Loading...
HomeMy WebLinkAbout17955 Eclipse Ave SurveyZoning = RM-1ENGINEERING REVIEWEDDate:__________________07/10/2020corlowsky*Maintain 6" between bottom of siding and sod.*No structures in easements.The curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION