Loading...
HomeMy WebLinkAbout19731 Henning Avenue-SURVEYZoning = RS-3 EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION ENGINEERING REVIEWED Date:__________________07/24/2020 corlowsky *Maintain 6" between bottom of siding and sod. *No structures in easements. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flush with the sod. This will be scheduled with thelandscape inspection. *Draintile connection required.