Loading...
HomeMy WebLinkAbout8055 180th Street West-SURVEYZoning = RS-4 *Maintain 6" between bottom of siding and sod. *No structures in easements. EROSION CONTROL MUST BE INSTALLEDBEFORE EXCAVATION Approx. draintile cleanout location ENGINEERING REVIEWED Date:__________________08/14/2020 corlowsky *Draintile connection required. The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.