HomeMy WebLinkAbout8055 180th Street West-SURVEYZoning = RS-4
*Maintain 6" between bottom of siding and sod.
*No structures in easements.
EROSION CONTROL
MUST BE INSTALLEDBEFORE EXCAVATION
Approx. draintile
cleanout location
ENGINEERING REVIEWED
Date:__________________08/14/2020 corlowsky
*Draintile connection required.
The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.