd), 175th St (Kenwood Tr‐Ipava Ave), Judicial Rd (205th St‐185th St)N‐                            ‐                            ‐                            ‐                       190,000              190,000               ‐                            ‐                            ‐                            ‐                        ‐                       ‐                              Total Sanitary Sewer Operating Fund 941,098$                911,000$                1,205,000$            1,015,000$        1,320,000$        5,392,098$          Total Sanitary Sewer System 1,351,367               986,000                  1,280,000               1,090,000           1,395,000           6,102,367            Page 15 TotalCIP #Financing / ProjectStatus* 2021 2022 2023 2024 2025 2021‐2025Street Light Operating Fund ‐ User Fees20‐05County Road 70 Expansion ProjectIP 15,952                     ‐                            ‐                            ‐                        ‐                       15,952                  20‐10 185th St/Future CSAH 60 (Highview Ave‐ Street 7) IP 5,400                       ‐                            ‐                            ‐                        ‐                       5,400                    22‐03 210th St Reconstruction IP‐                           199,000                   ‐                            ‐                        ‐                       199,000               23‐04179th St/Future CSAH 9 (Hayes Ave ‐ Cedar Ave) / Dodd Blvd/CSAH 9 (Gerdine Path ‐ Dodd Lane)IP‐                            ‐                            ‐                            ‐                       4,500                  4,500                    24‐04185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave)IP‐                            ‐                            ‐                           8,100                   ‐                       8,100                     Total Street Light Operating Fund 21,352$                  199,000$                 ‐$                        8,100$                4,500$                232,952$             Stormwater Infrastructure Fund‐ Fees20‐05County Road 70 Expansion ProjectIP 860,014                   ‐                            ‐                            ‐                        ‐                       860,014               20‐10 185th St/Future CSAH 60 (Highview Ave‐ Street 7) IP 19,516                     ‐                            ‐                            ‐                        ‐                       19,516                  22‐03 210th St Reconstruction IP‐                           1,204,000                ‐                            ‐                        ‐                       1,204,000            23‐04179th St/Future CSAH 9 (Hayes Ave ‐ Cedar Ave) / Dodd Blvd/CSAH 9 (Gerdine Path ‐ Dodd Lane)IP‐                            ‐                            ‐                            ‐                       228,560              228,560               24‐04185th St/Future CSAH 60 (Dodd Blvd ‐ Highview Ave)IP‐                            ‐                            ‐                           287,986               ‐                       287,986               XX‐02Storm Water Management Improvements ‐ Street ReconstructionR 105,000                  105,000                  105,000                  105,000              105,000              525,000               21‐XXJurel Pond Improvements at CR 50N 150,000                   ‐                            ‐                            ‐                        ‐                       150,000               ER‐4Storm Water Conveyance System ExpansionR 100,000                  100,000                  100,000                  100,000              100,000              500,000                Total Stormwater Infrastructure Fund 1,234,530               1,409,000               205,000                  492,986              433,560              3,775,076            Environmental Resources ‐ FeesER‐1Lake ManagementR 65,000                    65,000                    75,000                    75,000                85,000                365,000               ER‐2Maintenance ‐ Natural Resources and Storm Water InfrastructureR 125,000                  125,000                  150,000                  150,000              150,000              700,000               ER‐3Storm Water Basin RehabilitationR 150,000                  150,000                  150,000                  150,000              150,000              750,000               ER‐5Water Quality BMPsR 75,000                    75,000                    75,000                    75,000                75,000                375,000               ER‐7Urban Restoration‐ Public System InitiativesR 10,000                    10,000                    10,000                    10,000                10,000                50,000                  ER‐8Water Conservation‐ Public System ImprovementsR 30,000                    30,000                    30,000                    30,000                30,000                150,000               20‐45165th St Drainage System UpdateN 225,000                   ‐                            ‐                            ‐                        ‐                       225,000               21‐07James Jensen Park‐ Urban RestorationIP‐                            ‐                            ‐                           25,000                25,000                50,000                  ‐                            ‐                            ‐                            ‐                        ‐                        ‐                         Total Environmental Resources Fund 875,000                  600,000                  635,000                  660,000              670,000              3,440,000            Other20‐13Other grant‐ Ritter Farm Park‐ Pollinator Habitat RestorationIP‐                            ‐                           15,000                     ‐                        ‐                       15,000                  20‐14Other grant‐ Middle Creek Restoration (at Highview Ave)IP 185,000                  185,000               20‐14Other grant (VRWJPO)‐ Middle Creek Restoration (at Highview Ave)IP 30,000                    30,000                   Total Other 215,000                   ‐                           15,000                     ‐                        ‐                       230,000               Total Utility System Projects 7,322,709$            6,806,702$            6,257,254$            5,040,221$        3,682,888$        29,109,774$       General FundP‐1Park Major MaintenanceR 189,200                  197,200                  206,300                  207,000              205,000              1,004,700                 Total General Fund 189,200                  197,200                  206,300                  207,000              205,000              1,004,700            Dakota County (Park projects only)P‐5Various trail projectsN‐                            ‐                            ‐                           152,969               ‐                       152,969               P‐16Lake Marion Greenway/Ritter Farm TrailheadN‐                           50,000                    250,000                   ‐                        ‐                       300,000               Total Dakota County (Park contributions)‐                           50,000                    250,000                  152,969               ‐                       452,969               Page 16 TotalCIP #Financing / ProjectStatus* 2021 2022 2023 2024 2025 2021‐2025Park Improvement Fund ‐ TaxesP‐6Park Improvements‐ playground replacements (Various Parks)R 175,000                  267,500                  175,000                  170,000              255,000              1,042,500            P‐6Park Improvements‐ parking lot improvements (at parks)R 648,000                  443,000                  35,000                    92,000                35,000                1,253,000            P‐6Park Improvements‐ otherR 100,000                  50,000                    55,000                    90,000                 ‐                       295,000                    Total Park Improvement Fund 923,000                  760,500                  265,000                  352,000              290,000              2,590,500            Trail Improvement Fund ‐ TaxesP‐5Trail improvementR 484,725                  507,765                  513,875                  725,771              560,700              2,792,836                 Total Trail Improvement Fund 484,725                  507,765                  513,875                  725,771              560,700              2,792,836            Park Dedication Fund ‐ Fees/BondsP‐2Park Development ‐ Adminstrative ProjectsR 15,000                    15,000                    20,000                    20,000                135,000              205,000               P‐3Park Development ‐ Developer CreditsR 435,000                  435,000                  435,000                  435,000              435,000              2,175,000            P‐4Future Park Land AcquisitionR 100,000                  100,000                  250,000                  100,000              1,500,000           2,050,000            P‐5Trail ConnectivityR 100,000                  50,000                    100,000                  100,000              100,000              450,000               P‐5Other New TrailsN‐                           50,000                     ‐                            ‐                        ‐                       50,000                  P‐5New Trail LightingR 85,000                     ‐                            ‐                            ‐                        ‐                       85,000                  P‐7Avonlea  Community Park‐ Note 1 (bonds)IP‐                            ‐                           651,250                  14,528,750         ‐                       15,180,000          P‐8Pinnacle Reserve at Avonlea Park and GreenwayIP‐                            ‐                           70,000                    790,000               ‐                       860,000               P‐9Antlers Community Park ‐ Note 1 (bonds)IP 570,000                  7,645,000                ‐                            ‐                        ‐                       8,215,000            P‐10Cedar Crossing ParkIP 675,000                   ‐                            ‐                            ‐                        ‐                       675,000               P‐11Knob Hill ParkIP‐                           58,000                    680,000                   ‐                        ‐                       738,000               P‐12Ritter Farm Park Environmental Learning CenterIP‐                           75,000                    1,205,000                ‐                        ‐                       1,280,000            P‐13Casperson Outdoor Performance StageIP 65,000                    665,000                   ‐                            ‐                        ‐                       730,000               P‐14North Creek Greenway Park IP 59,000                    520,000                   ‐                            ‐                        ‐                       579,000               P‐15Aronson Park ImprovementsIP 80,000                     ‐                           150,000                   ‐                        ‐                       230,000               P‐16Lake Marion Greenway/Ritter Farm TrailheadIP‐                           25,000                    100,000                   ‐                        ‐                       125,000               P‐17East Community Park ‐ Note 1 (bonds)IP‐                            ‐                            ‐                           228,000              2,325,400           2,553,400            P‐18Knollwood Circle ParkIP‐                            ‐                           10,000                    185,000               ‐                       195,000               P‐19Park East of Cedar/North of 181stIP‐                            ‐                            ‐                           59,000                520,000              579,000               P‐20Spyglass ParkIP‐                            ‐                            ‐                            ‐                       63,000                63,000                  P‐21Other projectsN 185,000                  85,000                     ‐                            ‐                        ‐                       270,000               20‐10185th St/Future CSAH 60 Trail ‐ Note 3IP 29,700                     ‐                            ‐                            ‐                        ‐                       29,700                  20‐10185th St/Future CSAH 60 Trail Lighting ‐ Note 3IP 20,000                     ‐                            ‐                            ‐                        ‐                       20,000                  22‐03210th St Trail ‐ Note 3IP‐                           617,000                   ‐                            ‐                        ‐                       617,000               22‐03210th St Trail Lighting ‐ Note 3IP‐                           226,000                   ‐                            ‐                        ‐                       226,000               20‐05CR70 Trail ‐ Note 3IP 30,000                     ‐                            ‐                            ‐                        ‐                       30,000                  20‐05CR70 Trail Lighting ‐ Note 3IP 196,892                   ‐                            ‐                            ‐                        ‐                       196,892               23‐04179th St/Future CSAH9 Trail ‐ Note 3IP‐                            ‐                            ‐                            ‐                       52,800                52,800                  23‐04179th St/Future CSAH9 Trail Lighting ‐ Note 3IP‐                            ‐                            ‐                            ‐                       45,000                45,000                  24‐04185th St/Future CSAH60 Trail ‐ Note 3IP‐                            ‐                            ‐                           83,160                 ‐                       83,160                  24‐04185th St/Future CSAH60 Trail Lighting ‐ Note 3IP‐                            ‐                            ‐                           40,000                 ‐                       40,000                  Total Park Dedication Fund 2,645,592               10,566,000            3,671,250               16,568,910        5,176,200           38,627,952          Total‐ Parks Projects 4,242,517$            12,081,465$          4,906,425$            18,006,650$      6,231,900$        45,468,957$       TOTAL‐ ALL PROJECTS 24,220,576$          37,448,266$          22,177,840$          38,267,739$      20,195,307$      142,309,728$     *Status KeyRThese are recurring annual projects. The costs may have changed slightly from the prior year CIP due to revised estimates, and a subsequent year added to the CIP.IP These projects were included in a prior year CIP. The costs and funding sources may have been revised due to more accurate estimates since the prior CIP.NThese projects are new to the CIP this year. Note 1‐ The majority of this project is anticipated to be funded with bonds. Note 2‐ This project is being substantially completed during 2020, and is included in the 2021‐2025 CIP only to reflect the related future repayment of an advance to Dakota County in 2023.Note 3‐These new trail and trail lighting costs are planned to be incurred in conjunction with a larger roadway project included in the transportation section of the 2021‐2025 CIP. Page 17 CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 18 Narrative Highlights of the capital improvement projects, and revenue sources are included below. TRANSPORTATION PROJECTS Implements the following Envision Lakeville Community Values  Diversified Economic Development  Good Value for Public Services  Safety Throughout the Community  Design That Connects the Community PAVEMENT MANAGEMENT The City’s current Pavement Management Program (PMP) started in 2009. Local public streets and collector/arterial roads are inspected on a regular basis. Each segment of improved street/road is assigned an Overall Condition Index (OCI) rating. OCI ratings assist in scheduling preventive maintenance and prioritizing local street and collector/arterial road rehabilitation and reconstruction projects. Best management practices include crack sealing, surface sealing, mill and overlay, and reclamation, with spot curb/gutter and stormwater infrastructure repairs. Project costs for local street and collector/arterial road rehabilitation and reconstruction projects are based on adopted policy. 40% of project costs are assessed to benefitting properties and 60% of project costs are financed by the City through property taxes. PAVEMENT MAINTENANCE (XX‐01) Annual preventive maintenance program designed to protect the City’s investment in public roadway infrastructure assets. Best management practices include crack sealing, roadway patching, pavement marking painting, stormwater infrastructure repairs, bridge inspections and safety improvements. Maintenance is financed by the City primarily through property taxes. The City also applies a portion of the annual allotment from the State of Minnesota toward these pavement maintenance projects, with the rest going toward Municipal State Aid designated projects and debt payments on previously issued bonds supporting these projects. LOCAL STREET REHABILITATION/RECONSTRUCTION (XX‐02) Annual program designed to extend roadway life/minimize total life-cycle costs or improve local streets when routine maintenance costs exceed the cost-benefit of the investment/approaching the end of their lifecycle. The Citywide OCI goal for local streets is 75. Both rehabilitation (surface sealing/mill and overlays) and reconstruction (reclamation) techniques are utilized. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 19 COLLECTOR/ARTERIAL ROAD REHABILITATION/RECONSTRUCTION (XX‐03) Annual program designed to extend roadway life/minimize total life-cycle costs or improve collector/arterial roads when routine maintenance costs exceed the cost-benefit of the investment/approaching the end of their lifecycle. The Citywide OCI goal for collector roads is 75. Both rehabilitation (surface sealing/mill and overlays) and reconstruction (reclamation) techniques are utilized.  CP 21-03: Highview Avenue (175th St - 160th St) Programmed for 2021 construction. The City is exploring whether certain escrow funds previously collected can finance a portion of this project.  CP 22-03: 210th Street Reconstruction 210th Street/Lakeville Blvd (Kensington Blvd - Cedar Ave) Programmed for 2022 construction as a 2-lane undivided urban collector road. Safe Routes to School (SRTS) Engineering Study funding received in 2020; designed to identify safety strategies for improved pedestrian/bicyclist mobility along the corridor. If state funding becomes available, City will apply for SRTS Infrastructure Grants to construct trails/facilities to improve access and safety along the corridor.  CP 23-03: Ipava Avenue (Kenwood Tr - 185th St); 192nd Street (Kenwood Tr – Dodd Blvd) Programmed for 2023 construction.  CP 24-03: Kenyon Ave (185th St-178th St); 205th St (W. City Limit – Kenrick Ave) Programmed for 2024 construction.  CP 25-03: 190th St (Ipava Ave-Dodd Blvd), 175th St (Kenwood Tr-Ipava Ave), Judicial Rd (205th St-185th St) Programmed for 2025 construction. The property tax-funded share of the Judicial Road segment will be shared between the City and Credit River Township. CITY AND COUNTY COLLECTOR/ARTERIAL ROAD IMPROVEMENTS Partnership projects aligning with local development objectives and local/regional transportation needs. Designed to create and maintain a safe, efficient, multi-modal transportation system. City-led projects list all costs and include a contribution for the County’s estimated cost-share. County-led projects list only the City’s estimated cost-share. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 20  CP 20-05: County Road 70 Expansion Project (Kenrick Ave – Cedar Ave) Programmed for 2020/2021 construction. The City’s cost-share will be capped at a maximum of 15% of total County eligible project costs, consistent with County transportation cost sharing policies. The City’s share of project costs will be paid in 2021-2024, per the cost sharing provisions of the Joint Powers Agreement. Improvements include a) roadway reconstruction/widening to a 4-lane divided highway; b) access modifications and dedicated turn lanes at intersections; c) traffic signal system replacements at Jacquard Avenue, Dodd Boulevard and Cedar Avenue; d) public and private roadway connections providing new access to Airlake Industrial Park; e) pedestrian trails; and f) City sanitary sewer and water extensions. Possible bond funding anticipated.  CP 20-08: 179th Street/Future CSAH 9 (Cedar Ave/CSAH 23 - Flagstaff Ave) Constructed in 2020. The City’s share of project costs will be paid in 2023, per the cost sharing provisions of the Joint Powers Agreement.  CP 20-09: Kenrick Avenue Extension (181st St – Canadian Pacific Railroad) Subject to land development. Programmed for 2021 as a 2-lane undivided collector roadway to be constructed with Developer-installed improvements.  CP 20-10: 185th St/Future CSAH 60 (Highview Ave - Hamburg Ave) Subject to land development. Programmed for 2021 as a 2-lane divided collector roadway to be constructed with Developer-installed improvements. Identified as a future transfer to Dakota County jurisdiction. The City’s share of project costs are programmed for 2021 and 2024, subject to cost sharing provisions of a future Joint Powers Agreement.  CP 21-06: 209th Street (Kenrick Ave – 1/8th mile west of Kensington Blvd) Subject to land development. Programmed for 2021 as a 2-lane undivided collector roadway to be constructed with Developer-installed improvements. Includes realignment of 209th Street (Kenrick Avenue) from existing 210th Street/CSAH 70 intersection (permanently removing access) to existing terminus 1/8th mile west of Kensington Boulevard.  CP 23-04: 179th St/Future CSAH 9 (Hayes Ave – Cedar Ave)/ CP 21-05: Dodd Boulevard/CSAH 9 (Gerdine Path - Dodd Lane) Programmed for 2022 construction as a 2-lane undivided collector roadway (Dodd Blvd) and a 4-lane divided highway (179th St). The City’s share of project costs will be CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 21 paid in 2025 per the cost sharing provisions of the Joint Powers Agreement (project is labeled in JPA as County project 9-56 and City project 21-05). Dodd Boulevard and 179th Street carry importance to City and County transportation systems. 179th Street is expected to serve as an east-west corridor through the County once the connection between Highview Avenue and Pilot Knob Road is constructed, and is best designated as County controlled due to its regional significance. In comparison, Dodd Boulevard will likely function more as a local road in its existing alignment and is more appropriately designated as City controlled. City and County staff are in the process of establishing the framework for a future turnback agreement.  CP 24-04: 185th St/Future CSAH 60 (Dodd Blvd - Highview Ave) Construction subject to federal transportation funding. The City applied for funding during the Metropolitan Council 2020 Regional Solicitation in Spring, 2020. Programmed for 2024 construction as a 2-lane divided highway. The City’s share of project costs are programmed for 2021, 2024 and 2025, subject to cost sharing provisions of a future Joint Powers Agreement. Identified as a future transfer to Dakota County jurisdiction. CITY AND COUNTY INTERSECTION IMPROVEMENTS Partnership projects aligning with local/regional transportation needs. Designed to alleviate congestion, improve intersection operations, provide for increasing traffic levels and make safety improvements. City-led projects list all costs and include a contribution for the County’s estimated cost-share. County-led projects list only the City’s estimated cost-share. Traffic signals along County highways are owned by the County. Maintenance on City-owned traffic signals is done by County through a maintenance agreement. directional access/median modifications.  CP 22-03: 210th Street/Lakeville Blvd (Kensington Blvd - Cedar Ave) Programmed for 2022 construction. Project includes a single-lane roundabout at the intersection of 210th Street and Dodd Boulevard. If state funding becomes available, City will apply to MN Department of Transportation Local Road Improvement Program. The City’s share of project costs is programmed for 2025, subject to cost sharing provisions of a future Joint Powers Agreement.  CP 24-04: 185th St/Future CSAH 60 (Dodd Blvd - Highview Ave) Programmed for 2024 construction. Project includes a single-lane roundabout at the intersection of 185th Street and Highview Avenue. If state funding becomes available, City will apply to MN Department of Transportation Local Road Improvement Program. The City’s share of project costs is programmed for 2025, subject to cost sharing provisions of a future Joint Powers Agreement. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 22 UTILITY PROJECTS Implements the following Envision Lakeville Community Values  Good Value for Public Services U‐1: SANITARY SEWER TRUNK SYSTEM IMPROVEMENTS The Sanitary Sewer Plan anticipates the extension of sanitary sewer trunk facilities to serve areas of anticipated/planned growth. Timing of sanitary sewer trunk system improvements subject to growth rate and location of planned community development. U‐2: SANITARY SEWER LIFT STATION REHABILITATION Lift station service life is 15-20 years. Pumps, motors and equipment are inspected, repaired and replaced to ensure uninterrupted service. Lift stations are inspected/cleaned annually and scheduled for rehabilitation every 15 years. Lift Station #4, #9, #16, #18, and #21 are scheduled for rehabilitation between 2021-2025. XX‐02: SANITARY SEWER REHABILITATION Public sanitary sewer infrastructure is subject to breaks, cracks and root intrusion. Rehabilitating damaged sanitary sewer infrastructure is required to maintain the integrity and function of the sanitary sewer collection system. Sanitary sewer within planned transportation project limits is inspected and any rehabilitation is programmed with the roadway improvements to minimize life-cycle costs. U‐3: SANITARY SEWER SYSTEM INFLOW AND INFILTRATION MAINTENANCE Annual program designed to manage peak discharge rates and maintain/extend the overall service life of the sanitary sewer collection system through rehabilitating infrastructure susceptible to inflow and infiltration (groundwater). Public sanitary sewer infrastructure is inspected (televising 250,000 pipe-feet/year) and cleaned (jetting 75 pipe-miles/year) to maintain the integrity and function of the sanitary sewer collection system. XX‐02: WATER MAIN REPLACEMENT Public water main infrastructure is subject to breaks, cracks and corrosion. Replacing damaged water main infrastructure is required to maintain the integrity and function of the water distribution system. Water main within planned transportation project limits is evaluated based on age, break history and soil conditions. Any rehabilitation or installation of preventive measures (hydrant/valve bolt replacement, corrosion protection) are programmed with the roadway improvements to minimize life-cycle costs. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 23 U‐4: WELL CONSTRUCTION The Water Plan provides guidance in identifying future water system facilities required to serve areas of anticipated/planned growth. A new well is programmed for 2024 construction with engineering costs programmed for 2023. Construction timing and well location subject to population demand/water needs. The City must amend its Wellhead and Source Water Protection Plan to receive Minnesota Department of Health permit. U‐5: WATER MAIN TRUNK SYSTEM IMPROVEMENTS The Water Plan anticipates the extension of water main trunk facilities to serve areas of anticipated/planned growth. Timing of water main trunk system improvements subject to growth rate and location of planned community development. U‐6: WATER DISTRIBUTION FEATURES The Water Plan provides guidance in identifying future water system features required to serve areas of anticipated/planned growth, including features to either reduce or boost the water pressure due to the elevation of new development. New pressure reducing valves are programmed for 2022 and 2024 construction. Construction timing and well location subject to growth rate and location of planned community development. U‐7: WELL AND PUMP REHABILITATION Well pumps, motors and equipment are inspected, repaired and replaced to ensure uninterrupted, efficient service and a water system operating at maximum pumping capacity. City wells provide water for the on-demand distribution system (24 hours/day and 7 days/week). Multiple starts/stops place tremendous stress on the motors and pump components and constant water exposure can lead to corrosion. Well and pumps are inspected/cleaned annually and scheduled for rehabilitation every eight to ten years, depending on pump type. U‐8: TOWER AND RESERVOIR MAINTENANCE Maintenance program designed to manage, preserve and protect investment in water storage tanks (interior and exterior). Maintenance removes buildup, dirt and dust, and extends the life of the coating system, minimizing total lifecycle costs. 2022 programmed costs include repainting the Michaud Park water storage tower, and cleaning the Airlake, Dakota Heights, Fairfield and Holyoke water storage towers. The CMF tower repainting will take place in 2023. The repainting costs for the CMF and Michaud Park towers were accelerated due to a 2018 consultant review. U‐9: WATER METER REPLACEMENT Annual program designed to replace residential and commercial water meters approaching the end of their lifecycle to ensure accurate water monitoring use data for MN Department CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 24 of Natural Resources reporting. Current program goal is 1,000 water meter replacements per year (based on meter age) with the intent of meeting and maintaining a 20-year service life. Water meter replacement is completed by Public Works – Utilities Division staff. 2023 programmed costs include one-time costs to convert the water meter system to a fixed- base system. ENVIRONMENTAL RESOURCES PROJECTS Implements the following Envision Lakeville Community Values  A Sense of Community and Belonging  Access to a Multitude of Natural Amenities and Recreational Opportunities LAKE MANAGEMENT (ER‐1) WATER QUALITY ASSESSMENTS AND WATER QUALITY TREATMENTS Annual management program designed to promote and protect public water resources. Annual assessment results are used to identify best management practices and strategies, and to prioritize and schedule treatments. Assessment techniques include aquatic plant surveys, aquatic invasive species (AIS) monitoring, fish surveys and water monitoring/sampling. Best management practices and strategies include chemical treatments, education and outreach, and fish management. Financed by the City through utility funds. MAINTENANCE (ER‐2) STORMWATER INFRASTRUCTURE Annual preventive maintenance program designed to protect the City’s investment in public stormwater infrastructure. Best management practices include flared-end section repairs, sediment removal, storm sewer pipe and manhole repairs, and stormwater conveyance systems improvements. Emphasis on Minnesota Pollution Control Agency Municipal Separate Storm Sewer System (MS4) permit compliance. Financed by the City through utility funds. STORMWATER BASIN REHABILITATION (ER‐3) Annual maintenance program designed to extend service life/minimize total life-cycle costs of public stormwater basin collection systems. Stormwater management basins improve water quality of stormwater runoff and reduce peak stormwater discharge rates. Public stormwater basins are inspected on a regular basis. Inspections assist in scheduling maintenance and prioritizing rehabilitation projects. Best management practices include maintenance at emergency overflow/easement areas, sediment/vegetation removal and slope restoration. Emphasis on Minnesota Pollution Control Agency Municipal Separate Storm Sewer System (MS4) permit compliance. Financed by the City through utility funds. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 25 STORMWATER CONVEYANCE SYSTEM EXPANSION (ER‐4) The Water Resources Management Plan anticipates the extension/expansion of new stormwater infrastructure to serve areas of planned growth. New infrastructure includes storm sewer pipes and structures, basins and wetlands. Timing of new stormwater infrastructure is subject to growth rate/location of planned community development. Financed by the City through the Stormwater Infrastructure Fund. WATER QUALITY BEST MANAGEMENT PRACTICES (ER‐5) Partnership projects aligning with Black Dog Watershed Water Management Organization (BDWMO), Dakota County Soil and Water Conservation District (DCSWCD) and Vermillion River Watershed Join Powers Organization (VRWJPO) restoration and protection strategies. Funding intended as City’s cost-share to meet BDWMO, DCSWCD, VRWJPO partnership or grant matching requirements. Emphasis on Federal Clean Water Act, Minnesota Pollution Control Agency MS4 permit and Total Maximum Daily Load (TMDL) compliance. FORESTRY (ER‐6) Annual maintenance program designed to manage, preserve and protect public woodland assets. Best management practices include Emerald Ash Borer program (tree injections, tree removal/stump grinding of infected trees and reforestation of public parks/open spaces). Financed by the City through utility funds. URBAN RESTORATION ‐ PUBLIC SYSTEM INITIATIVES AND IMPROVEMENTS (ER‐7) Program designed to restore and manage landscaping at public facilities and public open spaces by replacing hardscape and lawns with native plants/low-maintenance vegetation. Best management practices include native grasses/plants, prairies, rain gardens and woodlands to provide storm water rate control/volume reduction or water quality improvements. Financed by the City through utility funds. WATER CONSERVATION (ER‐8) Program designed to implement water conservation strategies at public facilities and public open spaces. Best management practices include water reuse systems and smart irrigation systems to reduce water use. NEW STORMWATER INFRASTRUCTURE (XX‐02) LOCAL STREET RECONSTRUCTION Construction of new stormwater infrastructure, coordinated with local street and collector/arterial road rehabilitation and reconstruction projects, to provide stormwater rate control, volume reduction or water quality improvements. Best management practices include filtration/infiltration systems, mechanical storm water/sediment separators, rain CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 26 gardens and water conservation strategies. Financed by the City through the Stormwater Infrastructure Fund.  CP 20-13: Pollinator Habitat Restoration at Ritter Farm Park Construction subject to state funding. Programmed for 2021 construction. Restoration project designed to restore/enhance biological diversity (pollinator habitat, prairies) and ecological functions, and increase educational awareness through signage. Financed by the City through utility funds.  CP 20-14: Middle Creek Restoration at Highview Avenue Programmed for 2020/2021 construction. Stream restoration of Middle Creek (tributary to Vermillion River) to improve wildlife habitat, restore eroding/failing stream banks and improve water quality. Partnership project with VRWJPO, City’s share of project costs will be paid in 2021/2022, per the cost sharing provisions of the Joint Powers Agreement. State funding received (Clean Water Fund Grant MN BWSR). Financed by the City through utility funds.  CP 20-45: 165th Street Drainage System Improvements Programmed for 2020/2021 construction to address localized flooding and stormwater infrastructure capacity issues. Includes stormwater basin expansion and additional stormwater infrastructure. Financed by the City through the Stormwater Infrastructure Fund.  CP 21-07: Restoration at James Jensen Park Programmed for 2024 construction. Project designed to restore and manage landscaping by replacing hardscape and lawns with native plants/low-maintenance vegetation. Best management practices include native grasses/plants, prairies, rain gardens and woodlands to provide floodplain management, storm water rate control/volume reduction or water quality improvements.  CP 21-XX: Jurel Pond Improvements at CR 50 Programmed for 2020/2021 construction to address localized flooding and stormwater infrastructure capacity issues. Includes stormwater basin expansion and additional stormwater infrastructure. Financed by the City through the Stormwater Infrastructure Fund. PARKS PROJECTS Implements the following Envision Lakeville Community Values CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 27  Good Value for Public Services  Safety Throughout the Community  Design That Connects the Community  A Sense of Community and Belonging  Access to a Multitude of Natural Amenities and Recreational Opportunities P‐1‐ PARKS MAJOR MAINTENANCE PROJECTS‐ Includes general maintenance projects, maintenance of buildings, park shelters and ground, fields and open spaces (examples- re- shingle park shelters, replace signs, replace rubber floors, seal park parking lots, resurface basketball and tennis courts, etc). P‐2‐ PARKS ADMINISTRATIVE PROJECTS‐ The Park Dedication Fund budget provides appropriations for many activities including planning, design and feasibility reports for park projects such as Cedar Crossing Park, North Creek Greenway Park and Knob Hill Park. P‐3‐ PARK DEVELOPMENT DEVELOPER CREDITS: Represents credits associated with new development when the park dedication requirement is fulfilled through a land dedication. P‐4‐ FUTURE PARK LAND ACQUISITION‐ Park dedication funds are used to purchase future park land. The current CIP includes purchases of park land as follows: $250,000 in 2022 and $1,500,000 in 2025. P‐5‐ TRAIL IMPROVEMENTS‐ The City retained a third party in 2011 to evaluate the condition of all trail segments and provide recommendations for maintenance. Based on these recommendations, staff has developed a plan for either overlaying or reclaiming trail segments, along with crack filling and fog sealing of trails. Maintenance of sidewalk and trails is provided in accordance with the current County and City Maintenance Agreement for County Bikeway Trails. Dakota County staff is proposing to amend the County cost-share policy and the system-wide maintenance agreement with the City. The draft language, subject to Board approval, is as follows: F.8 Multi‐Use Trails and Sidewalk Maintenance Participate in pavement preservation, overlay, or reconstruction of trails and sidewalks along the County highway system up to 100 percent. The City is responsible for snow and ice removal. To be eligible for County participation in trails and sidewalks, a system‐wide maintenance agreement between the County and local agency will be required to identify system‐wide trail and sidewalk roles and cost responsibilities. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 28 P‐5‐ TRAIL LIGHTING – Currently there are several segments that do not have trail lighting, and installation of trail lighting would provide safety benefits. The proposed CIP includes trail lighting in areas such as Stoneborough Park (2021). P‐5‐ TRAIL CONNECTIVITY – Park dedication funds are used to cover the costs of connecting trail segments that are currently not connected. In the 2018 Envision Lakeville survey results, 71% of respondents indicated that a Local Interconnected Trail System is a high or medium priority to them. There are currently seven to ten miles of trails remaining to be constructed in order to complete the planned interconnected trail system. P‐6‐ PARK IMPROVEMENTS‐ The Park Improvement Fund provides funding for replacement and upgrades to items such as playgrounds, shelters and buildings, parking lots used to access City parks, and other park amenities. P‐7‐ AVONLEA COMMUNITY PARK‐ The Parks, Trails and Open Space Plan identifies the acquisition of land along the Cedar Ave corridor for community play fields. The City owns approximately 42 active acres of property that was acquired through the development of the Avonlea Development. The Master Planning process for the park completed in 2018 identified specific amenities for the park. Bond funding is anticipated for this project. P‐8‐ PINNACLE RESERVE AT AVONLEA PARK– The Parks, Trails and Open Space Plan calls for a neighborhood park in the Avonlea Development and surrounding areas. P‐9‐ ANTLERS COMMUNITY PARK– City Staff worked with WSB and Associates regarding the creation of the Antlers Park Master Plan which was completed in the fall of 2017. The Master Plan identifies the improvements and additional amenities to be included in the community park. Construction of the park is proposed to be completed in 2022 pending available funding. Bond funding is anticipated for this project. P‐10‐ CEDAR CROSSING PARK‐ The Parks, Trails, and Open Space Plan calls for a neighborhood park in the area serving Cedar Crossing, Cedar Landing, and Linden Ridge neighborhoods along with the Country Lane Townhomes. The park will be approximately 6-7 acres in size. P‐11‐ KNOB HILL PARK – The Parks, Trails and Open Space Plan calls for a neighborhood park in the area serving Kenridge, Autumn Meadows and Pleasant Hill developments. The park will be approximately seven acres in size. P‐12‐ RITTER FARM PARK ELC – Currently, a relocated log cabin exists on a foundation at Ritter Farm Park. Plans are to demolish the existing two-story Environmental Learning Center on site and convert the cabin into the new Environmental Learning Center in 2023. CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 29 P‐13‐ CASPERSON PARK OUTDOOR PERFORMANCE STAGE – The Parks, Trails and Open Space Plan identifies an amphitheater/outdoor performance stage that should be constructed as a park destination amenity. The Parks, Recreation and Natural Resources Committee also recommends the construction of an outdoor performance stage in our parks system. Casperson Park has been identified as the location of the stage to be constructed in 2022. P‐14‐ NORTH CREEK GREENWAY PARK – The Parks, Trails and Open Space Plan calls for a neighborhood park serving developments on the east side of Pilot Knob Road and north and south of 179th St. This park will be a neighborhood gateway to the North Creek Greenway Trail system. P‐16‐ LAKE MARION GREENWAY/RITTER FARM TRAIL – A feasibility study is in process during 2020 for improvements to and extension of the Lake Marion Greenway/Juno Trailway from downtown Lakeville into Ritter Farm Park. The feasibility study along with the construction and improvements to this trailway are planned to be cost shared between the City and Dakota County. P‐17‐ EAST COMMUNITY PARK PHASE II – The Master Planning process for the park completed in 2018 identified specific amenities for the park. The park is proposed to be constructed in 2025 with Bond funding anticipated to be used for the project. P‐18‐ KNOLLWOOD CIRCLE PARK – The City currently owns approximately 1.75 acres of land at the south end of Knollwood Circle which abuts up to the back waters of Lake Marion. The location is ideal for park amenities such as a picnic shelter, canoe/kayak racks and a boarding dock. P‐19‐ PARK EAST OF CEDAR/ NORTH OF 181ST – The Parks, Trails, and Open Space Plan calls for a neighborhood park East of Cedar Ave and North of 181st St. serving the future development in this area. The park could be 3-7 acres in size. P‐20‐ SPYGLASS PARK PHASE 2 – Spyglass Park currently consists of a playground, shelter and green space on a parcel 4.2 acres in size. Once the area north of the park develops, plans are to expand the park with additional green space and amenities to serve all the neighborhoods in the area. P‐21‐ OTHER PROJECTS‐ This category is intended to include smaller park projects. Currently, projects include the reconstruction of Bunker Hills tennis courts into six designated pickleball courts, and the Preserve play pods. The North Creek Greenway Trail was included in the 2020-2024 CIP, and has been removed from the 2021-2025 CIP. The County is planning to complete this trail from CITY OF LAKEVILLE CAPITAL IMPROVEMENT PLAN 2021‐2025 PAGE 30 Lakeville’s south border to 173rd St, and are planning to incur 100% of the costs. The City previously acquired land that will be used in construction of this trail.                                                         Capital Improvement Plan & Operating Budget Infrastructure Specific Plans   Water Plan Adopted 2019 Next update 2028 Transportation Plan Adopted 2019 Next update 2028 Sanitary Sewer Plan Adopted 2019 Next update 2028 Water and Natural Resources Management Plan Adopted 2019 Next update 2028 Parks, Trails and Open Space Plan Last update 2015 Next update 2021 Citywide Planning 2040 Comprehensive Plan / Land Use Plan Adopted 2020 Envision Lakeville 2040 Last Update 2018 Studies & Site Specific Plans/REPORTS   Water Rates & Fees Study Last Update 2017 Water Treatment Facility Expansion Plan Last Update 2013 Sewer Rates & Fees Study Last Update 2017 CMF Expansion Study Last Update ~2015 Dakota County East-West Corridor Preservation Study Phase 1- 2003/Phase 2-2006 CR 50 Corridor Study (2013) NPDES MS4 Permit Implementation In progress Park Dedication Fee Study Last update 2012 Various Park Master Plans (As needed) ADA Transition Plan Last update 2019 CR 31 Corridor Study (2007) Downtown Development Guide Updated 2018/ Next update 5-10 yrs Indoor Athletic Facility Study (2017) 2021 Projects Street Reconstruction Pavement Management CR 70 Expansion 185th St/Future CSAH60 extension Highview Ave mill and overlay 209th St extension Stormwater Management Basin Rehab Well #2, #9, #14 rehabilitation Middle creek restoration @Highview Ave Antlers Community Park Cedar Crossing Park 165th St Drainage system update Jurel pond improvements at CR -50 Various other park projects NOTES: additional projects in cip not listed here Projects with Dakota County involvement are subject to the County Transportation Cost Participation Policy (Revised in 2018) Fire Resource/Space Needs Study Update 2020 Lake Management Report (Annual) Various Natural Resource Management Plans- *East, Orchard, Ritter Farm (As needed) School Road Safety Task Force (Last Update~2014) Dakota County Principal Arterial Study (2018) CSAH 50/Kenwood Tr- CSAH 60/185th St Intersection Study (2011) Intersection Traffic Control Feasibility Studies (Dodd Blvd/Highview Ave and Dodd Blvd/185th St- 2009) Interstate 35 & County Road 50 Scoping Study (tbd) County Road 9 & 179th St Corridor Study (2019) Strategic Plan for Economic Development Updated 2019/ Next update 2022 Strategic GIS Plan Updated 2018/ Next update 2020 5706023503146935175TH ST W162NDSTWJAGUARPATH162NDSTKENRICK AVEUPPER164THSTW205TH ST WFOLIAGE AVEG A N N O NAVEIP A VA AVEFLAGSTAFF AVEEAGLE V IEWDR GERDINEPATH162NDSTWINTER L A CHENBL V D HOLYOKE AVE205THSTWFAIRGREEN AVEGRIFFON TRLKENSINGTONBLVDGRIFFONTRL179THSTW175THSTW165TH ST WGLACIERWAY170THSTW162NDSTWJACQUARD AVEFLAGSTAFF AVE207TH ST W210TH ST W190TH ST W167THSTW208THSTW194THSTWHOLYOKE AVEJAGUAR AVEHAMBURG AVEIPAVA AVEKENYONAVEK E O K U K AVE LAKEVILLEBLVD170TH ST WKENRICKAVEFINCH WAY179THSTWKENRICKAVEIP A V A A V E KLAMATHTRLHARTFORDWAY192NDSTWHIGHVIEWAVE179THSTWKENRICKAVEHIGHVIEW AVEKEOKUKAVELUCERNETRL183RDSTWICALEEPATH219TH ST WKENYONAVELARED O PATHINDIANAAVE HIGHVIEW AVE202NDSTW200TH ST WHAMBURG AVE190TH ST W162NDSTWK E N W O O D T R L160TH ST W185TH ST W210TH ST WDODD BLVDCEDARAVE185TH ST W215TH ST WKENWOOD TRLISLETONWAYDODDBLVDDODD BLVD202NDSTWPILOTKNOBRDJUNIPER WAYLAKEVILLE BLVDKENRICK AVE202ND ST W200TH ST WHawthorn PathJaguarAve206th St WUpper205thStW163rd Ct W206th St WJAMAICA LNJackpine Ct I n n s b r o o k C i rHillside CtJacquardPathJacobite CtImpalaPathHopewell CtItaly Ct1 7 3 R D C I R W I s l e t onAveJustice CtKingsw ayPathFirestonePathFirmanCtJaguarTerJamestownAveGatewayDrHibiscusAveJU N OTRLGage Ct173rd St WJasminePathJupi t er Ave ItalyAve173rd St WJ onquilAveHave rhi l l Cir205thStWIsanti CtF re e portWayFiveOaksDrUpper178thStWFairhaven AveInterlachenBlvd JaegerCtUppe r205thStWHickory CtKey West CtHutchinsonDrIsletonCtIxoniaAveH a rv a r d D rJupite rCirHARVARDLN175thStWISOSCELLESAVEH o l b r o o k C t H i c k o ryC tHolt AveG a geAveJackdawPathFirestoneCt175thStWFARADAYLNJunellePathHydeParkAveJasper Ct190th St WFi e ldcrestAve 207th St WHollins Ave205th St WGlasgow Av eFairfax AveHeritageDrINDALECTHoneycombPathHOLLYBROOKTRL Judicial Rd214thStW209th St W212th St W176th St WJuneCt204th St W178thStW177thStW169thStW J oyAve F u r y C t IdaliaPathFallbrook DrHillsbo roCtEncinaPathEmbers Ave173rdStWH Y D R A N GE A L N 178thStW207th St WH e rsh e y C tIn te rlachen Ct H e m lock Ct JameswoodCt174 thStWFirestonePathHeidelbergWayFarragoTrItasca Trl173rdStWIcosa StH a r v a r d C t I p a v a A ve G lasgowWayHyde Park Ave178thStWHousto n A v e H ominyPa th 198thCtWHuntin g tonPa t h Eagleview DrGunflintCirKennardCtImpalaPathHayesAveJaegerPathJ a c k s o n villeCt17 5t hStW206thStW208thStWG U N FL I N T TRL KenyonAveFoliage AveJ aguarAveHydra CtFolsomPath170thStWLansfordPathFalconAve175thStWI b e r ia Ave Islan d Ave Ixonia AveHighview AveIteri PlFieldcrestAveJACKSONTRLJacquard P a t h GARRISONLNF irtreePl171st St WHARMONYTRLF estalAve173rdStWHarvard DrJamaicaCirFoliageCt KenrickAve172nd St WGE MIN I T RLJoplinAve206thStWHayesAveJacama r W ayF r ost Ct IndependenceAveGlacierWay170thStWLamarCtKenrickAveIronwoodCir180thStW205th St WGlacierWayIKARIATRLFIRESIDELNJaliscoWayJutlandPlFi e ldcr es t Ave ItalyPathIncaAve218th St WJackrabb it P a t h JaguarAve175th St WE a s t w ood Ave HOMESTEADTRLKeyWestC tJaguarPathFloridaWayIsletonAveKe nyo n A v e170thStWHUBBARDTRL170thStW H OL ISTERLNKendaleDr 207th St W175th St WFontin aP a t h 178thStW175th St WJaguarPathInndaleDrJaguarAveIndioPathHICKORYTRL JURATRLJ u p i t erPathUpper162ndStWGRIFFONLNInglesideCt INMANTRL174thStWHayesAveHudsonAve213thStWKenyonAveFruitw o o dPathLAMARLN175thStWIsleAve201stStWJunelleP a thJACKPINETRL HyacinthWay176thCtImpat iensWayH illw oodA v eHemlockAve JusticeP a th I d a w o o d Pat h 192nd St WICONTRL166thStW205thCtWJusticeWayFinchP a t h 176thStWGilletteWay161stStWLakeForestCirIslandTerHibiscus A v e162ndStW JenkinsWayHighview Ave163rdStWHawt h o r n Path IslandviewCir175th St WJacquard AveHanover Ave215th St WGrenada AveHeritageDr210th St W207thStWE lmC r eek L n Heywood AveHo l brookAveLakeForestDrFirestoneWayHave lockWayIpavaAve183rdStWHydeParkAveIcaleePathKerrvilleTrlL afayetteWay205th St WINDIANAAVE202nd St WLakevilleBlvdLaredoAveK nollwoodCir Judicial RdDraft Year2021202220232024202520262027202820292030