HomeMy WebLinkAbout17319 Eagleview Dr SurveyThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.*Draintile connection required.Approximate draintilecleanout location*Maintain 6" between bottom of siding and sod.*No structures in easements.ENGINEERING REVIEWEDDate:__________________08/20/2020corlowskyEROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATION