Loading...
HomeMy WebLinkAboutLA183333 SIGURD ENGINEERING LLC STRUCTURAL (612)396-4992 SIGURDENGINEERING.COM 20 October 2020 I �� �t:� � 1�;��� �.�,a;.�,�-�%� 1_./' RE: Collins Deck (1 of 3-Ply Beam Splice Remedy) � �� � � '� � 16848 Enchanted Court Lakeville, MN 55044 Dear Mr.Schlafman (Paul), As per your request, I investigated the beam splice of the inboard-ply-only of(3) 2x12s constituting the header at the deck-only area of the addition ("deck-only" is used to deconflict with the three-season porch). I found the following: • 10' header span • 16'joist system span I conclude 10d nails @ 10" oc at the top and bottom connecting each ply to the other respectively and a 4"x 6" minimum mending plate at the splice of the inboard ply will suffice structurally. The information and opinions contained herein are based upon the limited investigation described at the beginning of this report. No warranties are expressed or implied regarding the existence of other unknown conditions not specifically addressed. My work is in accordance with generally accepted engineering standards and is not intended to be relied upon or transferred to individuals other than the addressee. Should information or conditions become known which differ from the discussion herein,they may alter the opinions or conclusions of the undersigned. Please call if you have any questions. Sincerely, � , .. ,� � ,�!^ _ti�--r �_/1�/�-' •- Erik S. Lund, P.E. I hereby certify that this plan, specification,or report was prepared by me or under my direct supervision and that I am a duly Licensed (#52200) PE (Structural) under the laws of the State of MN. �' i' � `� / l/��� ��'"�'�= 2:05 PM 20 October 2020 Page 1 of 1