HomeMy WebLinkAbout16264 Durango Tr Survey1.Bearings are based on the recorded plat.2.Building dimensions shown are for horizontal and vertical placement ofstructure only. See architectural plans for building and foundationdimensions.3.No specific soils investigation has been completed on this lot by JamesR. Hill, Inc. the suitability of soils to support the specific house proposedis not the responsibility of James R. Hill, Inc. or the surveyor.4.No specific title search for existence or non-existence of recorded orun-recorded easements has been conducted by the surveyor as a partof this survey. Only easements per the recorded plat are shown.5.Proposed grades shown were taken from the grading &/ordevelopment plan prepared by James R. Hill, Inc.6.Grading plan date/revision date: 10/11/18.7.Plan No. SBF19.11.04-THE 2190-ELEVATION CNOTESProposedGarage Floor @ Front= 930.8Garage Top of Block= 931.5House Top of Block= 931.5Lowest Floor= 923.5Top of Block at Egress Window= 926.7PROPERTY DESCRIPTION16264 Durango Trail, Lakeville, MinnesotaPROPERTY ADDRESSSURVEYOR'S CERTIFICATEFLOOR ELEVATIONSTop nut of hydrant located at Lot 12, Block 4 = 929.42BENCHMARKDenotes set spikeDenotes set iron monumentDenotes found iron monumentDenotes proposed drainageDenotes top of curbDenotes existing elevationDenotes proposed elevationJames R. Hill, Inc.
PHONE: 952.890.6044 www.jrhinc.com
PLANNERS / ENGINEERS / SURVEYORS
CERTIFICATE OF SURVEY
FORDRAWN BYDATEREVISIONSCAD FILEPROJECT NO.SHEET 1 OF 1Lot= 7,272 sq. ft.House/Garage= 1,634 sq. ft.Porch= 120 sq. ft.Driveway= 797 sq. ft.Patio= 144 sq. ft.Total Impervious= 2,695 sq. ft. or37.1 % of lotHARD COVER CALCULATIONSFront(Garage)= 25'(House)= 20'Side(House)= 7'(Garage)= 7'(Street)= 15'Rear= 20'SETBACKSI hereby certify that this survey, plan or report was prepared by me or undermy direct supervision and that I am a duly Licensed Land Surveyor under thelaws of the State of Minnesota. That this survey does not purport to show allimprovements, easements or encroachments, to the property except asshown thereon.Signed this 1st day of July, 2020Marcus F. Hampton, MN L.S. No. 474817/1/20202999 WEST C.R. 42, SUITE 100, BURNSVILLE, MN 55306Lot 11, Block 4, SPIRIT OF BRANDTJEN FARM 19TH ADDITION, Dakota County,MinnesotaROBERT THOMAS HOMESJCB
Lot 11, Block 4, SPIRIT OF BRANDTJEN FARM
19TH ADDITION, Dakota County, Minnesota400602.dwg400602The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.ENGINEERING REVIEWEDDate:__________________07/28/2020corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION*Maintain 6" between bottom of siding and sod.*No structures in easements.Planning DepartmentApprovedDate:__________________07/28/2020dmorey