HomeMy WebLinkAbout17961 Eventide Way SurveyZoning = RS-4*Maintain 6" between bottom of siding and sod.*No structures in easements.EROSION CONTROLMUST BE INSTALLEDBEFORE EXCAVATIONThe curb box, drain tile cleanout, and catchbasin(if applicable) must be inspected andaccepted before As-Built escrow monies willbe released. All structures must be flushwith the sod. This will be scheduled with thelandscape inspection.923'922'ENGINEERING REVIEWEDDate:__________________08/20/2020corlowsky