Loading...
HomeMy WebLinkAbout18354 Greenstone Way-SurveyHOUSE ELEVATION DATA HOUSE TYPE = TWO STORY LOT TYPE = LOOKOUT BASEMENT WALL HEIGHT = 8.3 PROPOSED GARAGE FLOOR EL.= 1009.1 PROPOSED TOP OF BLOCK EL.= 1009.4 PROPOSED LOWEST FLOOR EL.= 1001.4 GRADING QUANTITIES (CY) COMMON FILL -302 COMMON CUT 217 FOOTINGS/TRENCHES 60 HARD SURFACES 26 TOTAL FILL -302 TOTAL CUT 303 TOTAL (+/-) 1 HOUSE ELEVATION DATA HOUSE TYPE = TWO STORY LOT TYPE = LOOKOUT BASEMENT WALL HEIGHT = 8.3 PROPOSED GARAGE FLOOR EL.= 1009.1 PROPOSED TOP OF BLOCK EL.= 1009.4 PROPOSED LOWEST FLOOR EL.= 1001.4 GRADING QUANTITIES (CY) COMMON FILL -302 COMMON CUT 217 FOOTINGS/TRENCHES 60 HARD SURFACES 26 TOTAL FILL -302 TOTAL CUT 303 TOTAL (+/-) 1 The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection. *Draintile connection required. ENGINEERING REVIEWED Date:__________________07/29/2020 corlowsky EROSION CONTROLMUST BE INSTALLED BEFORE EXCAVATION *Maintain 6" between bottom of siding and sod. *No structures in easements.